blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2686360

EP2686360 - POLYURETHANE COATING MATERIAL COMPOSITION, MULTISTAGE COATING METHODS USING THESE COATING MATERIAL COMPOSITIONS, AND ALSO THE USE OF THE COATING MATERIAL COMPOSITION AS CLEARCOAT MATERIAL AND PIGMENTED COATING MATERIAL, AND APPLICATION OF THE COATING METHOD FOR AUTOMOTIVE REFINISH AND/OR FOR THE COATING OF PLASTICS SUBSTRATES AND/OR OF UTILITY VEHICLES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.08.2017
Database last updated on 19.10.2024
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
BASF Coatings GmbH
Glasuritstrasse 1
48165 Münster / DE
[2016/41]
Former [2014/04]For all designated states
BASF Coatings GmbH
Glasuritstrasse 1
48165 Münster / DE
Inventor(s)01 / WESTHOFF, Elke
Lindesay-Str.8
48565 Steinfurt / DE
02 / HOFFMANN, Peter
Erlengrund 215
48308 Senden / DE
03 / MÖLLER, Bernadette
Zur Wassermühle 1
48734 Maria-Veen / DE
04 / SCHNIER, Benedikt
Storkskamp 4
48291 Telgte / DE
 [2014/04]
Representative(s)(deleted)
[N/P]
Former [2016/41]Leifert & Steffan
Patentanwälte Burgplatz 21-22
40213 Düsseldorf / DE
Application number, filing date12702024.631.01.2012
[2016/41]
WO2012EP51574
Priority number, dateUS201161452175P14.03.2011         Original published format: US 201161452175 P
EP2011015800114.03.2011         Original published format: EP 11158001
[2014/04]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2012123166
Date:20.09.2012
Language:DE
[2012/38]
Type: A1 Application with search report 
No.:EP2686360
Date:22.01.2014
Language:DE
The application published by WIPO in one of the EPO official languages on 20.09.2012 takes the place of the publication of the European patent application.
[2014/04]
Type: B1 Patent specification 
No.:EP2686360
Date:12.10.2016
Language:DE
[2016/41]
Search report(s)International search report - published on:EP20.09.2012
ClassificationIPC:C08G18/16, C08G18/22, C09D175/00, C09D175/04
[2014/04]
CPC:
C08G18/222 (EP,US); C09D175/00 (EP,KR,US); C08G18/16 (EP,KR,US);
C08G18/22 (KR); C09D175/04 (EP,KR,US); C09D175/06 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/04]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:POLYURETHAN-BESCHICHTUNGSMITTELZUSAMMENSETZUNG, MEHRSTUFIGE BESCHICHTUNGSVERFAHREN UNTER VERWENDUNG DIESER BESCHICHTUNGSMITTELZUSAMMENSETZUNGEN SOWIE DIE VERWENDUNG DER BESCHICHTUNGSMITTELZUSAMMENSETZUNG ALS KLARLACK UND PIGMENTIERTER LACK BZW. ANWENDUNG DES BESCHICHTUNGSVERFAHRENS FÜR DIE AUTOMOBILREPARATURLACKIERUNG UND/ODER FÜR DIE BESCHICHTUNG VON KUNSTSTOFFSUBSTRATEN UND/ODER NUTZFAHRZEUGEN[2014/04]
English:POLYURETHANE COATING MATERIAL COMPOSITION, MULTISTAGE COATING METHODS USING THESE COATING MATERIAL COMPOSITIONS, AND ALSO THE USE OF THE COATING MATERIAL COMPOSITION AS CLEARCOAT MATERIAL AND PIGMENTED COATING MATERIAL, AND APPLICATION OF THE COATING METHOD FOR AUTOMOTIVE REFINISH AND/OR FOR THE COATING OF PLASTICS SUBSTRATES AND/OR OF UTILITY VEHICLES[2014/04]
French:COMPOSITIONS DE REVÊTEMENT À BASE DE POLYURÉTHANNE, PROCÉDÉ DE REVÊTEMENT EN PLUSIEURS ÉTAPES REPOSANT SUR L'UTILISATION DESDITES COMPOSITIONS, UTILISATION DE CES COMPOSITIONS DE REVÊTEMENT EN TANT QUE VERNIS TRANSPARENT ET PEINTURE PIGMENTÉE, ET UTILISATION DUDIT PROCÉDÉ DE REVÊTEMENT POUR LA PEINTURE DANS LA RÉPARATION AUTOMOBILE ET/OU POUR L'APPLICATION D'UN REVÊTEMENT SUR DES SUBSTRATS EN PLASTIQUE ET/OU DES VÉHICULES UTILITAIRES[2014/04]
Entry into regional phase14.10.2013National basic fee paid 
14.10.2013Designation fee(s) paid 
14.10.2013Examination fee paid 
Examination procedure14.10.2013Examination requested  [2014/04]
17.12.2013Amendment by applicant (claims and/or description)
13.11.2014Despatch of a communication from the examining division (Time limit: M04)
30.01.2015Reply to a communication from the examining division
04.05.2016Communication of intention to grant the patent
01.09.2016Fee for grant paid
01.09.2016Fee for publishing/printing paid
01.09.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.11.2014
Opposition(s)13.07.2017No opposition filed within time limit [2017/38]
Fees paidRenewal fee
31.01.2014Renewal fee patent year 03
02.02.2015Renewal fee patent year 04
01.02.2016Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.01.2012
AL12.10.2016
CY12.10.2016
CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
MK12.10.2016
MT12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
TR12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
AT31.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
[2020/34]
Former [2020/15]HU31.01.2012
CY12.10.2016
CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
MK12.10.2016
MT12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
TR12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
AT31.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2019/51]HU31.01.2012
CY12.10.2016
CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
MK12.10.2016
MT12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
AT31.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2019/46]HU31.01.2012
CY12.10.2016
CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
MT12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
AT31.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2019/31]HU31.01.2012
CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
MT12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
AT31.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2018/43]CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
MT12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
AT31.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2018/24]CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
AT31.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2018/13]CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
BE31.01.2017
CH31.01.2017
IE31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/51]CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SI12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
BE31.01.2017
CH31.01.2017
LI31.01.2017
LU31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/42]CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
MC12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
BE31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/38]CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SK12.10.2016
SM12.10.2016
BG12.01.2017
NO12.01.2017
GR13.01.2017
BE31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/36]CZ12.10.2016
DK12.10.2016
EE12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
NL12.10.2016
RO12.10.2016
RS12.10.2016
SE12.10.2016
SK12.10.2016
NO12.01.2017
GR13.01.2017
BE31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/34]CZ12.10.2016
DK12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
NL12.10.2016
RS12.10.2016
SE12.10.2016
NO12.01.2017
GR13.01.2017
BE31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/33]DK12.10.2016
FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
NL12.10.2016
RS12.10.2016
SE12.10.2016
NO12.01.2017
GR13.01.2017
BE31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/26]FI12.10.2016
HR12.10.2016
LT12.10.2016
LV12.10.2016
NL12.10.2016
RS12.10.2016
SE12.10.2016
NO12.01.2017
GR13.01.2017
BE31.01.2017
IS12.02.2017
PT13.02.2017
Former [2017/12]LV12.10.2016
Cited inInternational search[I]US2006247341  (HSIEH BING [US], et al) [I] 1-17 * paragraphs [0002] , [0130]; examples 17,19-24 *;
 [A]DE102008026341  (BAYER MATERIALSCIENCE AG [DE]) [A] 1-17 * examples 1n,9 *;
 [A]US3795636  (HUFFMAN G, et al) [A] 1-17 * example 3; table III *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.