EP2631543 - Combustor and method for purging a combustor [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.09.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 01.10.2021 | ||
Former | Grant of patent is intended Status updated on 09.06.2021 | ||
Former | Examination is in progress Status updated on 12.05.2020 | ||
Former | Request for examination was made Status updated on 20.04.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2021/44] |
Former [2013/35] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
Bery, Jonathan Dwight 300 Garlington Road Greenville, SC 29615 / US | 02 /
Hughes, Michael John 300 Garlington Road Greenville, SC 29615 / US | [2013/35] | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater Königstraße 28 70173 Stuttgart / DE | [2021/44] |
Former [2013/35] | Cleary, Fidelma GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 12196996.8 | 13.12.2012 | [2013/35] | Priority number, date | US201213405564 | 27.02.2012 Original published format: US201213405564 | [2013/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2631543 | Date: | 28.08.2013 | Language: | EN | [2013/35] | Type: | A3 Search report | No.: | EP2631543 | Date: | 11.10.2017 | Language: | EN | [2017/41] | Type: | B1 Patent specification | No.: | EP2631543 | Date: | 03.11.2021 | Language: | EN | [2021/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.09.2017 | Classification | IPC: | F23R3/10, F23R3/28 | [2013/35] | CPC: |
F23R3/10 (EP,US);
F23R3/286 (EP,US);
F23D2209/30 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/21] |
Former [2013/35] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Brennkammer und Verfahren zur Reinigung einer Brennkammer | [2013/35] | English: | Combustor and method for purging a combustor | [2013/35] | French: | Chambre de combustion et procédé pour purger une chambre de combustion | [2013/35] | Examination procedure | 13.12.2012 | Date on which the examining division has become responsible | 10.04.2018 | Amendment by applicant (claims and/or description) | 11.04.2018 | Examination requested [2018/21] | 15.05.2020 | Despatch of a communication from the examining division (Time limit: M06) | 15.10.2020 | Reply to a communication from the examining division | 10.06.2021 | Communication of intention to grant the patent | 21.09.2021 | Fee for grant paid | 21.09.2021 | Fee for publishing/printing paid | 21.09.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.05.2020 | Opposition(s) | 04.08.2022 | No opposition filed within time limit [2022/41] | Fees paid | Renewal fee | 05.01.2015 | Renewal fee patent year 03 | 04.01.2016 | Renewal fee patent year 04 | 02.01.2017 | Renewal fee patent year 05 | 02.01.2018 | Renewal fee patent year 06 | 02.01.2019 | Renewal fee patent year 07 | 19.12.2019 | Renewal fee patent year 08 | 17.12.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.12.2012 | AL | 03.11.2021 | AT | 03.11.2021 | CY | 03.11.2021 | CZ | 03.11.2021 | DK | 03.11.2021 | EE | 03.11.2021 | ES | 03.11.2021 | FI | 03.11.2021 | HR | 03.11.2021 | IT | 03.11.2021 | LT | 03.11.2021 | LV | 03.11.2021 | MC | 03.11.2021 | MK | 03.11.2021 | NL | 03.11.2021 | PL | 03.11.2021 | RO | 03.11.2021 | RS | 03.11.2021 | SE | 03.11.2021 | SI | 03.11.2021 | SK | 03.11.2021 | SM | 03.11.2021 | IE | 13.12.2021 | LU | 13.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | FR | 03.01.2022 | BG | 03.02.2022 | GB | 03.02.2022 | NO | 03.02.2022 | GR | 04.02.2022 | IS | 03.03.2022 | PT | 03.03.2022 | [2024/22] |
Former [2023/27] | HU | 13.12.2012 | |
AL | 03.11.2021 | ||
AT | 03.11.2021 | ||
CY | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
IT | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
IE | 13.12.2021 | ||
LU | 13.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
FR | 03.01.2022 | ||
BG | 03.02.2022 | ||
GB | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2023/24] | AL | 03.11.2021 | |
AT | 03.11.2021 | ||
CY | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
IE | 13.12.2021 | ||
LU | 13.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
FR | 03.01.2022 | ||
BG | 03.02.2022 | ||
GB | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2023/08] | AL | 03.11.2021 | |
AT | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
IE | 13.12.2021 | ||
LU | 13.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
FR | 03.01.2022 | ||
BG | 03.02.2022 | ||
GB | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2023/03] | AL | 03.11.2021 | |
AT | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
IE | 13.12.2021 | ||
LU | 13.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
FR | 03.01.2022 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2023/01] | AL | 03.11.2021 | |
AT | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
IE | 13.12.2021 | ||
LU | 13.12.2021 | ||
BE | 31.12.2021 | ||
FR | 03.01.2022 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/49] | AL | 03.11.2021 | |
AT | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
IE | 13.12.2021 | ||
LU | 13.12.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/48] | AT | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
IE | 13.12.2021 | ||
LU | 13.12.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/46] | AT | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
LU | 13.12.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/39] | AT | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/35] | AT | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/34] | AT | 03.11.2021 | |
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/33] | AT | 03.11.2021 | |
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/25] | AT | 03.11.2021 | |
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/24] | AT | 03.11.2021 | |
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
BG | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/23] | AT | 03.11.2021 | |
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
BG | 03.02.2022 | ||
PT | 03.03.2022 | ||
Former [2022/22] | AT | 03.11.2021 | |
FI | 03.11.2021 | ||
LT | 03.11.2021 | ||
RS | 03.11.2021 | ||
BG | 03.02.2022 | ||
Former [2022/21] | AT | 03.11.2021 | |
RS | 03.11.2021 | ||
BG | 03.02.2022 | ||
Former [2022/19] | BG | 03.02.2022 | Documents cited: | Search | [X]US2011083439 (ZUO BAIFANG [US], et al) [X] 1-13 * paragraph [0013] - paragraph [0017]; figure 1 *; | [A]US2010236247 (DAVIS JR LEWIS BERKLEY [US], et al) [A] 1-13 * the whole document *; | [A]US5218824 (CEDERWALL PHILIP J [US], et al) [A] 1-13 * the whole document *; | [A]US2010192581 (ZIMINSKY WILLY STEVE [US], et al) [A] 1-13 * the whole document * |