blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2607058

EP2607058 - Rotationally symmetrical structural element in grid construction and method for its production [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  15.06.2018
Database last updated on 24.08.2024
FormerExamination is in progress
Status updated on  02.03.2018
Most recent event   Tooltip15.06.2018Withdrawal of applicationpublished on 18.07.2018  [2018/29]
Applicant(s)For all designated states
Deutsches Zentrum für Luft- und Raumfahrt e.V.
Linder Höhe
51147 Köln / DE
[2013/26]
Inventor(s)01 / Fink, Axel
weinbergstraße 9
86609 Donauwörth / DE
02 / Hühne, Christian
Altenbekener Damm 34
30179 Hannover / DE
03 / Kolesnikov, Boris
Fontanestraße 14
38104 Braunschweig / DE
04 / Niemann, Steffen
Lessingstraße 48
38440 Wolfsburg / DE
 [2013/26]
Representative(s)Ahrens, Gabriele
Patentanwälte Einsel & Kollegen
Jasperallee 1A
38102 Braunschweig / DE
[N/P]
Former [2013/26]Ahrens, Gabriele
Patentanwälte Einsel & Kollegen Jasperallee 1A
38102 Braunschweig / DE
Application number, filing date12197988.419.12.2012
[2013/26]
Priority number, dateDE20111012163920.12.2011         Original published format: DE102011121639
[2013/26]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2607058
Date:26.06.2013
Language:DE
[2013/26]
Search report(s)(Supplementary) European search report - dispatched on:EP18.04.2013
ClassificationIPC:B29C70/22, B29C70/30
[2013/26]
CPC:
B29C70/30 (EP,US); B29C70/205 (EP); B29C70/22 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/26]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Rotationssymmetrisches Strukturelement in Gitterkonstruktion und Verfahren zu dessen Herstellung[2013/26]
English:Rotationally symmetrical structural element in grid construction and method for its production[2013/26]
French:Élément structurel à symétrie de rotation dans la construction de grilles et son procédé de fabrication[2013/26]
Examination procedure17.12.2013Examination requested  [2014/05]
18.12.2013Amendment by applicant (claims and/or description)
01.03.2018Despatch of a communication from the examining division (Time limit: M03)
08.06.2018Application withdrawn by applicant  [2018/29]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.03.2018
Fees paidRenewal fee
05.12.2014Renewal fee patent year 03
07.12.2015Renewal fee patent year 04
08.12.2016Renewal fee patent year 05
08.12.2017Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[AD]US4012549  (SLYSH PAUL) [AD] 1,10* column 2, line 21 - column 3, line 68; figure - *;
 [X]WO2010019948  (SIGMA TEK LLC [US], et al) [X] 1,4,8-10,12,13 * page 10, line 22 - line 31; figures 5a,6a,7,11 *
by applicantUS4012549
 US4052523
 US5200251
 WO0196223
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.