blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2554653

EP2554653 - Method and system for transferring and mixing a biomass slurry in a hydrolyser and in a fermenter. [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.03.2021
Database last updated on 02.07.2024
FormerThe patent has been granted
Status updated on  03.04.2020
FormerGrant of patent is intended
Status updated on  04.12.2019
FormerExamination is in progress
Status updated on  21.06.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Instytut Chemii i Techniki Jadrowej
Dorodna 16
03-195 Warszawa / PL
[2020/01]
Former [2013/06]For all designated states
Instytut Chemii i Techniki Jadrowej
ul. Dorodna 16
03-195 Warszawa / PL
Inventor(s)01 / Krylowicz, Adam
Wspólna 4/9
22-400 Zamosc / PL
02 / Usidus, Janusz
Radziecka 13/7
22-400 Zamosc / PL
03 / Chrzanowski, Kazimierz
Polna 20/1
22-400 Zamosc / PL
04 / Chmielewski, Andrzej
Zbojnogorska 11
04-802 Warszawa / PL
 [2020/08]
Former [2013/06]01 / Krylowicz, Adam
Wspólna 4/9
22-400 Zamosc / PL
02 / Usidus, Janusz
Radziecka 13/7
22-400 Zaamosc / PL
03 / Chrzanowski, Kazimierz
Polna 20/1
22-400 Zamosc / PL
04 / Chielewski, Andrzej
Bojhogorska 11
04-802 Warszawa / PL
Representative(s)Belz, Anna, et al
ul. Pólnocna 6/24
20-064 Lublin / PL
[2020/19]
Former [2013/21]Belz, Anna, et al
Law & Patent Office Anna Belz
Ul. Biernackiego 12/18
20-089 Lublin / PL
Former [2013/18]Belz, Anna
Kancelaria Prawno-Patentowa
Ul. Biernackiego 12/18
20-089 Lublin / PL
Former [2013/06]Belz, Anna
ul. Sekutowicza 19/2
20-152 Lublin / PL
Application number, filing date12461532.928.07.2012
[2013/06]
Priority number, datePL2011039586004.08.2011         Original published format: PL 39586011
[2013/06]
Filing languagePL
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2554653
Date:06.02.2013
Language:EN
[2013/06]
Type: B1 Patent specification 
No.:EP2554653
Date:06.05.2020
Language:EN
[2020/19]
Search report(s)(Supplementary) European search report - dispatched on:EP07.11.2012
ClassificationIPC:C12M1/107
[2013/06]
CPC:
C12M21/04 (EP); C12M29/06 (EP); C12M29/18 (EP);
C12M45/02 (EP); C12M45/06 (EP); Y02E50/30 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/19]
Former [2013/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren und System zum Übertragen und Mischen eines Biomasseschlamms in einem Hydrolyser und in einem Fermenter[2013/06]
English:Method and system for transferring and mixing a biomass slurry in a hydrolyser and in a fermenter.[2013/06]
French:Procédé et système de transfert et de mélange d'une suspension de biomasse dans un appareil à hydrolyse et fermentation[2013/06]
Examination procedure06.08.2013Amendment by applicant (claims and/or description)
06.08.2013Examination requested  [2013/37]
12.09.2013Despatch of communication that the application is deemed to be withdrawn, reason: designation fee not paid in time
26.06.2019Despatch of a communication from the examining division (Time limit: M04)
18.10.2019Reply to a communication from the examining division
05.12.2019Communication of intention to grant the patent
02.03.2020Fee for grant paid
02.03.2020Fee for publishing/printing paid
25.03.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  26.06.2019
Opposition(s)09.02.2021No opposition filed within time limit [2021/15]
Request for further processing for:The application is deemed to be withdrawn due to non-payment of designation fees
TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL
15.10.2013Request for further processing filed
15.10.2013Full payment received (date of receipt of payment)
Request granted
04.11.2013Decision despatched
Fees paidRenewal fee
27.06.2014Renewal fee patent year 03
21.07.2015Renewal fee patent year 04
21.09.2016Renewal fee patent year 05
19.07.2017Renewal fee patent year 06
06.07.2018Renewal fee patent year 07
09.07.2019Renewal fee patent year 08
Penalty fee
Additional fee for renewal fee
31.07.201605   M06   Fee paid on   21.09.2016
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.07.2012
AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
MT06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
TR06.05.2020
IE28.07.2020
LU28.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
[2022/32]
Former [2022/27]HU28.07.2012
AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MT06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
TR06.05.2020
IE28.07.2020
LU28.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2022/26]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
TR06.05.2020
IE28.07.2020
LU28.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/37]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
IE28.07.2020
LU28.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/24]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
LU28.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/20]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SK06.05.2020
SM06.05.2020
LU28.07.2020
CH31.07.2020
LI31.07.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/13]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/10]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/09]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/08]AL06.05.2020
DK06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/04]AL06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/01]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/51]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/50]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/48]FI06.05.2020
LT06.05.2020
SE06.05.2020
NO06.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/47]LT06.05.2020
NO06.08.2020
IS06.09.2020
Former [2020/46]IS06.09.2020
Documents cited:Search[Y]DE3105081  (PROBST & CLASS GMBH & CO KG [DE]) [Y] 8-16 * figure 1; claims 1-7 *;
 [A]GB2204056  (HENRIKSON STIG ARVID) [A] 1* abstract *;
 [Y]US5773526  (VAN DIJK MEINE [NL], et al) [Y] 8-16 * column 3, line 9 - column 4, line 12; figure 1 *;
 [Y]US2003059927  (CUMMINGS ROBERT J [US]) [Y] 8-16 * paragraph [0034] - paragraph [0042] * * pages 1,2 *;
 [IY]EP1972691  (MINERALIT GMBH [DE]) [I] 1-7 * paragraph [0031] * * paragraph [0033] - paragraph [0039] * * paragraph [0041] * * paragraph [0059] - paragraph [0065] * * figures 1,3 * [Y] 8-16
by applicantPL197595
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.