EP2596999 - Wiper blade device with a spring core at least partially formed from a fibre composite material [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.02.2021 Database last updated on 12.08.2024 | |
Former | The patent has been granted Status updated on 13.03.2020 | ||
Former | Grant of patent is intended Status updated on 03.11.2019 | ||
Former | Examination is in progress Status updated on 07.12.2018 | ||
Former | Request for examination was made Status updated on 04.05.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2013/22] | For all designated states ROBERT BOSCH GMBH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
Benner, Andreas 4f No 90, Chien-Kuo N. Road, S 104 Taipei / TW | 02 /
Baumert, Stefan Kolberger Str. 21b 76139 Karlsruhe / DE | 03 /
Pichler, Andreas Speyerer Str. 15 76646 Bruchsal / DE | 04 /
Obert, Mike Albert-Einsteinstr.1 76593 Gernsbach / DE | [2013/22] | Application number, filing date | 12185573.8 | 24.09.2012 | [2013/22] | Priority number, date | DE20111086790 | 22.11.2011 Original published format: DE102011086790 | [2013/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2596999 | Date: | 29.05.2013 | Language: | DE | [2013/22] | Type: | A3 Search report | No.: | EP2596999 | Date: | 25.10.2017 | Language: | DE | [2017/43] | Type: | B1 Patent specification | No.: | EP2596999 | Date: | 15.04.2020 | Language: | DE | [2020/16] | Type: | B8 Corrected title page of specification | No.: | EP2596999 | Date: | 03.06.2020 | [2020/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.09.2017 | Classification | IPC: | B60S1/38 | [2013/22] | CPC: |
B60S1/3881 (EP);
B60S2001/382 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/23] |
Former [2013/22] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Wischblattvorrichtung mit einem zumindest teilweise aus einem Faserverbundwerkstoff gebildeten Federkern | [2013/22] | English: | Wiper blade device with a spring core at least partially formed from a fibre composite material | [2013/22] | French: | Dispositif de balais d'essuie-glace avec un noyau de ressort formé au moins en partie par une matière première composite en fibres | [2013/22] | Examination procedure | 24.09.2012 | Date on which the examining division has become responsible | 25.04.2018 | Examination requested [2018/23] | 15.05.2018 | Amendment by applicant (claims and/or description) | 07.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.05.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 17.05.2019 | Reply to a communication from the examining division | 04.11.2019 | Communication of intention to grant the patent | 03.03.2020 | Fee for grant paid | 03.03.2020 | Fee for publishing/printing paid | 03.03.2020 | Receipt of the translation of the claim(s) | 20.03.2020 | Request for correction of the decision to grant filed | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.12.2018 | Opposition(s) | 18.01.2021 | No opposition filed within time limit [2021/12] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 17.05.2019 | Request for further processing filed | 17.05.2019 | Full payment received (date of receipt of payment) Request granted | 31.05.2019 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 15.05.2018 | Request for further processing filed | 15.05.2018 | Full payment received (date of receipt of payment) Request granted | 04.10.2018 | Decision despatched | Fees paid | Renewal fee | 30.09.2014 | Renewal fee patent year 03 | 30.09.2015 | Renewal fee patent year 04 | 30.09.2016 | Renewal fee patent year 05 | 02.10.2017 | Renewal fee patent year 06 | 01.10.2018 | Renewal fee patent year 07 | 30.09.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.09.2012 | AL | 15.04.2020 | CY | 15.04.2020 | CZ | 15.04.2020 | DK | 15.04.2020 | EE | 15.04.2020 | ES | 15.04.2020 | FI | 15.04.2020 | HR | 15.04.2020 | IT | 15.04.2020 | LT | 15.04.2020 | LV | 15.04.2020 | MC | 15.04.2020 | MK | 15.04.2020 | MT | 15.04.2020 | NL | 15.04.2020 | PL | 15.04.2020 | RO | 15.04.2020 | RS | 15.04.2020 | SE | 15.04.2020 | SI | 15.04.2020 | SK | 15.04.2020 | SM | 15.04.2020 | TR | 15.04.2020 | BG | 15.07.2020 | NO | 15.07.2020 | GR | 16.07.2020 | IS | 15.08.2020 | PT | 17.08.2020 | AT | 24.09.2020 | GB | 24.09.2020 | IE | 24.09.2020 | LU | 24.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | [2022/32] |
Former [2022/27] | HU | 24.09.2012 | |
AL | 15.04.2020 | ||
CY | 15.04.2020 | ||
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
MT | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
TR | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
AT | 24.09.2020 | ||
GB | 24.09.2020 | ||
IE | 24.09.2020 | ||
LU | 24.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2022/26] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
TR | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
AT | 24.09.2020 | ||
GB | 24.09.2020 | ||
IE | 24.09.2020 | ||
LU | 24.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2022/07] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
AT | 24.09.2020 | ||
GB | 24.09.2020 | ||
IE | 24.09.2020 | ||
LU | 24.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/38] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
GB | 24.09.2020 | ||
IE | 24.09.2020 | ||
LU | 24.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/37] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
IE | 24.09.2020 | ||
LU | 24.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/36] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
LU | 24.09.2020 | ||
BE | 30.09.2020 | ||
Former [2021/27] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
LU | 24.09.2020 | ||
Former [2021/23] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 15.04.2020 | |
DK | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 15.04.2020 | |
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 15.04.2020 | |
LT | 15.04.2020 | ||
NL | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 15.04.2020 | |
NO | 15.07.2020 | ||
IS | 15.08.2020 | ||
Former [2020/46] | IS | 15.08.2020 | Documents cited: | Search | [A]DE19813230 (BOSCH GMBH ROBERT [DE]) [A] 1-10 * the whole document *; | [YA]US6026537 (HOJNACKI GEORGE [US]) [Y] 1-4,6-8 * the whole document * [A] 5,9,10; | [A]DE10305323 (BOSCH GMBH ROBERT [DE]) [A] 1-10 * paragraph [0025]; figure - *; | [A]DE212007000044U (SHEN QINGHUAI [CN]) [A] 1-10* paragraphs [0052] - [0054]; figures 13-15 *; | [YA]FR2929904 (VALEO SYSTEMES DESSUYAGE [FR]) [Y] 1-4,6-8 * page 4, line 27 - page 5, line 3 * [A] 5,9,10 |