EP2490382 - Method for intercommunicating between private network user and network with QOS guarantee [Right-click to bookmark this link] | |||
Former [2012/34] | Method and system for intercommunicating between private network user and network with QOS guarantee | ||
[2015/51] | Status | No opposition filed within time limit Status updated on 14.04.2017 Database last updated on 24.07.2024 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2016/23] |
Former [2012/34] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District, Shenzhen Guangdong 518129 / CN | Inventor(s) | 01 /
He, Yungu Huawei Administration Building Bantian, Longgang District 518129 Shenzhen / CN | [2012/34] | Representative(s) | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstraße 25 80992 München / DE | [N/P] |
Former [2016/23] | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstrasse 8 80992 München / DE | ||
Former [2012/40] | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Dessauerstrasse 3 80992 München / DE | ||
Former [2012/34] | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Ridlerstrasse 55 80339 München / DE | Application number, filing date | 12164991.7 | 19.04.2006 | [2012/34] | Priority number, date | CN20051066237 | 25.04.2005 Original published format: CN200510066237 | [2012/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2490382 | Date: | 22.08.2012 | Language: | EN | [2012/34] | Type: | B1 Patent specification | No.: | EP2490382 | Date: | 08.06.2016 | Language: | EN | [2016/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.07.2012 | Classification | IPC: | H04L12/66, H04L29/06, H04L29/08, H04L29/12 | [2015/51] | CPC: |
H04L12/56 (EP,US);
H04L47/70 (EP,US);
H04L47/786 (EP,US);
H04L47/803 (EP,US);
H04L61/2575 (EP,US);
H04L67/61 (EP,US)
|
Former IPC [2012/34] | H04L12/56, H04L12/66, H04L29/06, H04L29/08, H04L29/12 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2012/34] | Title | German: | Verfahren zur Kommunikation zwischen einem privaten Netzwerknutzer und einem Netzwerk mit QOS-Garantie | [2015/51] | English: | Method for intercommunicating between private network user and network with QOS guarantee | [2015/51] | French: | Procédé pour une intercommunication entre un utilisateur de réseau privé et un réseau avec garantie QOS | [2015/51] |
Former [2012/34] | Verfahren und System zur Kommunikation zwischen einem privaten Netzwerknutzer und einem Netzwerk mit QOS-Garantie | ||
Former [2012/34] | Method and system for intercommunicating between private network user and network with QOS guarantee | ||
Former [2012/34] | Procédé et système pour une intercommunication entre un utilisateur de réseau privé et un réseau avec garantie QOS | Examination procedure | 20.04.2012 | Examination requested [2012/34] | 22.02.2013 | Amendment by applicant (claims and/or description) | 23.03.2015 | Despatch of a communication from the examining division (Time limit: M06) | 02.10.2015 | Reply to a communication from the examining division | 26.11.2015 | Communication of intention to grant the patent | 06.04.2016 | Fee for grant paid | 06.04.2016 | Fee for publishing/printing paid | 06.04.2016 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP06722372.7 / EP1879335 | Opposition(s) | 09.03.2017 | No opposition filed within time limit [2017/20] | Fees paid | Renewal fee | 20.04.2012 | Renewal fee patent year 03 | 20.04.2012 | Renewal fee patent year 04 | 20.04.2012 | Renewal fee patent year 05 | 20.04.2012 | Renewal fee patent year 06 | 20.04.2012 | Renewal fee patent year 07 | 02.05.2013 | Renewal fee patent year 08 | 30.04.2014 | Renewal fee patent year 09 | 30.04.2015 | Renewal fee patent year 10 | 02.05.2016 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.04.2006 | AT | 08.06.2016 | BE | 08.06.2016 | BG | 08.06.2016 | CY | 08.06.2016 | CZ | 08.06.2016 | DK | 08.06.2016 | EE | 08.06.2016 | ES | 08.06.2016 | FI | 08.06.2016 | IT | 08.06.2016 | LT | 08.06.2016 | LV | 08.06.2016 | MC | 08.06.2016 | NL | 08.06.2016 | PL | 08.06.2016 | RO | 08.06.2016 | SE | 08.06.2016 | SI | 08.06.2016 | SK | 08.06.2016 | TR | 08.06.2016 | GR | 09.09.2016 | IS | 08.10.2016 | PT | 10.10.2016 | [2020/15] |
Former [2019/46] | HU | 19.04.2006 | |
AT | 08.06.2016 | ||
BE | 08.06.2016 | ||
BG | 08.06.2016 | ||
CY | 08.06.2016 | ||
CZ | 08.06.2016 | ||
DK | 08.06.2016 | ||
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
MC | 08.06.2016 | ||
NL | 08.06.2016 | ||
PL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
SI | 08.06.2016 | ||
SK | 08.06.2016 | ||
GR | 09.09.2016 | ||
IS | 08.10.2016 | ||
PT | 10.10.2016 | ||
Former [2019/39] | HU | 19.04.2006 | |
AT | 08.06.2016 | ||
BE | 08.06.2016 | ||
BG | 08.06.2016 | ||
CZ | 08.06.2016 | ||
DK | 08.06.2016 | ||
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
MC | 08.06.2016 | ||
NL | 08.06.2016 | ||
PL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
SI | 08.06.2016 | ||
SK | 08.06.2016 | ||
GR | 09.09.2016 | ||
IS | 08.10.2016 | ||
PT | 10.10.2016 | ||
Former [2019/31] | HU | 19.04.2006 | |
AT | 08.06.2016 | ||
BE | 08.06.2016 | ||
CZ | 08.06.2016 | ||
DK | 08.06.2016 | ||
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
MC | 08.06.2016 | ||
NL | 08.06.2016 | ||
PL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
SI | 08.06.2016 | ||
SK | 08.06.2016 | ||
GR | 09.09.2016 | ||
IS | 08.10.2016 | ||
PT | 10.10.2016 | ||
Former [2018/06] | AT | 08.06.2016 | |
BE | 08.06.2016 | ||
CZ | 08.06.2016 | ||
DK | 08.06.2016 | ||
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
MC | 08.06.2016 | ||
NL | 08.06.2016 | ||
PL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
SI | 08.06.2016 | ||
SK | 08.06.2016 | ||
GR | 09.09.2016 | ||
IS | 08.10.2016 | ||
PT | 10.10.2016 | ||
Former [2017/37] | AT | 08.06.2016 | |
BE | 08.06.2016 | ||
CZ | 08.06.2016 | ||
DK | 08.06.2016 | ||
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
NL | 08.06.2016 | ||
PL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
SI | 08.06.2016 | ||
SK | 08.06.2016 | ||
GR | 09.09.2016 | ||
IS | 08.10.2016 | ||
PT | 10.10.2016 | ||
Former [2017/11] | AT | 08.06.2016 | |
BE | 08.06.2016 | ||
CZ | 08.06.2016 | ||
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
NL | 08.06.2016 | ||
PL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
SK | 08.06.2016 | ||
GR | 09.09.2016 | ||
IS | 08.10.2016 | ||
PT | 10.10.2016 | ||
Former [2017/10] | BE | 08.06.2016 | |
CZ | 08.06.2016 | ||
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
NL | 08.06.2016 | ||
PL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
SK | 08.06.2016 | ||
GR | 09.09.2016 | ||
IS | 08.10.2016 | ||
Former [2017/09] | CZ | 08.06.2016 | |
EE | 08.06.2016 | ||
ES | 08.06.2016 | ||
FI | 08.06.2016 | ||
IT | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
NL | 08.06.2016 | ||
RO | 08.06.2016 | ||
SE | 08.06.2016 | ||
GR | 09.09.2016 | ||
Former [2016/52] | ES | 08.06.2016 | |
FI | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
NL | 08.06.2016 | ||
SE | 08.06.2016 | ||
GR | 09.09.2016 | ||
Former [2016/51] | ES | 08.06.2016 | |
FI | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
GR | 09.09.2016 | ||
Former [2016/50] | ES | 08.06.2016 | |
FI | 08.06.2016 | ||
LT | 08.06.2016 | ||
LV | 08.06.2016 | ||
Former [2016/49] | FI | 08.06.2016 | |
LT | 08.06.2016 | ||
Former [2016/46] | LT | 08.06.2016 | Documents cited: | Search | [XA]CN1592300 (HUAWEI TECH CO LTD [CN]) [X] 1-4,6,9-11 [A] 5,7,8; | EP1667378 [ ] (HUAWEI TECH CO LTD [CN]) [ ] * paragraph [0007] - paragraph [0012] *; | [A] - "Telecommunications and Internet Converged Services and Protocols for Advanced Networking (TISPAN); IP Multimedia Subsystem (IMS);Stage 2 TISPAN NGN Release 1 TS.23.228 Release 6 modified; Draft ETSI TS 2XXXXX", ETSI STANDARDS, LIS, SOPHIA ANTIPOLIS CEDEX, FRANCE, (20050101), no. V 0.0.3, ISSN 0000-0001, XP014028797 [A] 1-12 * page 43 - page 44 * |