| EP2484708 - Novel fast curing ultra high solids low voc epoxy primer compositions for aggressive corrosive environments [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 25.08.2017 Database last updated on 11.04.2026 | |
| Former | Grant of patent is intended Status updated on 18.08.2017 | ||
| Former | Examination is in progress Status updated on 11.08.2017 | ||
| Former | Grant of patent is intended Status updated on 13.03.2017 | Most recent event Tooltip | 03.07.2025 | Change: Despatch of interlocutory decision | Applicant(s) | For all designated states Hempel A/S Lundtoftegårdsvej 90 2800 Kongens Lyngby / DK | [2021/17] |
| Former [2013/39] | For all designated states Hempel A/S Lundtoftegårdsvej 91 2800 Kongens Lyngby / DK | ||
| Former [2012/32] | For all designated states HEMPEL A/S Lundtoftevej 150 2800 Lyngby / DK | Inventor(s) | 01 /
Hansen, Karl-Johan Ramsøvejen 52 Ramsølille 4622 Havdrup / DK | 02 /
Nysteen, Søren Mørch Virum Stationsvej 212 2830 Virum / DK | [2012/32] | Representative(s) | Inspicos P/S Strandvejen 60 2900 Hellerup / DK | [N/P] |
| Former [2017/39] | Inspicos P/S Kogle Allé 2 2970 Hørsholm / DK | ||
| Former [2012/32] | Inspicos A/S Kogle Allé 2 P.O. Box 45 2970 Hørsholm / DK | Application number, filing date | 12166282.9 | 22.05.2009 | [2012/32] | Priority number, date | EP20080156796 | 23.05.2008 Original published format: EP 08156796 | [2012/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2484708 | Date: | 08.08.2012 | Language: | EN | [2012/32] | Type: | A3 Search report | No.: | EP2484708 | Date: | 24.10.2012 | Language: | EN | [2012/43] | Type: | B1 Patent specification | No.: | EP2484708 | Date: | 27.09.2017 | Language: | EN | [2017/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.09.2012 | Classification | IPC: | C08G18/38, C08L63/00, C08L63/02, C08L75/00, C09D163/00, C09D163/02, C09D175/02, C09D175/04 | [2012/32] | CPC: |
C09D175/04 (EP);
C08L63/00 (EP);
C09D163/00 (EP)
| C-Set: |
C09D163/00, C08L2666/04 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2017/39] |
| Former [2012/32] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Neue schnellaushärtende Epoxy-Primer-Zusammensetzungen mit hohem Feststoff-Gehalt und niedrigem VOC-Gehalt für korrosive Umgebungen. | [2017/13] | English: | Novel fast curing ultra high solids low voc epoxy primer compositions for aggressive corrosive environments | [2012/32] | French: | Nouvelles compositions primaires à base époxy à faible taux VOC, tres haut pourcentage de solide et reticulant rapidement, pour environnements aggressifs | [2012/32] |
| Former [2012/32] | Neue schnellaushärtende Epoxy-Primer-Zusammensetzungen mit hohem Feststoff-Gehalt und niedrigem VOC-Gehalt für korrosive Umgebungen | Examination procedure | 15.01.2013 | Amendment by applicant (claims and/or description) | 14.02.2013 | Examination requested [2013/13] | 08.04.2013 | Despatch of a communication from the examining division (Time limit: M08) | 18.12.2013 | Reply to a communication from the examining division | 05.12.2014 | Despatch of a communication from the examining division (Time limit: M04) | 23.03.2015 | Reply to a communication from the examining division | 10.06.2015 | Despatch of a communication from the examining division (Time limit: M06) | 17.12.2015 | Reply to a communication from the examining division | 09.05.2016 | Despatch of a communication from the examining division (Time limit: M04) | 19.09.2016 | Reply to a communication from the examining division | 14.03.2017 | Communication of intention to grant the patent | 19.07.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.07.2017 | Fee for grant paid | 24.07.2017 | Fee for publishing/printing paid | 17.08.2017 | Information about intention to grant a patent | 17.08.2017 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP09749928.9 / EP2283056 | Divisional application(s) | EP13172326.4 / EP2653485 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20090749928) is 09.06.2011 | Opposition(s) | Opponent(s) | 01
26.06.2018
03.07.2018
ADMISSIBLE Akzo Nobel Coatings International B.V. Christian Neefestraat 2 1077 WW Amsterdam / NL Opponent's representative Akzo Nobel IP Department Christian Neefestraat 2 1077 WW Amsterdam / NL | [2022/50] |
| Former [2018/31] | |||
| Opponent(s) | 01
26.06.2018
ADMISSIBLE Akzo Nobel Coatings International B.V. Velperweg 76 6824 BM Arnhem / NL Opponent's representative Akzo Nobel IP Department Velperweg 76 6824 BM Arnhem / NL | 12.07.2018 | Invitation to proprietor to file observations on the notice of opposition | 22.11.2018 | Reply of patent proprietor to notice(s) of opposition | 10.12.2019 | Date of oral proceedings | 31.01.2020 | Despatch of minutes of oral proceedings | 17.01.2024 | Despatch of a communication from the opposition division (Time limit: M04) | 15.05.2024 | Reply to a communication from the opposition division | 06.08.2024 | Despatch of a communication from the opposition division (Time limit: M02) | 02.10.2024 | Reply to a communication from the opposition division | 16.01.2025 | Despatch of a communication from the opposition division (Time limit: M02) | 24.02.2025 | Reply to a communication from the opposition division | 09.07.2025 | Despatch of interlocutory decision in opposition | Appeal following opposition | 08.04.2020 | Appeal received No. T0813/20 | 09.06.2020 | Statement of grounds filed | 05.07.2023 | Result of appeal procedure: maintenance in amended form | 04.10.2023 | Despatch of the decision of the Board of Appeal | 26.03.2020 | Appeal received No. T0813/20 | 08.06.2020 | Statement of grounds filed | 05.07.2023 | Result of appeal procedure: maintenance in amended form | 04.10.2023 | Despatch of the decision of the Board of Appeal | 05.07.2023 | Date of oral proceedings | Fees paid | Renewal fee | 03.09.2012 | Renewal fee patent year 03 | 03.09.2012 | Renewal fee patent year 04 | 15.05.2013 | Renewal fee patent year 05 | 23.05.2014 | Renewal fee patent year 06 | 13.05.2015 | Renewal fee patent year 07 | 17.05.2016 | Renewal fee patent year 08 | 30.05.2017 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.05.2009 | AT | 27.09.2017 | CY | 27.09.2017 | CZ | 27.09.2017 | EE | 27.09.2017 | FI | 27.09.2017 | HR | 27.09.2017 | IT | 27.09.2017 | LT | 27.09.2017 | LV | 27.09.2017 | MC | 27.09.2017 | MK | 27.09.2017 | RO | 27.09.2017 | SI | 27.09.2017 | SK | 27.09.2017 | BG | 27.12.2017 | NO | 27.12.2017 | GR | 28.12.2017 | IS | 27.01.2018 | IE | 22.05.2018 | LU | 22.05.2018 | MT | 22.05.2018 | BE | 31.05.2018 | CH | 31.05.2018 | LI | 31.05.2018 | [2020/31] |
| Former [2020/28] | HU | 22.05.2009 | |
| AT | 27.09.2017 | ||
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| MC | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| IE | 22.05.2018 | ||
| LU | 22.05.2018 | ||
| MT | 22.05.2018 | ||
| BE | 31.05.2018 | ||
| CH | 31.05.2018 | ||
| LI | 31.05.2018 | ||
| Former [2020/08] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| MC | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| IE | 22.05.2018 | ||
| LU | 22.05.2018 | ||
| MT | 22.05.2018 | ||
| BE | 31.05.2018 | ||
| CH | 31.05.2018 | ||
| LI | 31.05.2018 | ||
| Former [2019/24] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| MC | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| IE | 22.05.2018 | ||
| LU | 22.05.2018 | ||
| BE | 31.05.2018 | ||
| CH | 31.05.2018 | ||
| LI | 31.05.2018 | ||
| Former [2019/19] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| MC | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| IE | 22.05.2018 | ||
| LU | 22.05.2018 | ||
| CH | 31.05.2018 | ||
| LI | 31.05.2018 | ||
| Former [2019/17] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| MC | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| LU | 22.05.2018 | ||
| CH | 31.05.2018 | ||
| LI | 31.05.2018 | ||
| Former [2019/12] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| MC | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| CH | 31.05.2018 | ||
| LI | 31.05.2018 | ||
| Former [2019/06] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| MC | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| Former [2018/52] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SI | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| Former [2018/24] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| IT | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| Former [2018/23] | AT | 27.09.2017 | |
| CZ | 27.09.2017 | ||
| EE | 27.09.2017 | ||
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| RO | 27.09.2017 | ||
| SK | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| IS | 27.01.2018 | ||
| Former [2018/21] | CZ | 27.09.2017 | |
| FI | 27.09.2017 | ||
| HR | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| Former [2018/12] | FI | 27.09.2017 | |
| HR | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| LV | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| Former [2018/11] | FI | 27.09.2017 | |
| HR | 27.09.2017 | ||
| LT | 27.09.2017 | ||
| BG | 27.12.2017 | ||
| NO | 27.12.2017 | ||
| GR | 28.12.2017 | ||
| Former [2018/08] | FI | 27.09.2017 | |
| LT | 27.09.2017 | ||
| NO | 27.12.2017 | ||
| Former [2018/07] | LT | 27.09.2017 | |
| NO | 27.12.2017 | Documents cited: | Search | [Y] WO2006119770 (HEMPEL AS et al.) | [A] US5987727 (SHAFIK AHMED et al.) | [Y] EP0257513 (PPG INDUSTRIES INC et al.) | [DY] US5126170 (ZWIENER CHRISTIAN et al.) | by applicant | WO2008125610 | US5126170 | Opposition | EP0846710 | EP1788048 | WO2007054304 | WO2006131359 | US4279962 | DE3531370 | WO2006119770 | JOTUN: "Polymastic 2000", TECHNICAL DATA SHEET, 6 December 2007 (2007-12-06), pages 1 - 4, XP055498826 | JOTUN: "Marathon IQ", TECHNICAL DATA SHEET, 6 December 2007 (2007-12-06), pages 1 - 4, XP055498827 | WILLAMETTE VALLEY COMPANY: "POLYQuick Epoxy Primer", TECHNICAL DATA SHEET, March 2008 (2008-03-01), pages 1 - 2, XP055498829 | INTERNATIONAL PROTECTIVE COATINGS: "Intercure 200 HS Epoxy", PRODUCT DATA SHEET, 1 June 1997 (1997-06-01), pages 1 - 4, XP055498832 | ROLAND DITTMEYER ET AL.,: "Winnacker-Khler Chemische Technik Prozesse und Produkte 5. Auflage", vol. 7, 2004, WILEY-VCH VERLAG, article HANS-JOACHIM STREITBERGER ET AL.,: "Kunstharze und Lacke", pages: 4pp, v, vii-xi, 652 - 658, XP055498835 | R.R. MYERS AND J.S. LONG: "Film-Forming Compositions", vol. 1, part 1 1967, MARCEL DEKKER, INC.,, article GEORGE R. SOMERVILLE: "Epoxy Resin Coatings", pages: 2pp, vi-vii, xv-xx, 255, XP055498840 | THOMAS BAKER: "Polyaspartics- Modern binders for highly efficient 2K PUR systems", PRESENTATION AT THE ECS FORUM, 10 May 2007 (2007-05-10), pages 1 - 18, XP055498844 | INTERNATIONAL PROTECTIVE COATINGS: "Intercure 99", PRODUCT DATA SHEET, 11 December 2008 (2008-12-11), pages 1 - 4, XP055498846 | INTERNATIONAL PROTECTIVE COATINGS: "Interzinc 52", PRODUCT DATA SHEET, 2 August 2007 (2007-08-02), pages 1 - 4, XP055498848 | MARC BROEKAERT: "Polyurea Spray Coatings: The Technology and Latest Developments", 26 December 2004 (2004-12-26), pages 1 - 16, XP002523268, Retrieved from the Internet | MARC BROEKAERT: "Polyurea Spray Coatings: The Technology and Latest Developments", PCI PAINT & COATINGS INDUSTRY, 10 October 2002 (2002-10-10), pages 1 - 10, XP055498853, Retrieved from the Internet | INTERNATIONAL ORGANIZATION FOR STANDARDIZATION: "Paints and varnishes- Determination of percentage volume of non-volatile matter by measuring the density of a dried coating", INTERNATIONAL STANDARD- ISO 3233:1998(E), THIRD EDITION, 15 August 1998 (1998-08-15), pages 481 - 496, XP055498852 |