blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2673683

EP2673683 - SYSTEM AND METHOD FOR A MODULAR FLUID HANDLING SYSTEM WITH MODES IN A MODULAR DATA CENTER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.10.2018
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  27.10.2017
FormerGrant of patent is intended
Status updated on  15.06.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL, IS
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Dell Products L.P.
One Dell Way
Round Rock, TX 78682-2244 / US
[2017/28]
Former [2013/51]For all designated states
Dell Products, L.P.
One Dell Way
Round Rock, TX 78682-2244 / US
Inventor(s)01 / SCHMITT, Ty
2414 Donner Path
Round Rock, Texas 78681 / US
02 / BAILEY, Mark M.
1350 Rocky Hollow Drive
Burnet, Texas 78611 / US
03 / DUNCAN, Taylor
8601 Ripon Cove
Austin, Texas 78717-5425 / US
 [2013/51]
Representative(s)Wegner, Hans
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2017/48]
Former [2013/51]Wegner, Hans
Bardehle Pagenberg Partnerschaft
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
Application number, filing date12704352.907.02.2012
[2017/48]
WO2012US24100
Priority number, dateUS20111302201807.02.2011         Original published format: US201113022018
US20111303345123.02.2011         Original published format: US201113033451
[2013/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012109209
Date:16.08.2012
Language:EN
[2012/33]
Type: A1 Application with search report 
No.:EP2673683
Date:18.12.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 16.08.2012 takes the place of the publication of the European patent application.
[2013/51]
Type: B1 Patent specification 
No.:EP2673683
Date:29.11.2017
Language:EN
[2017/48]
Search report(s)International search report - published on:EP16.08.2012
ClassificationIPC:G06F1/20, H05K7/14, H05K7/20
[2017/25]
CPC:
H05K7/1497 (EP); G06F1/20 (EP); H05K7/20745 (EP);
G06F2200/201 (EP)
Former IPC [2013/51]G06F1/20, H05K7/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/51]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM UND VERFAHREN FÜR EIN MODULARES FLÜSSIGKEITSBEHANDLUNGSSYSTEM MIT MODI IN EINEM MODULAREN DATENZENTRUM[2013/51]
English:SYSTEM AND METHOD FOR A MODULAR FLUID HANDLING SYSTEM WITH MODES IN A MODULAR DATA CENTER[2013/51]
French:SYSTÈME ET PROCÉDÉ POUR SYSTÈME DE GESTION DE FLUIDE MODULAIRE AVEC MODES DANS UN CENTRE DE DONNÉES MODULAIRE[2013/51]
Entry into regional phase19.08.2013National basic fee paid 
19.08.2013Designation fee(s) paid 
19.08.2013Examination fee paid 
Examination procedure19.08.2013Examination requested  [2013/51]
14.03.2014Amendment by applicant (claims and/or description)
15.02.2016Despatch of a communication from the examining division (Time limit: M06)
24.08.2016Reply to a communication from the examining division
09.05.2017Date of oral proceedings
01.06.2017Minutes of oral proceedings despatched
14.06.2017Communication of intention to grant the patent
17.10.2017Fee for grant paid
17.10.2017Fee for publishing/printing paid
17.10.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.02.2016
Opposition(s)30.08.2018No opposition filed within time limit [2018/45]
Fees paidRenewal fee
27.02.2014Renewal fee patent year 03
26.02.2015Renewal fee patent year 04
26.02.2016Renewal fee patent year 05
23.02.2017Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.02.2012
AL29.11.2017
AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
MK29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
IE07.02.2018
LU07.02.2018
MT07.02.2018
BE28.02.2018
BG28.02.2018
CH28.02.2018
FR28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
IS29.03.2018
[2020/33]
Former [2020/31]HU07.02.2012
AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
MK29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
IE07.02.2018
LU07.02.2018
MT07.02.2018
BE28.02.2018
BG28.02.2018
CH28.02.2018
FR28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
Former [2020/27]HU07.02.2012
AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
IE07.02.2018
LU07.02.2018
MT07.02.2018
BE28.02.2018
BG28.02.2018
CH28.02.2018
FR28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
Former [2020/16]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
IE07.02.2018
LU07.02.2018
MT07.02.2018
BE28.02.2018
BG28.02.2018
CH28.02.2018
FR28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
Former [2020/08]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
IE07.02.2018
LU07.02.2018
MT07.02.2018
BE28.02.2018
BG28.02.2018
CH28.02.2018
FR28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
Former [2019/12]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
IE07.02.2018
LU07.02.2018
BE28.02.2018
BG28.02.2018
CH28.02.2018
FR28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
Former [2019/09]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
IE07.02.2018
LU07.02.2018
BG28.02.2018
CH28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/52]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
LU07.02.2018
BG28.02.2018
CH28.02.2018
LI28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/44]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/40]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/39]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
RS29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/37]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
RS29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/35]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
RS29.11.2017
SE29.11.2017
SK29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/34]AT29.11.2017
DK29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
RS29.11.2017
SE29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/24]AT29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
RS29.11.2017
SE29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/23]AT29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
RS29.11.2017
SE29.11.2017
NO28.02.2018
GR01.03.2018
Former [2018/22]ES29.11.2017
FI29.11.2017
LT29.11.2017
NO28.02.2018
Cited inInternational search[XI]US2009241578  (CARLSON ANDREW B [US], et al) [X] 1-4,8,11,12 * abstract * * paragraph [0016] * * paragraph [0036] - paragraph [0040]; figures 1A,1B * * paragraph [0046] * * paragraph [0070]; figures 4A,4B * * paragraph [0075] - paragraph [0078] * * paragraph [0093] *[I] 5-7,9,10,13-17;
 [XI]US2010114356  (SCHMITT TY [US], et al) [X] 1-5,8,11-19 * paragraph [0025] - paragraph [0028]; figures 1,2A,2B * * paragraph [0030]; figure 4 * * paragraph [0036] - paragraph [0037]; figure 7 * [I] 6,7,9,10,20;
 [XI]US2010139887  (SLESSMAN GEORGE [US]) [X] 1-13,15,16 * abstract * * paragraph [0036]; figure 1A * * paragraph [0039] - paragraph [0042]; figure 2 * * paragraph [0068] - paragraph [0080]; figure 15 * [I] 14,17-20
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.