EP2673575 - SYSTEM FOR COOLING MEDIUM INTRODUCTION INTO A CONTAINER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.06.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 17.07.2020 | ||
Former | Grant of patent is intended Status updated on 19.03.2020 | ||
Former | Examination is in progress Status updated on 27.04.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states ACP Belgium N.V. Dellestraat 55 3550 Heusden-Zolder / BE | [2013/51] | Inventor(s) | 01 /
DYCKMANS, Peter Ruiterijstraat 7 B-3920 Lommel / BE | 02 /
TIMMERMANS, Rik Koning Albertlaan 75 B-3920 Lommel / BE | 03 /
VANSANT, Jan Wittehoevelaan 32 B-3000 Leuven / BE | 04 /
GÓRZYNSKA, Joanna Ul. Kosynierów Kosciuszkowskich 9/52 PL-87-100 Torun / PL | 05 /
REMIEZOWICZ, Eryk Atolowa 4/7 PL-85-435 Osówiec Gm. Sicienko / PL | 06 /
HAJEK, Règis 34 rue Westerend F-67310 Westhoffen / FR | 07 /
LAUTEROWSKI, Wojciech ul. Parkowa 57 PL-87-800 Wloclawek / PL | [2013/51] | Representative(s) | Brants, Johan P.E. Brantsandpatents bvba Pauline Van Pottelsberghelaan 24 9051 Ghent / BE | [2020/34] |
Former [2013/51] | Brants, Johan P.E. Brantsandpatents bvba Guldensporenpark 75 9820 Merelbeke / BE | Application number, filing date | 12705238.9 | 09.02.2012 | [2020/34] | WO2012EP52208 | Priority number, date | PL20110393898 | 09.02.2011 Original published format: PL 39389811 | PL20110394550 | 13.04.2011 Original published format: PL 39455011 | PL20110395828 | 01.08.2011 Original published format: PL 39582811 | [2013/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012107518 | Date: | 16.08.2012 | Language: | EN | [2012/33] | Type: | A2 Application without search report | No.: | EP2673575 | Date: | 18.12.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.08.2012 takes the place of the publication of the European patent application. | [2013/51] | Type: | B1 Patent specification | No.: | EP2673575 | Date: | 19.08.2020 | Language: | EN | [2020/34] | Search report(s) | International search report - published on: | EP | 01.11.2012 | Classification | IPC: | F25B25/00 | [2013/51] | CPC: |
F25D3/125 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEM ZUR EINFÜHRUNG EINES KÜHLMEDIUMS IN EINEN BEHÄLTER | [2013/51] | English: | SYSTEM FOR COOLING MEDIUM INTRODUCTION INTO A CONTAINER | [2013/51] | French: | SYSTÈME POUR L'INTRODUCTION D'UN AGENT DE REFROIDISSEMENT DANS UN RÉCIPIENT | [2020/10] |
Former [2013/51] | SYSTÈME POUR L'INTRODUCTION DE MILIEU DE REFROIDISSEMENT DANS UN RÉCIPIENT | Entry into regional phase | 09.09.2013 | National basic fee paid | 09.09.2013 | Designation fee(s) paid | 09.09.2013 | Examination fee paid | Examination procedure | 06.12.2012 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 09.09.2013 | Examination requested [2013/51] | 10.02.2014 | Amendment by applicant (claims and/or description) | 03.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 03.09.2018 | Reply to a communication from the examining division | 01.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 11.09.2019 | Reply to a communication from the examining division | 20.03.2020 | Communication of intention to grant the patent | 10.07.2020 | Fee for grant paid | 10.07.2020 | Fee for publishing/printing paid | 10.07.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.05.2018 | Opposition(s) | 20.05.2021 | No opposition filed within time limit [2021/30] | Fees paid | Renewal fee | 20.02.2014 | Renewal fee patent year 03 | 23.02.2015 | Renewal fee patent year 04 | 22.02.2016 | Renewal fee patent year 05 | 17.02.2017 | Renewal fee patent year 06 | 22.02.2018 | Renewal fee patent year 07 | 21.02.2019 | Renewal fee patent year 08 | 10.02.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.02.2012 | AL | 19.08.2020 | AT | 19.08.2020 | CY | 19.08.2020 | DK | 19.08.2020 | EE | 19.08.2020 | FI | 19.08.2020 | HR | 19.08.2020 | IT | 19.08.2020 | LT | 19.08.2020 | LV | 19.08.2020 | MC | 19.08.2020 | MK | 19.08.2020 | NL | 19.08.2020 | PL | 19.08.2020 | RO | 19.08.2020 | RS | 19.08.2020 | SE | 19.08.2020 | SI | 19.08.2020 | SM | 19.08.2020 | BG | 19.11.2020 | NO | 19.11.2020 | GR | 20.11.2020 | IS | 19.12.2020 | GB | 09.02.2021 | IE | 09.02.2021 | LU | 09.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | FR | 28.02.2021 | LI | 28.02.2021 | [2024/22] |
Former [2023/27] | HU | 09.02.2012 | |
AL | 19.08.2020 | ||
AT | 19.08.2020 | ||
CY | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
GB | 09.02.2021 | ||
IE | 09.02.2021 | ||
LU | 09.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/24] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CY | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
GB | 09.02.2021 | ||
IE | 09.02.2021 | ||
LU | 09.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/34] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
GB | 09.02.2021 | ||
IE | 09.02.2021 | ||
LU | 09.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/08] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
GB | 09.02.2021 | ||
IE | 09.02.2021 | ||
LU | 09.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
IE | 09.02.2021 | ||
LU | 09.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
LU | 09.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/36] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/34] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/25] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/24] | AT | 19.08.2020 | |
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/23] | DK | 19.08.2020 | |
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/22] | DK | 19.08.2020 | |
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/20] | DK | 19.08.2020 | |
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/12] | FI | 19.08.2020 | |
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/10] | FI | 19.08.2020 | |
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
Former [2021/09] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
Former [2021/08] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
Former [2021/07] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
NO | 19.11.2020 | Cited in | International search | [Y]US4404818 (FRANKLIN JR PAUL R [US]) [Y] 4,5 * figures 1-3 *; | [AD]EP0823600 (OLIVO [FR]) [AD] 1-15 * the whole document *; | [XYI]DE19808267 (MESSER FRANCE SA [FR]) [X] 1,2,10 * column 3, line 51 - column 4, line 4 * * column 5, line 39 - column 7, line 14 * * claim 8 * * figures 1-5 * [Y] 4-9,11-15 [I] 3; | [A]EP0942244 (OLIVO [FR]) [A] 1 * the whole document *; | [Y]EP1048228 (TV KOHLENSAEURE [DE]) [Y] 9,11-15 * the whole document *; | [AD]EP1291594 (OLIVO [FR]) [AD] 1 * the whole document *; | [AD]EP1326046 (NORSK HYDRO AS [NO]) [AD] 1* the whole document *; | [Y]FR2839774 (OLIVO [FR]) [Y] 6-8 * the whole document *; | [A]FR2891899 (AIR LIQUIDE [FR]) [A] 1 * the whole document * | by applicant | EP0823600 | EP1291594 | EP1326046 |