blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2581610

EP2581610 - Mechanical assembly for the connection between two modular elements of telescopic poles for practicing sport, spare time activities and the like and telescopic poles for the practicing sport, spare time activities and the like provided with such a mechanical assembly [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.06.2016
Database last updated on 07.10.2024
Most recent event   Tooltip19.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 21.11.2018  [2018/47]
Applicant(s)For all designated states
Fizan S.r.l.
Via Borgo Tocchi, 18
36027 Rosa (VI) / IT
[2013/16]
Inventor(s)01 / Zaltron, Andrea
c/o
FIZAN S.r.l.
Via Borgo Tocchi, 18
I-36027 Rosà (VI) / IT
 [2013/16]
Representative(s)Contadin, Giorgio, et al
Praxi Intellectual Property S.p.A.
Via N. Tommaseo, 76/D
35131 Padova / IT
[2013/16]
Application number, filing date12172609.519.06.2012
[2013/16]
Priority number, dateIT2011VI0027212.10.2011         Original published format: IT VI20110272
[2013/16]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2581610
Date:17.04.2013
Language:EN
[2013/16]
Type: B1 Patent specification 
No.:EP2581610
Date:12.08.2015
Language:EN
[2015/33]
Search report(s)(Supplementary) European search report - dispatched on:EP15.01.2013
ClassificationIPC:A63C11/22, // F16B7/14
[2015/13]
CPC:
F16B7/149 (EP,US); A63C11/221 (EP,US); F16B7/1418 (EP,US);
Y10T403/32467 (EP,US)
Former IPC [2013/16]F16B7/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/33]
Former [2013/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Mechanische Baugruppe zur Verbindung zwischen zwei modularen Elementen teleskopischer Stangen zum Praktizieren von Sport, Freizeitaktivitäten und dergleichen, und teleskopische Stangen zum Praktizieren von Sport, Freizeitaktivitäten und dergleichen mit einer solchen mechanischen Baugruppe[2013/16]
English:Mechanical assembly for the connection between two modular elements of telescopic poles for practicing sport, spare time activities and the like and telescopic poles for the practicing sport, spare time activities and the like provided with such a mechanical assembly[2013/16]
French:Ensemble mécanique pour le raccordement entre deux éléments modulaires de montants télescopiques pour pratiquer un sport, des activités de temps libre et similaires et montants télescopiques pour la pratique du sport, des activités de temps libre et analogues équipés d'un tel ensemble mécanique[2013/16]
Examination procedure25.06.2013Amendment by applicant (claims and/or description)
25.06.2013Examination requested  [2013/31]
10.03.2015Communication of intention to grant the patent
06.07.2015Fee for grant paid
06.07.2015Fee for publishing/printing paid
06.07.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.03.2015
Opposition(s)13.05.2016No opposition filed within time limit [2016/29]
Fees paidRenewal fee
23.06.2014Renewal fee patent year 03
22.06.2015Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.06.2012
AL12.08.2015
AT12.08.2015
BE12.08.2015
BG12.08.2015
CY12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
MC12.08.2015
MK12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
SM12.08.2015
TR12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
[2018/47]
Former [2018/38]HU19.06.2012
AT12.08.2015
BE12.08.2015
BG12.08.2015
CY12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
MC12.08.2015
MK12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
SM12.08.2015
TR12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2018/31]HU19.06.2012
AT12.08.2015
BE12.08.2015
CY12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
MC12.08.2015
MK12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
SM12.08.2015
TR12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2018/29]HU19.06.2012
AT12.08.2015
BE12.08.2015
CY12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
MC12.08.2015
MK12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
SM12.08.2015
TR12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2018/28]HU19.06.2012
AT12.08.2015
BE12.08.2015
CY12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
MC12.08.2015
MK12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
SM12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2017/07]AT12.08.2015
BE12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
MC12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2017/03]AT12.08.2015
BE12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/36]AT12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SI12.08.2015
SK12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/23]AT12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
NL12.08.2015
PL12.08.2015
RO12.08.2015
RS12.08.2015
SE12.08.2015
SK12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/22]AT12.08.2015
CZ12.08.2015
DK12.08.2015
EE12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
NL12.08.2015
PL12.08.2015
RS12.08.2015
SE12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/20]AT12.08.2015
DK12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
NL12.08.2015
PL12.08.2015
RS12.08.2015
SE12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/14]AT12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
NL12.08.2015
PL12.08.2015
RS12.08.2015
SE12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/11]AT12.08.2015
ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
PL12.08.2015
RS12.08.2015
SE12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/10]ES12.08.2015
FI12.08.2015
HR12.08.2015
LT12.08.2015
LV12.08.2015
PL12.08.2015
RS12.08.2015
SE12.08.2015
NO12.11.2015
GR13.11.2015
IS12.12.2015
PT14.12.2015
Former [2016/09]FI12.08.2015
LT12.08.2015
LV12.08.2015
NO12.11.2015
GR13.11.2015
Former [2016/08]LT12.08.2015
NO12.11.2015
Former [2016/07]LT12.08.2015
Documents cited:Search[X]FR984264  (LOUISE BALLOIS) [X] 1-6,8,11,12,15 * figures 1-3 *;
 [X]US2009008213  (TIMS PHILIP [GB], et al) [X] 1-5,15 * abstract * * figures 1-3 * * claim 39 *;
 [X]FR2600197  (DEN BERGH STEPHANE VAN [FR]) [X] 1 * figures 1-6 *;
 [A]US2011013980  (BENSUSSAN BERNARD [US], et al) [A] 1-15 * the whole document *;
 [A]GB2409009  (SHIN TAI SPURT WATER GARDEN [TW]) [A] 1-15 * the whole document *
by applicantFR984264
 US2009008213
 FR2600197
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.