EP2610521 - Device with adjustable rigidity for absorbing an impact force and method for sensing an impact force [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.12.2019 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 18.01.2019 | ||
Former | Grant of patent is intended Status updated on 01.08.2018 | ||
Former | Request for examination was made Status updated on 18.05.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states ROBERT BOSCH GMBH Postfach 30 02 20 70442 Stuttgart / DE | [2013/27] | Inventor(s) | 01 /
Holz, Dieter Talstr. 48 71563 Affalterbach / DE | [2013/27] | Application number, filing date | 12199383.6 | 27.12.2012 | [2013/27] | Priority number, date | DE20111089937 | 27.12.2011 Original published format: DE102011089937 | [2013/27] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2610521 | Date: | 03.07.2013 | Language: | DE | [2013/27] | Type: | A3 Search report | No.: | EP2610521 | Date: | 08.11.2017 | Language: | DE | [2017/45] | Type: | B1 Patent specification | No.: | EP2610521 | Date: | 20.02.2019 | Language: | DE | [2019/08] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.10.2017 | Classification | IPC: | F16F7/12, B60R19/34 | [2013/27] | CPC: |
F16F7/125 (EP);
B60R19/34 (EP);
B60R2019/262 (EP);
F16F2230/08 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/25] |
Former [2013/27] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Vorrichtung mit einstellbarer Steifigkeit zum Aufnehmen einer Aufprallkraft und Verfahren zum Erfassen einer Aufprallkraft | [2013/27] | English: | Device with adjustable rigidity for absorbing an impact force and method for sensing an impact force | [2013/27] | French: | Dispositif ayant une raideur réglable pour la réception d'une force de choc et procédé de détection d'une force de choc | [2013/27] | Examination procedure | 27.12.2012 | Date on which the examining division has become responsible | 08.05.2018 | Examination requested [2018/25] | 02.08.2018 | Communication of intention to grant the patent | 19.11.2018 | Fee for grant paid | 19.11.2018 | Fee for publishing/printing paid | 19.11.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.08.2018 | Opposition(s) | 21.11.2019 | No opposition filed within time limit [2020/05] | Fees paid | Renewal fee | 05.01.2015 | Renewal fee patent year 03 | 04.01.2016 | Renewal fee patent year 04 | 02.01.2017 | Renewal fee patent year 05 | 02.01.2018 | Renewal fee patent year 06 | 02.01.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.12.2012 | AL | 20.02.2019 | CY | 20.02.2019 | CZ | 20.02.2019 | DK | 20.02.2019 | EE | 20.02.2019 | ES | 20.02.2019 | FI | 20.02.2019 | HR | 20.02.2019 | IT | 20.02.2019 | LT | 20.02.2019 | LV | 20.02.2019 | MC | 20.02.2019 | MK | 20.02.2019 | MT | 20.02.2019 | NL | 20.02.2019 | PL | 20.02.2019 | RO | 20.02.2019 | RS | 20.02.2019 | SI | 20.02.2019 | SK | 20.02.2019 | SM | 20.02.2019 | TR | 20.02.2019 | BG | 20.05.2019 | NO | 20.05.2019 | GR | 21.05.2019 | IS | 20.06.2019 | PT | 20.06.2019 | [2022/31] |
Former [2021/34] | HU | 27.12.2012 | |
AL | 20.02.2019 | ||
CY | 20.02.2019 | ||
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
MT | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2021/32] | HU | 27.12.2012 | |
AL | 20.02.2019 | ||
CY | 20.02.2019 | ||
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2021/26] | AL | 20.02.2019 | |
CY | 20.02.2019 | ||
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/39] | AL | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/17] | AL | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/13] | AL | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/52] | AL | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/49] | AL | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
RO | 20.02.2019 | ||
RS | 20.02.2019 | ||
SK | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/48] | DK | 20.02.2019 | |
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
RS | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/47] | ES | 20.02.2019 | |
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
RS | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/46] | FI | 20.02.2019 | |
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
RS | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/39] | FI | 20.02.2019 | |
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
RS | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/38] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
NL | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/37] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
NL | 20.02.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/34] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
NL | 20.02.2019 | ||
NO | 20.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/33] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
NO | 20.05.2019 | ||
PT | 20.06.2019 | Documents cited: | Search | [A]DE102009044966 (BOSCH GMBH ROBERT [DE]) [A] 1-10 * the whole document *; | [A]DE102010001990 (BOSCH GMBH ROBERT [DE]) [A] 1-10 * the whole document *; | [AP]DE102011005045 (BOSCH GMBH ROBERT [DE]) [AP] 1-10* the whole document * | by applicant | EP1792786 |