EP2624054 - Information processing apparatus and method for controlling the same [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.08.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 20.09.2019 | ||
Former | Grant of patent is intended Status updated on 21.05.2019 | ||
Former | Examination is in progress Status updated on 16.11.2018 | ||
Former | Request for examination was made Status updated on 20.01.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states CANON KABUSHIKI KAISHA 30-2, Shimomaruko 3-chome Ohta-ku Tokyo 146-8501 / JP | [2013/32] | Inventor(s) | 01 /
Utsumi, Yuichi c/o CANON KABUSHIKI KAISHA 3-30-2, Shimomaruko Ohta-ku, Tokyo / JP | 02 /
Yamasaki, Shozo c/o CANON KABUSHIKI KAISHA 3-30-2, Shimomaruko Ohta-ku, Tokyo / JP | [2013/32] | Representative(s) | Hitching, Peter Matthew, et al Canon Europe Ltd European Patent Department 3 The Square Stockley Park Uxbridge Middlesex UB11 1ET / GB | [2019/43] |
Former [2013/32] | Keane, David Colman Canon Europe Ltd Legal, IP and EPS 3 The Square Stockley Park GB-Uxbridge, Middlesex UB11 1ET / GB | Application number, filing date | 12198436.3 | 20.12.2012 | [2013/32] | Priority number, date | JP20120022838 | 06.02.2012 Original published format: JP 2012022838 | [2013/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2624054 | Date: | 07.08.2013 | Language: | EN | [2013/32] | Type: | A3 Search report | No.: | EP2624054 | Date: | 06.07.2016 | Language: | EN | [2016/27] | Type: | B1 Patent specification | No.: | EP2624054 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.06.2016 | Classification | IPC: | G03G15/00, G05B15/02 | [2016/27] | CPC: |
G03G15/5004 (EP,US);
G06F1/32 (KR);
G05B15/02 (US)
|
Former IPC [2013/32] | G03G15/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/08] |
Former [2013/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Informationsverarbeitungsvorrichtung und Steuerverfahren dafür | [2013/32] | English: | Information processing apparatus and method for controlling the same | [2013/32] | French: | Appareil de traitement d'informations et son procédé de contrôle | [2019/43] |
Former [2013/32] | Appareil de traitement dýinformations et son procédé de contrôle | Examination procedure | 20.12.2012 | Date on which the examining division has become responsible | 16.12.2016 | Amendment by applicant (claims and/or description) | 09.01.2017 | Examination requested [2017/08] | 20.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 17.12.2018 | Reply to a communication from the examining division | 22.05.2019 | Communication of intention to grant the patent | 12.09.2019 | Fee for grant paid | 12.09.2019 | Fee for publishing/printing paid | 12.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.11.2018 | Opposition(s) | 24.07.2020 | No opposition filed within time limit [2020/40] | Fees paid | Renewal fee | 05.01.2015 | Renewal fee patent year 03 | 04.01.2016 | Renewal fee patent year 04 | 02.01.2017 | Renewal fee patent year 05 | 02.01.2018 | Renewal fee patent year 06 | 02.01.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.12.2012 | AL | 23.10.2019 | AT | 23.10.2019 | CY | 23.10.2019 | CZ | 23.10.2019 | DK | 23.10.2019 | EE | 23.10.2019 | ES | 23.10.2019 | FI | 23.10.2019 | HR | 23.10.2019 | IT | 23.10.2019 | LT | 23.10.2019 | LV | 23.10.2019 | MC | 23.10.2019 | MK | 23.10.2019 | MT | 23.10.2019 | NL | 23.10.2019 | PL | 23.10.2019 | RO | 23.10.2019 | RS | 23.10.2019 | SE | 23.10.2019 | SI | 23.10.2019 | SK | 23.10.2019 | SM | 23.10.2019 | TR | 23.10.2019 | IE | 20.12.2019 | LU | 20.12.2019 | FR | 23.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | LI | 31.12.2019 | BG | 23.01.2020 | NO | 23.01.2020 | GR | 24.01.2020 | IS | 23.02.2020 | PT | 24.02.2020 | [2022/31] |
Former [2022/26] | HU | 20.12.2012 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
IE | 20.12.2019 | ||
LU | 20.12.2019 | ||
FR | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/34] | HU | 20.12.2012 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 20.12.2019 | ||
LU | 20.12.2019 | ||
FR | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/32] | HU | 20.12.2012 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 20.12.2019 | ||
LU | 20.12.2019 | ||
FR | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/26] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 20.12.2019 | ||
LU | 20.12.2019 | ||
FR | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/51] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 20.12.2019 | ||
LU | 20.12.2019 | ||
FR | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/49] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 20.12.2019 | ||
LU | 20.12.2019 | ||
FR | 23.12.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/46] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 20.12.2019 | ||
LU | 20.12.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/39] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/38] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/37] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/36] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/35] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/32] | AL | 23.10.2019 | |
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/25] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/24] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/23] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/22] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
NL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/21] | NL | 23.10.2019 | |
NO | 23.01.2020 | ||
Former [2020/20] | NL | 23.10.2019 | Documents cited: | Search | [XI]JPH09128177 (CASIO ELECTRONICS MFG CO, et al) [X] 13-24 * abstract *[I] 1-12; | [XI]JP2002073220 (MATSUSHITA ELECTRIC IND CO LTD) [X] 1,11 * abstract * [I] 2-10,12-24; | [XPI]US2012159212 (TAKATANI TAMOTSU [JP], et al) [XP] 1,11 * paragraph [0093] - paragraph [0135] * [I] 2-10,12-24 | by applicant | JP2008142942 |