EP2584770 - Electronic device and method for reply message composition [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.06.2015 Database last updated on 19.10.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, ON N2K 0A7 / CA | [2013/48] |
Former [2013/36] | For all designated states BlackBerry Limited 295 Phillip Street Waterloo ON N2L 3W8 / CA | ||
Former [2013/17] | For all designated states Research In Motion Limited 295 Phillip Street Waterloo, ON N2L 3W8 / CA | Inventor(s) | 01 /
Stovicek, Thomas Jan 2000 Bridge Drive, Suite 100 Ext. 62474 Redwood City, CA California 94065 / US | 02 /
Del Pasqua, Kieran Cloud 4701 Tahoe Blvd. Extension: 15539 Mississauga, Ontario L4W 0B5 / CA | [2013/17] | Representative(s) | Moore, Barry, et al Hanna Moore + Curley Garryard House 25/26 Earlsfort Terrace Dublin 2, D02 PX51 / IE | [N/P] |
Former [2013/17] | Moore, Barry, et al Hanna Moore & Curley 13 Lower Lad Lane Dublin 2 / IE | Application number, filing date | 12180328.2 | 13.08.2012 | [2013/17] | Priority number, date | US201161548168P | 17.10.2011 Original published format: US 201161548168 P | US201213536508 | 28.06.2012 Original published format: US201213536508 | [2013/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2584770 | Date: | 24.04.2013 | Language: | EN | [2013/17] | Type: | B1 Patent specification | No.: | EP2584770 | Date: | 06.08.2014 | Language: | EN | [2014/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.11.2012 | Classification | IPC: | G06Q10/10, H04M1/725, H04L12/58 | [2014/18] | CPC: |
G06Q10/107 (EP,US);
H04M1/72436 (EP,US);
H04L51/42 (EP,US)
|
Former IPC [2013/17] | H04M1/725, H04L12/58 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/17] | Title | German: | Elektronische Vorrichtung und Verfahren zur Antwortnachrichterstellung | [2013/17] | English: | Electronic device and method for reply message composition | [2013/17] | French: | Dispositif électronique et procédé pour la composition de messages de réponse | [2013/17] | Examination procedure | 13.08.2012 | Examination requested [2013/17] | 13.03.2013 | Amendment by applicant (claims and/or description) | 09.04.2014 | Communication of intention to grant the patent | 25.06.2014 | Fee for grant paid | 25.06.2014 | Fee for publishing/printing paid | 25.06.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.04.2014 | Opposition(s) | 07.05.2015 | No opposition filed within time limit [2015/29] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.08.2012 | AL | 06.08.2014 | AT | 06.08.2014 | BE | 06.08.2014 | CY | 06.08.2014 | CZ | 06.08.2014 | DK | 06.08.2014 | EE | 06.08.2014 | ES | 06.08.2014 | FI | 06.08.2014 | HR | 06.08.2014 | IT | 06.08.2014 | LT | 06.08.2014 | LV | 06.08.2014 | MC | 06.08.2014 | MK | 06.08.2014 | MT | 06.08.2014 | NL | 06.08.2014 | PL | 06.08.2014 | RO | 06.08.2014 | RS | 06.08.2014 | SE | 06.08.2014 | SI | 06.08.2014 | SK | 06.08.2014 | SM | 06.08.2014 | TR | 06.08.2014 | IE | 13.08.2014 | LU | 13.08.2014 | BG | 06.11.2014 | NO | 06.11.2014 | GR | 07.11.2014 | IS | 06.12.2014 | PT | 09.12.2014 | [2018/46] |
Former [2018/31] | HU | 13.08.2012 | |
AT | 06.08.2014 | ||
BE | 06.08.2014 | ||
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
MK | 06.08.2014 | ||
MT | 06.08.2014 | ||
NL | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SI | 06.08.2014 | ||
SK | 06.08.2014 | ||
SM | 06.08.2014 | ||
TR | 06.08.2014 | ||
IE | 13.08.2014 | ||
LU | 13.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2016/33] | HU | 13.08.2012 | |
AT | 06.08.2014 | ||
BE | 06.08.2014 | ||
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
MT | 06.08.2014 | ||
NL | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SI | 06.08.2014 | ||
SK | 06.08.2014 | ||
SM | 06.08.2014 | ||
TR | 06.08.2014 | ||
IE | 13.08.2014 | ||
LU | 13.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2016/32] | HU | 13.08.2012 | |
AT | 06.08.2014 | ||
BE | 06.08.2014 | ||
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
MT | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SI | 06.08.2014 | ||
SK | 06.08.2014 | ||
SM | 06.08.2014 | ||
IE | 13.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2016/28] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
MT | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SI | 06.08.2014 | ||
SK | 06.08.2014 | ||
SM | 06.08.2014 | ||
IE | 13.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2016/24] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SI | 06.08.2014 | ||
SK | 06.08.2014 | ||
SM | 06.08.2014 | ||
IE | 13.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/50] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SI | 06.08.2014 | ||
SK | 06.08.2014 | ||
IE | 13.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/37] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SK | 06.08.2014 | ||
IE | 13.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/27] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
MC | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SK | 06.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/23] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
CZ | 06.08.2014 | ||
DK | 06.08.2014 | ||
EE | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
SK | 06.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/22] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
DK | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
IT | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
PL | 06.08.2014 | ||
RO | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/19] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
PL | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
BE | 31.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/12] | AT | 06.08.2014 | |
CY | 06.08.2014 | ||
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
HR | 06.08.2014 | ||
LT | 06.08.2014 | ||
LV | 06.08.2014 | ||
PL | 06.08.2014 | ||
RS | 06.08.2014 | ||
SE | 06.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
IS | 06.12.2014 | ||
PT | 09.12.2014 | ||
Former [2015/11] | CY | 06.08.2014 | |
ES | 06.08.2014 | ||
FI | 06.08.2014 | ||
LT | 06.08.2014 | ||
PL | 06.08.2014 | ||
SE | 06.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
GR | 07.11.2014 | ||
PT | 09.12.2014 | ||
Former [2015/10] | ES | 06.08.2014 | |
FI | 06.08.2014 | ||
LT | 06.08.2014 | ||
SE | 06.08.2014 | ||
BG | 06.11.2014 | ||
NO | 06.11.2014 | ||
Former [2015/09] | FI | 06.08.2014 | |
LT | 06.08.2014 | ||
SE | 06.08.2014 | ||
Former [2015/08] | LT | 06.08.2014 | Documents cited: | Search | [A]US2004268265 (BERGER KELLY D [US]) [A] 1-15* abstract *; | [XYI]WO2008030967 (PALM INC [US], et al) [X] 1,13,15 * abstract * * paragraphs [0034] - [0078] * [Y] 1-15 [I] 1-15; | [I]WO2008141339 (UNISON TECHNOLOGIES LLC [US], et al) [I] 1-15 * abstract * * page 1, line 1 - page 2, line 13 * * page 7, line 3 - page 9, line 25 * * page 13, line 8 - page 15, line 26 *; | [Y]EP2096844 (VODAFONE HOLDING GMBH [DE]) [Y] 1-15 * the whole document * | by applicant | US7568011 |