blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2545795

EP2545795 - Method of forming adaptive insulation [Right-click to bookmark this link]
Former [2013/03]Insulative material and associated method of forming same
[2014/49]
StatusNo opposition filed within time limit
Status updated on  05.12.2019
Database last updated on 20.11.2024
FormerThe patent has been granted
Status updated on  21.12.2018
FormerGrant of patent is intended
Status updated on  05.07.2018
FormerExamination is in progress
Status updated on  09.11.2016
Most recent event   Tooltip23.07.2021Lapse of the patent in a contracting state
New state(s): MT
published on 25.08.2021  [2021/34]
Applicant(s)For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-1596 / US
[2019/04]
Former [2013/03]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
Inventor(s)01 / Laib, Trever M.
14520 NE 174th St.
Woodinville Washington, 98072 / US
02 / Fletcher III, Henry V.
1714 Gibson Road
Everett Washington, 98204 / US
03 / Mitchell, Bradley J.
9601 Wall Street
Snohomish Washington, 98296 / US
 [2013/03]
Representative(s)Witte, Weller & Partner Patentanwälte mbB
Postfach 10 54 62
70047 Stuttgart / DE
[2019/04]
Former [2013/03]Witte, Weller & Partner
Postfach 10 54 62
70047 Stuttgart / DE
Application number, filing date12188076.928.10.2008
[2013/03]
Priority number, dateUS2008096894003.01.2008         Original published format: US 968940
[2013/03]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2545795
Date:16.01.2013
Language:EN
[2013/03]
Type: A3 Search report 
No.:EP2545795
Date:21.08.2013
Language:EN
[2013/34]
Type: B1 Patent specification 
No.:EP2545795
Date:23.01.2019
Language:EN
[2019/04]
Search report(s)(Supplementary) European search report - dispatched on:EP22.07.2013
ClassificationIPC:A41D13/005, A41D31/00, D04H1/00
[2013/34]
CPC:
A41D13/005 (EP,US); A41D31/065 (EP,US); D04H1/00 (US);
D04H1/43918 (EP); D04H1/541 (EP); A41D2400/10 (EP,US);
Y10T156/10 (EP,US); Y10T428/24025 (EP,US); Y10T428/24132 (EP,US);
Y10T428/24322 (EP,US); Y10T428/24752 (EP,US); Y10T428/24942 (EP,US);
Y10T428/249924 (EP,US); Y10T428/249941 (EP,US); Y10T428/249947 (EP,US);
Y10T428/249949 (EP,US); Y10T428/24995 (EP,US); Y10T428/2915 (EP,US);
Y10T428/2929 (EP,US); Y10T428/2973 (EP,US); Y10T428/2976 (EP,US) (-)
Former IPC [2013/03]A41D13/005, A41D31/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2019/04]
Former [2013/03]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren zu Herstellung einer adaptiven Isolierung[2014/49]
English:Method of forming adaptive insulation[2014/49]
French:Procédé de formation d'une isolation adaptative[2016/30]
Former [2013/03]Isolierendes Material und zugehöriges Verfahren zu Herstellung
Former [2013/03]Insulative material and associated method of forming same
Former [2013/03]Matériau isolant et procédé associé de formation de celui-ci
Examination procedure27.01.2014Amendment by applicant (claims and/or description)
27.01.2014Examination requested  [2014/11]
24.03.2014Despatch of a communication from the examining division (Time limit: M04)
30.07.2014Reply to a communication from the examining division
10.12.2014Communication of intention to grant the patent
01.04.2015Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
18.05.2015Despatch of a communication from the examining division (Time limit: M04)
31.08.2015Reply to a communication from the examining division
02.11.2015Despatch of a communication from the examining division (Time limit: M04)
01.03.2016Reply to a communication from the examining division
05.07.2016Communication of intention to grant the patent
04.11.2016Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
08.12.2016Despatch of a communication from the examining division (Time limit: M04)
24.02.2017Reply to a communication from the examining division
15.03.2017Despatch of communication that the application is refused, reason: substantive examination {1}
09.08.2018Communication of intention to grant the patent
14.12.2018Fee for grant paid
14.12.2018Fee for publishing/printing paid
14.12.2018Receipt of the translation of the claim(s)
Appeal following examination18.05.2017Appeal received No.  T1922/17
19.07.2017Statement of grounds filed
27.02.2018Result of appeal procedure: continuation of examination procedure
Parent application(s)   TooltipEP08867389.2  / EP2237690
Opposition(s)24.10.2019No opposition filed within time limit [2020/01]
Fees paidRenewal fee
11.10.2012Renewal fee patent year 03
11.10.2012Renewal fee patent year 04
11.10.2012Renewal fee patent year 05
28.10.2013Renewal fee patent year 06
27.10.2014Renewal fee patent year 07
27.10.2015Renewal fee patent year 08
27.10.2016Renewal fee patent year 09
27.10.2017Renewal fee patent year 10
29.10.2018Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.10.2008
AT23.01.2019
CY23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
MT23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
[2021/34]
Former [2021/32]HU28.10.2008
AT23.01.2019
CY23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2021/26]AT23.01.2019
CY23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2020/29]AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2020/17]AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2020/13]AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2020/03]AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SK23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/49]CZ23.01.2019
DK23.01.2019
EE23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SK23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/48]DK23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/39]FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/38]FI23.01.2019
LT23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
PT23.05.2019
Former [2019/37]FI23.01.2019
LT23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
NO23.04.2019
GR24.04.2019
PT23.05.2019
Former [2019/35]FI23.01.2019
LT23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
NO23.04.2019
PT23.05.2019
Former [2019/34]FI23.01.2019
LT23.01.2019
NL23.01.2019
SE23.01.2019
NO23.04.2019
PT23.05.2019
Former [2019/33]FI23.01.2019
LT23.01.2019
NL23.01.2019
NO23.04.2019
PT23.05.2019
Former [2019/30]NL23.01.2019
Documents cited:Search[A]US6767850  (TEBBE GEROLD [MC]) [A] 1* column 4, line 60 - column 6, line 8; figures 1-5 *;
 [X]US2006277950  (ROCK MOSHE [US]) [X] 1-3 * paragraphs [0058] , [0061] , [0070]; figure 6 *;
 [X]US7291389  (BITLER STEVEN P [US], et al) [X] 1-3,7 * column 4, line 45 - column 5, line 29 *;
 [XP]EP1895035  (MMI IPCO LLC [US]) [XP] 1-3,7 * paragraphs [0019] - [0021] - [0027] , [0032]; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.