EP2605628 - Information processing system, operation management method of information processing system, and data center [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.04.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.04.2020 | ||
Former | Grant of patent is intended Status updated on 05.12.2019 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Hitachi, Ltd. 6-6, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8280 / JP | [2020/22] |
Former [2013/41] | For all designated states Hitachi, Ltd. 6-6, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8280 / JP | ||
Former [2013/25] | For all designated states Hitachi, Ltd. 6-6, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8220 / JP | Inventor(s) | 01 /
Okitsu, Jun c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku Tokyo, 100-8220 / JP | 02 /
Mase, Masayoshi c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku Tokyo, 100-8220 / JP | 03 /
Nojiri, Tohru c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku Tokyo, 100-8220 / JP | 04 /
Saito, Tatsuya c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku Tokyo, 100-8220 / JP | [2013/25] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2020/22] |
Former [2013/25] | MERH-IP Matias Erny Reichl Hoffmann Paul-Heyse-Strasse 29 80336 München / DE | Application number, filing date | 12196873.9 | 13.12.2012 | [2013/25] | Priority number, date | JP20110274014 | 15.12.2011 Original published format: JP 2011274014 | [2013/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2605628 | Date: | 19.06.2013 | Language: | EN | [2013/25] | Type: | A3 Search report | No.: | EP2605628 | Date: | 27.12.2017 | Language: | EN | [2017/52] | Type: | B1 Patent specification | No.: | EP2605628 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.11.2017 | Classification | IPC: | H05K7/20, G06F1/20 | [2017/52] | CPC: |
H05K7/20836 (EP,US);
G06F1/206 (US)
|
Former IPC [2013/25] | H05K7/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/25] | Title | German: | Informationsverarbeitungssystem, Betriebsverwaltungsverfahren des Informationsverarbeitungssystems und Datenzentrum | [2013/25] | English: | Information processing system, operation management method of information processing system, and data center | [2013/25] | French: | Système de traitement d'informations, procédé de gestion d'opération de système de traitement d'informations et centre de données | [2013/25] | Examination procedure | 22.03.2013 | Examination requested [2013/25] | 27.06.2018 | Amendment by applicant (claims and/or description) | 06.12.2019 | Communication of intention to grant the patent | 16.04.2020 | Fee for grant paid | 16.04.2020 | Fee for publishing/printing paid | 16.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.12.2019 | Opposition(s) | 02.03.2021 | No opposition filed within time limit [2021/18] | Fees paid | Renewal fee | 05.01.2015 | Renewal fee patent year 03 | 04.01.2016 | Renewal fee patent year 04 | 02.01.2017 | Renewal fee patent year 05 | 02.01.2018 | Renewal fee patent year 06 | 02.01.2019 | Renewal fee patent year 07 | 02.01.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.12.2012 | AL | 27.05.2020 | AT | 27.05.2020 | CY | 27.05.2020 | CZ | 27.05.2020 | DK | 27.05.2020 | EE | 27.05.2020 | ES | 27.05.2020 | FI | 27.05.2020 | HR | 27.05.2020 | IT | 27.05.2020 | LT | 27.05.2020 | LV | 27.05.2020 | MC | 27.05.2020 | MK | 27.05.2020 | MT | 27.05.2020 | PL | 27.05.2020 | RO | 27.05.2020 | RS | 27.05.2020 | SE | 27.05.2020 | SI | 27.05.2020 | SK | 27.05.2020 | SM | 27.05.2020 | TR | 27.05.2020 | BG | 27.08.2020 | NO | 27.08.2020 | GR | 28.08.2020 | IS | 27.09.2020 | PT | 28.09.2020 | IE | 13.12.2020 | LU | 13.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/33] |
Former [2022/32] | HU | 13.12.2012 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
MK | 27.05.2020 | ||
MT | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
TR | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
IE | 13.12.2020 | ||
LU | 13.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/27] | HU | 13.12.2012 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
MT | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
TR | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
IE | 13.12.2020 | ||
LU | 13.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/26] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
TR | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
IE | 13.12.2020 | ||
LU | 13.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
IE | 13.12.2020 | ||
LU | 13.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/47] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
IE | 13.12.2020 | ||
LU | 13.12.2020 | ||
Former [2021/46] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
IE | 13.12.2020 | ||
Former [2021/40] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/24] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/10] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/09] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/08] | AL | 27.05.2020 | |
DK | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/04] | AL | 27.05.2020 | |
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/01] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/51] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/50] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/48] | FI | 27.05.2020 | |
LT | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/47] | LT | 27.05.2020 | |
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
Former [2020/46] | IS | 27.09.2020 | Documents cited: | Search | [A]US2006259621 (RANGANATHAN PARTHASARATHY [US], et al) [A] 1-13 * paragraph [0031] - paragraph [0032]; figure 2A *; | [A]US2010298997 (OHBA YUJI [JP], et al) [A] 1-13 * paragraph [0009] * * paragraph [0062]; figure 7 *; | [XI]GB2471368 (FUJITSU LTD [JP]) [X] 1-7,12,13 * paragraph [0017] - paragraph [0022]; figure 1 * [I] 8-11; | [A]EP2369249 (FUJITSU LTD [JP]) [A] 1-13* paragraph [0053] - paragraph [0054]; figure 8 * | by applicant | JP2011007423 |