blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2679025

EP2679025 - MRI SAFE ACTUATOR FOR IMPLANTABLE FLOATING MASS TRANSDUCER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.07.2018
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  04.08.2017
FormerGrant of patent is intended
Status updated on  26.03.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Med-El Elektromedizinische Geräte GmbH
Fürstenweg 77a
6020 Innsbruck / AT
[2016/29]
Former [2014/01]For all designated states
Vibrant Med-el Hearing Technology GmbH
Fuerstenweg 77
6020 Innsbruck / AT
Inventor(s)01 / BALL, Geoffrey, R.
Koegele Strasse 40
6094 Axams / AT
 [2017/36]
Former [2014/01]01 / BALL, Geoffrey, R.
Koegele Strasse 40
A-6094 Axams / AT
Representative(s)Gillard, Matthew Paul
Withers & Rogers LLP
2 London Bridge
London SE1 9RA / GB
[N/P]
Former [2017/36]Gillard, Matthew Paul
Withers & Rogers LLP
4 More London Riverside
London SE1 2AU / GB
Former [2014/01]Hall, Christopher David
Withers & Rogers LLP
4 More London Riverside
London SE1 2AU / GB
Application number, filing date12708074.523.02.2012
[2017/36]
WO2012US26238
Priority number, dateUS201161446279P24.02.2011         Original published format: US 201161446279 P
[2014/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012116130
Date:30.08.2012
Language:EN
[2012/35]
Type: A1 Application with search report 
No.:EP2679025
Date:01.01.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 30.08.2012 takes the place of the publication of the European patent application.
[2014/01]
Type: B1 Patent specification 
No.:EP2679025
Date:06.09.2017
Language:EN
[2017/36]
Search report(s)International search report - published on:EP30.08.2012
ClassificationIPC:H04R11/00, H04R25/00
[2017/12]
CPC:
H04R25/606 (EP,US); H04R11/00 (EP,US); H04R2460/13 (US)
Former IPC [2014/01]H04R25/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/01]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:MRI-SICHERER AKTUATOR FÜR IMPLANTIERBAREN FLOATING MASS TRANSDUCER (FMT)[2014/01]
English:MRI SAFE ACTUATOR FOR IMPLANTABLE FLOATING MASS TRANSDUCER[2014/01]
French:ACTIONNEUR RÉSISTANT À L'IRM POUR TRANSDUCTEUR À MASSE FLOTTANTE IMPLANTABLE[2014/01]
Entry into regional phase05.09.2013National basic fee paid 
05.09.2013Designation fee(s) paid 
05.09.2013Examination fee paid 
Examination procedure05.09.2013Examination requested  [2014/01]
31.03.2014Amendment by applicant (claims and/or description)
27.03.2017Communication of intention to grant the patent
25.07.2017Fee for grant paid
25.07.2017Fee for publishing/printing paid
25.07.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  27.03.2017
Opposition(s)07.06.2018No opposition filed within time limit [2018/33]
Fees paidRenewal fee
07.02.2014Renewal fee patent year 03
27.02.2015Renewal fee patent year 04
26.02.2016Renewal fee patent year 05
27.02.2017Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.02.2012
AL06.09.2017
AT06.09.2017
CY06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
NL06.09.2017
PL06.09.2017
PT06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
GB23.02.2018
IE23.02.2018
LU23.02.2018
MT23.02.2018
CH28.02.2018
LI28.02.2018
[2020/34]
Former [2020/31]HU23.02.2012
AT06.09.2017
CY06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
NL06.09.2017
PL06.09.2017
PT06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
GB23.02.2018
IE23.02.2018
LU23.02.2018
MT23.02.2018
CH28.02.2018
LI28.02.2018
Former [2020/27]HU23.02.2012
AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
PT06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
GB23.02.2018
IE23.02.2018
LU23.02.2018
MT23.02.2018
CH28.02.2018
LI28.02.2018
Former [2020/16]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
GB23.02.2018
IE23.02.2018
LU23.02.2018
MT23.02.2018
CH28.02.2018
LI28.02.2018
Former [2020/08]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
GB23.02.2018
IE23.02.2018
LU23.02.2018
MT23.02.2018
CH28.02.2018
LI28.02.2018
Former [2019/13]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
GB23.02.2018
IE23.02.2018
LU23.02.2018
CH28.02.2018
LI28.02.2018
Former [2019/09]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
IE23.02.2018
LU23.02.2018
CH28.02.2018
LI28.02.2018
Former [2018/52]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
LU23.02.2018
CH28.02.2018
LI28.02.2018
Former [2018/44]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/39]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/24]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/23]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SK06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/21]CZ06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/15]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/12]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/11]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/08]FI06.09.2017
LT06.09.2017
NO06.12.2017
Former [2018/07]LT06.09.2017
NO06.12.2017
Cited inInternational search[XY]US2010145135  (BALL GEOFFREY [AT], et al) [X] 1 * abstract * * paragraphs [0029] - [0046] * [Y] 2-8;
 [I]US2011022120  (BALL GEOFFREY R [AT], et al) [I] 1-3,7 * the whole document *;
 [Y]EP2031896  (MED EL ELEKTROMED GERAETE GMBH [AT]) [Y] 2,3,7,8 * abstract * * paragraphs [0039] - [0060] *;
 [Y]US5897486  (BALL GEOFFREY R [US], et al) [Y] 4-6 * the whole document *;
 [A]US5800336  (BALL GEOFFREY R [US], et al) [A] 2,3,6 * abstract * * columns 10-14 *
by applicantUS7566296
 US6676592
 US20090227632
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.