blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2528132

EP2528132 - Method of manufacturing battery, and battery [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.10.2020
Database last updated on 13.09.2024
FormerThe patent has been granted
Status updated on  22.11.2019
FormerGrant of patent is intended
Status updated on  02.07.2019
FormerExamination is in progress
Status updated on  16.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
GS Yuasa International Ltd.
1, Inobaba-cho, Nishinosho
Kisshoin, Minami-ku
Kyoto-shi, Kyoto 601-8520 / JP
[2015/35]
Former [2012/48]For all designated states
Lithium Energy Japan
1, Inobaba-cho
Nishinosho, Kisshoin
Minami-ku
Kyoto-shi
Kyoto 601-8520 / JP
Inventor(s)01 / Munenaga, Noriyoshi
c/o Lithium Energy Japan
780-1, Hachiya
Ritto-shi, Shiga 520-3021 / JP
02 / Nakamura, Taku
c/o Lithium Energy Japan
780-1, Hachiya
Ritto-shi, Shiga 520-3021 / JP
03 / Mashiko, Wataru
c/o Lithium Energy Japan
780-1, Hachiya
Ritto-shi, Shiga 520-3021 / JP
04 / Kawahara, Takeshi
c/o Lithium Energy Japan
780-1, Hachiya
Ritto-shi, Shiga 520-3021 / JP
 [2012/48]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
Siebertstrasse 3
81675 München / DE
[2019/52]
Former [2012/48]Vossius & Partner
Siebertstrasse 4
81675 München / DE
Application number, filing date12169049.923.05.2012
[2012/48]
Priority number, dateJP2011011722525.05.2011         Original published format: JP 2011117225
JP2012009335416.04.2012         Original published format: JP 2012093354
[2012/48]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2528132
Date:28.11.2012
Language:EN
[2012/48]
Type: A3 Search report 
No.:EP2528132
Date:03.12.2014
Language:EN
[2014/49]
Type: B1 Patent specification 
No.:EP2528132
Date:25.12.2019
Language:EN
[2019/52]
Search report(s)(Supplementary) European search report - dispatched on:EP05.11.2014
ClassificationIPC:H01M2/02, // H01M10/04
[2014/49]
CPC:
H01M50/103 (EP,US); H01M10/0413 (EP,US); H01M10/0431 (EP,US);
Y02E60/10 (EP); Y02P70/50 (EP); Y10T29/49108 (EP,US)
Former IPC [2012/48]H01M2/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/29]
Former [2012/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren zur Herstellung einer Batterie und Batterie[2012/48]
English:Method of manufacturing battery, and battery[2012/48]
French:Procédé de fabrication de batterie et batterie[2012/48]
Examination procedure02.06.2015Amendment by applicant (claims and/or description)
02.06.2015Examination requested  [2015/29]
15.12.2016Despatch of a communication from the examining division (Time limit: M06)
22.06.2017Reply to a communication from the examining division
03.04.2018Despatch of a communication from the examining division (Time limit: M06)
11.10.2018Reply to a communication from the examining division
03.07.2019Communication of intention to grant the patent
13.11.2019Fee for grant paid
13.11.2019Fee for publishing/printing paid
13.11.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.12.2016
Opposition(s)28.09.2020No opposition filed within time limit [2020/49]
Fees paidRenewal fee
17.03.2014Renewal fee patent year 03
08.04.2015Renewal fee patent year 04
30.03.2016Renewal fee patent year 05
23.05.2017Renewal fee patent year 06
23.05.2018Renewal fee patent year 07
22.05.2019Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.05.2012
AL25.12.2019
AT25.12.2019
CY25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
MK25.12.2019
MT25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
TR25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
GB23.05.2020
IE23.05.2020
LU23.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
[2022/32]
Former [2022/27]HU23.05.2012
AL25.12.2019
AT25.12.2019
CY25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
MT25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
TR25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
GB23.05.2020
IE23.05.2020
LU23.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
Former [2022/26]AL25.12.2019
AT25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
TR25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
GB23.05.2020
IE23.05.2020
LU23.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
Former [2021/23]AL25.12.2019
AT25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
GB23.05.2020
IE23.05.2020
LU23.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
Former [2021/22]AL25.12.2019
AT25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
GB23.05.2020
IE23.05.2020
LU23.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/20]AL25.12.2019
AT25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
IE23.05.2020
LU23.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/15]AL25.12.2019
AT25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
LU23.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/10]AL25.12.2019
AT25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
IT25.12.2019
LT25.12.2019
LV25.12.2019
MC25.12.2019
NL25.12.2019
PL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/08]AL25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
CH31.05.2020
LI31.05.2020
Former [2020/51]AL25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SI25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
Former [2020/47]AL25.12.2019
CZ25.12.2019
DK25.12.2019
EE25.12.2019
ES25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
Former [2020/40]AL25.12.2019
CZ25.12.2019
EE25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
IS25.04.2020
PT20.05.2020
Former [2020/37]AL25.12.2019
CZ25.12.2019
EE25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
SK25.12.2019
SM25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
PT20.05.2020
Former [2020/36]AL25.12.2019
CZ25.12.2019
EE25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
PT20.05.2020
Former [2020/35]AL25.12.2019
CZ25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RO25.12.2019
RS25.12.2019
SE25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
Former [2020/32]AL25.12.2019
FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
NL25.12.2019
RS25.12.2019
SE25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
Former [2020/25]FI25.12.2019
HR25.12.2019
LT25.12.2019
LV25.12.2019
RS25.12.2019
SE25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
Former [2020/23]FI25.12.2019
LT25.12.2019
LV25.12.2019
SE25.12.2019
BG25.03.2020
NO25.03.2020
GR26.03.2020
Former [2020/22]FI25.12.2019
LT25.12.2019
SE25.12.2019
BG25.03.2020
NO25.03.2020
Former [2020/21]NO25.03.2020
Documents cited:Search[A]US2087026  (GEYER HARVEY D) [A] 1-11 * the whole document *;
 [XI]US4010043  (SCHNEIDER ALAN A) [X] 1-3,6,7,10 * column 4, line 59 - column 5, line 44; figures 1-3 * [I] 4,8,9;
 [Y]JP2006040684  (MATSUSHITA ELECTRIC IND CO LTD) [Y] 5,11 * abstract *;
 [XYI]US2008166628  (KIM HEONGSIN [KR], et al) [X] 1-3,6,7,10 * paragraph [0039] - paragraph [0058]; figure 2 * [Y] 5,11 [I] 4,8,9;
 [A]US2009246621  (MIEBORI TADASHI [JP]) [A] 1-11* paragraph [0095] - paragraph [0117]; figures 2-4 *
ExaminationJP2001236929
 JP2002198011
by applicantJP2004349201
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.