blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2579421

EP2579421 - Wireless power transmitting apparatus and method thereof [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  15.01.2020
FormerExamination is in progress
Status updated on  14.04.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
GE Hybrid Technologies, LLC
1 Research Circle
Niskayuna, New York 12309 / US
[2020/25]
Former [2018/10]For all designated states
GE Hybrid Technologies, LLC
1 Research Circle
Niskayuna, New York 12309 / US
Former [2013/15]For all designated states
Hanrim Postech Co., Ltd
924 Gosaek-dong
Gwonseon-gu
Suwon-si, Gyeonggi-do / KR
Inventor(s)01 / Jung, Chun-Kil
625-7 Yeoksam-dong
Gangnam-gu, Seoul / KR
 [2013/15]
Representative(s)Dennemeyer & Associates S.A.
Postfach 70 04 25
81304 München / DE
[2020/25]
Former [2013/15]Zardi, Marco, et al
M. Zardi & Co. S.A. Via Pioda 6
6900 Lugano / CH
Application number, filing date12187305.304.10.2012
[2013/15]
Priority number, dateKR2011010061704.10.2011         Original published format: KR 20110100617
[2013/15]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2579421
Date:10.04.2013
Language:EN
[2013/15]
Type: A3 Search report 
No.:EP2579421
Date:05.06.2013
Language:EN
[2013/23]
Type: B1 Patent specification 
No.:EP2579421
Date:17.06.2020
Language:EN
[2020/25]
Search report(s)(Supplementary) European search report - dispatched on:EP07.05.2013
ClassificationIPC:H02J7/00, H02J7/02, H02J50/12, H02J50/40, H02J50/80, H02J50/90
[2020/03]
CPC:
H02J7/0013 (EP,KR,US); H02J50/40 (KR); H02J50/10 (EP,US);
H02J50/12 (KR,US); H02J50/402 (EP,US); H02J50/80 (EP,KR,US);
H02J50/90 (EP,KR,US); H02J7/00034 (EP,KR,US); H02J7/00036 (EP,KR,US);
H02J7/0047 (KR); H02J7/0048 (EP,US); H02J7/0049 (EP,KR,US);
H04B5/79 (KR); H02J2310/22 (KR); H02J7/00047 (EP,US);
Y02B40/00 (KR,US) (-)
Former IPC [2013/15]H02J7/00, H02J7/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/25]
Former [2013/15]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Drahtlose Leistungsübertragungsvorrichtung und Verfahren davon[2013/15]
English:Wireless power transmitting apparatus and method thereof[2013/15]
French:Appareil de transmission de puissance sans fil et procédé associé[2013/15]
Examination procedure03.12.2013Amendment by applicant (claims and/or description)
03.12.2013Examination requested  [2014/03]
13.04.2017Despatch of a communication from the examining division (Time limit: M04)
22.08.2017Reply to a communication from the examining division
06.09.2017Despatch of a communication from the examining division (Time limit: M06)
16.03.2018Reply to a communication from the examining division
16.01.2020Communication of intention to grant the patent
04.05.2020Fee for grant paid
04.05.2020Fee for publishing/printing paid
04.05.2020Receipt of the translation of the claim(s)
Divisional application(s)EP20179942.6  / EP3758187
EP22167627.3
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.04.2017
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
23.10.2014Renewal fee patent year 03
26.10.2015Renewal fee patent year 04
25.10.2016Renewal fee patent year 05
23.10.2017Renewal fee patent year 06
31.10.2018Renewal fee patent year 07
21.10.2019Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.10.2012
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IE04.10.2020
LU04.10.2020
IS17.10.2020
PT19.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
[2022/32]
Former [2022/27]HU04.10.2012
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IE04.10.2020
LU04.10.2020
IS17.10.2020
PT19.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2022/26]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IE04.10.2020
LU04.10.2020
IS17.10.2020
PT19.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/46]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IE04.10.2020
LU04.10.2020
IS17.10.2020
PT19.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/37]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
LU04.10.2020
IS17.10.2020
PT19.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/36]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
LU04.10.2020
IS17.10.2020
PT19.10.2020
BE31.10.2020
Former [2021/31]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
LU04.10.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/20]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Documents cited:Search[Y]US2004145342  (LYON GEOFF M [US]) [Y] 2,3* paragraphs [0020] - [0025]; figure 2; claim 4 *;
 [Y]WO2009038789  (WANG KEVIN PEICHIH [US]) [Y] 4,5,8-10 * page 10 - page 16; figures 1-3,5 *;
 [Y]US2010253281  (LI PENG [US]) [Y] 1,4-10 * paragraph [0057] - paragraph [0076]; figures 7-10; claims 1-25 *;
 [Y]US2011140538  (JUNG CHUN-KIL [KR], et al) [Y] 1-3,6,7 * figure 1 *
by applicantJP2009273327
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.