| EP2579431 - A magnetic shield [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.06.2021 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 26.06.2020 | ||
| Former | Grant of patent is intended Status updated on 22.06.2020 | ||
| Former | Examination is in progress Status updated on 09.06.2020 | ||
| Former | Grant of patent is intended Status updated on 26.05.2020 | ||
| Former | Examination is in progress Status updated on 12.02.2020 | ||
| Former | Request for examination was made Status updated on 15.12.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Rolls-Royce plc Kings Place 90 York Way London N1 9FX / GB | [2020/09] |
| Former [2015/31] | For all designated states Rolls-Royce plc 62 Buckingham Gate London SW1E 6AT / GB | ||
| Former [2013/15] | For all designated states Rolls-Royce plc 65 Buckingham Gate London SW1E 6AT / GB | Inventor(s) | 01 /
Edwards, Huw 27 Kingsmuir Road, Mickleover Derby, Derbyshire DE3 0PY / GB | [2013/15] | Representative(s) | Rolls-Royce plc Moor Lane (ML-9) PO Box 31 Derby DE24 8BJ / GB | [N/P] |
| Former [2020/31] | Rolls-Royce plc Intellectual Property Dept SinA-48 PO Box 31 Derby DE24 8BJ / GB | ||
| Former [2013/15] | Hartley, Andrew Colin, et al Rolls-Royce plc SinB-38, P.O. Box 31 Derby DE24 8BJ / GB | Application number, filing date | 12185885.6 | 25.09.2012 | [2013/15] | Priority number, date | GB20110016948 | 03.10.2011 Original published format: GB 201116948 | [2013/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2579431 | Date: | 10.04.2013 | Language: | EN | [2013/15] | Type: | A3 Search report | No.: | EP2579431 | Date: | 14.06.2017 | Language: | EN | [2017/24] | Type: | B1 Patent specification | No.: | EP2579431 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.05.2017 | Classification | IPC: | H02K11/00, H02K55/00 | [2013/15] | CPC: |
H02K11/0141 (EP,US);
H02K55/00 (EP,US);
Y02E40/60 (EP,US);
Y10T29/49014 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/03] |
| Former [2013/15] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Magnetabschirmung | [2013/15] | English: | A magnetic shield | [2013/15] | French: | Blindage magnétique | [2013/15] | Examination procedure | 25.09.2012 | Date on which the examining division has become responsible | 06.12.2017 | Amendment by applicant (claims and/or description) | 06.12.2017 | Examination requested [2018/03] | 17.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 18.03.2020 | Reply to a communication from the examining division | 27.05.2020 | Communication of intention to grant the patent | 09.06.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 09.06.2020 | Fee for grant paid | 09.06.2020 | Fee for publishing/printing paid | 22.06.2020 | Information about intention to grant a patent | 22.06.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.02.2020 | Opposition(s) | 30.04.2021 | No opposition filed within time limit [2021/27] | Fees paid | Renewal fee | 29.09.2014 | Renewal fee patent year 03 | 28.09.2015 | Renewal fee patent year 04 | 27.09.2016 | Renewal fee patent year 05 | 27.09.2017 | Renewal fee patent year 06 | 27.09.2018 | Renewal fee patent year 07 | 27.09.2019 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.09.2012 | AL | 29.07.2020 | AT | 29.07.2020 | CY | 29.07.2020 | CZ | 29.07.2020 | DK | 29.07.2020 | EE | 29.07.2020 | ES | 29.07.2020 | FI | 29.07.2020 | HR | 29.07.2020 | IT | 29.07.2020 | LT | 29.07.2020 | LV | 29.07.2020 | MC | 29.07.2020 | MK | 29.07.2020 | MT | 29.07.2020 | NL | 29.07.2020 | PL | 29.07.2020 | RO | 29.07.2020 | RS | 29.07.2020 | SE | 29.07.2020 | SI | 29.07.2020 | SK | 29.07.2020 | SM | 29.07.2020 | TR | 29.07.2020 | IE | 25.09.2020 | LU | 25.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | BG | 29.10.2020 | NO | 29.10.2020 | GR | 30.10.2020 | IS | 29.11.2020 | PT | 30.11.2020 | [2022/32] |
| Former [2022/27] | HU | 25.09.2012 | |
| AL | 29.07.2020 | ||
| AT | 29.07.2020 | ||
| CY | 29.07.2020 | ||
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| MT | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SI | 29.07.2020 | ||
| SK | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| TR | 29.07.2020 | ||
| IE | 25.09.2020 | ||
| LU | 25.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2022/26] | AL | 29.07.2020 | |
| AT | 29.07.2020 | ||
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SI | 29.07.2020 | ||
| SK | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| TR | 29.07.2020 | ||
| IE | 25.09.2020 | ||
| LU | 25.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/37] | AL | 29.07.2020 | |
| AT | 29.07.2020 | ||
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SI | 29.07.2020 | ||
| SK | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| IE | 25.09.2020 | ||
| LU | 25.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/36] | AL | 29.07.2020 | |
| AT | 29.07.2020 | ||
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SI | 29.07.2020 | ||
| SK | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| LU | 25.09.2020 | ||
| BE | 30.09.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/28] | AL | 29.07.2020 | |
| AT | 29.07.2020 | ||
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SK | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| LU | 25.09.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/27] | AL | 29.07.2020 | |
| AT | 29.07.2020 | ||
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| LU | 25.09.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/25] | AL | 29.07.2020 | |
| AT | 29.07.2020 | ||
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/23] | AT | 29.07.2020 | |
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| MC | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| SM | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/22] | AT | 29.07.2020 | |
| CZ | 29.07.2020 | ||
| DK | 29.07.2020 | ||
| EE | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RO | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/20] | AT | 29.07.2020 | |
| DK | 29.07.2020 | ||
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| IT | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/17] | AT | 29.07.2020 | |
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| NL | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/10] | AT | 29.07.2020 | |
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| HR | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| LV | 29.07.2020 | ||
| PL | 29.07.2020 | ||
| RS | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| IS | 29.11.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/09] | AT | 29.07.2020 | |
| ES | 29.07.2020 | ||
| FI | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| GR | 30.10.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/08] | ES | 29.07.2020 | |
| FI | 29.07.2020 | ||
| LT | 29.07.2020 | ||
| SE | 29.07.2020 | ||
| BG | 29.10.2020 | ||
| NO | 29.10.2020 | ||
| PT | 30.11.2020 | ||
| Former [2021/07] | FI | 29.07.2020 | |
| LT | 29.07.2020 | ||
| NO | 29.10.2020 | Documents cited: | Search | [XI] US4174483 (FILIPPOV IOSIF F et al.) [X] 1,3,6,8,10,13 * figures 1,2,3 * * column 1, lines 43-63 * * column 3, line 22 - column 4, line 15 * * claim 1 *[I] 11 | [XY] US4968961 (MIYAJIMA GOH et al.) [X] 1,4,12 * abstract * * figures 2,4 * * column 5, lines 6-23 * * claim 1 *[Y] 9 | [IY] EP0503085 (FURUKAWA ELECTRIC CO LTD et al.) [I] 1,2,5,7,14 * abstract * * figure 1 * * column 1, lines 3-18 * * page 3, lines 11-40 * * page 4, lines 24-27 * * page 7, lines 23-32 *[Y] 9 | [I] JPH04188893 (MATSUSHITA ELECTRIC INDUSTRIAL CO LTD et al.) [I] 1 * abstract * | [A] US4920011 (OGAWA SOUICHI et al.) [A] 1 * abstract * * figures 2,3 * * column 2, line 54 - column 3, line 14 * * claim 1 * |