EP2694892 - ICE CUBE MAKER SYSTEM AND REFRIGERATOR COMPRISING SUCH AN ICE CUBE MAKER SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.03.2020 Database last updated on 22.05.2024 | |
Former | The patent has been granted Status updated on 05.04.2019 | ||
Former | Grant of patent is intended Status updated on 19.11.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states BSH Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | [2015/13] |
Former [2014/07] | For all designated states BSH Bosch und Siemens Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | Inventor(s) | 01 /
BORMANN, Marietta Schlegelstr. 1 89522 Heidenheim / DE | 02 /
CIZIK, Herbert Hornbergstr. 19 73113 Ottenbach / DE | 03 /
PFISTER, Bernd Antoniusweg 18 89079 Ulm / DE | [2014/07] | Application number, filing date | 12713095.3 | 29.03.2012 | [2019/19] | WO2012EP55640 | Priority number, date | DE20111006858 | 06.04.2011 Original published format: DE102011006858 | [2014/07] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2012136563 | Date: | 11.10.2012 | Language: | DE | [2012/41] | Type: | A2 Application without search report | No.: | EP2694892 | Date: | 12.02.2014 | Language: | DE | The application published by WIPO in one of the EPO official languages on 11.10.2012 takes the place of the publication of the European patent application. | [2014/07] | Type: | B1 Patent specification | No.: | EP2694892 | Date: | 08.05.2019 | Language: | DE | [2019/19] | Search report(s) | International search report - published on: | EP | 29.11.2012 | Classification | IPC: | F25C5/18 | [2014/07] | CPC: |
F25C5/185 (EP,US);
F25C1/25 (EP);
F25C2305/0221 (EP,US);
F25C2400/10 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | EISSTÜCKBEREITERSYSTEM UND KÄLTEGERÄT MIT EINEM SOLCHEN EISSTÜCKBEREITERSYSTEM | [2014/07] | English: | ICE CUBE MAKER SYSTEM AND REFRIGERATOR COMPRISING SUCH AN ICE CUBE MAKER SYSTEM | [2014/07] | French: | SYSTÈME DE MACHINE À GLAÇONS ET APPAREIL DE FROID ÉQUIPÉ D'UN SYSTÈME DE MACHINE À GLAÇONS DE CE TYPE | [2014/07] | Entry into regional phase | 06.11.2013 | National basic fee paid | 06.11.2013 | Designation fee(s) paid | 06.11.2013 | Examination fee paid | Examination procedure | 06.11.2013 | Examination requested [2014/07] | 22.05.2014 | Amendment by applicant (claims and/or description) | 20.11.2018 | Communication of intention to grant the patent | 13.02.2019 | Fee for grant paid | 13.02.2019 | Fee for publishing/printing paid | 13.02.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.11.2018 | Opposition(s) | 11.02.2020 | No opposition filed within time limit [2020/16] | Fees paid | Renewal fee | 31.03.2014 | Renewal fee patent year 03 | 31.03.2015 | Renewal fee patent year 04 | 31.03.2016 | Renewal fee patent year 05 | 31.03.2017 | Renewal fee patent year 06 | 03.04.2018 | Renewal fee patent year 07 | 01.04.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.03.2012 | AL | 08.05.2019 | CY | 08.05.2019 | CZ | 08.05.2019 | DK | 08.05.2019 | EE | 08.05.2019 | ES | 08.05.2019 | FI | 08.05.2019 | HR | 08.05.2019 | LT | 08.05.2019 | LV | 08.05.2019 | MC | 08.05.2019 | MK | 08.05.2019 | MT | 08.05.2019 | NL | 08.05.2019 | RO | 08.05.2019 | RS | 08.05.2019 | SE | 08.05.2019 | SI | 08.05.2019 | SK | 08.05.2019 | SM | 08.05.2019 | BG | 08.08.2019 | NO | 08.08.2019 | GR | 09.08.2019 | IS | 08.09.2019 | PT | 08.09.2019 | [2022/31] |
Former [2022/30] | HU | 29.03.2012 | |
AL | 08.05.2019 | ||
CY | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
MT | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
IS | 08.09.2019 | ||
PT | 08.09.2019 | ||
Former [2022/27] | HU | 29.03.2012 | |
AL | 08.05.2019 | ||
CY | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
MT | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/49] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/26] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/14] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/11] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/10] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/09] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/51] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/50] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/49] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
NL | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/48] | ES | 08.05.2019 | |
FI | 08.05.2019 | ||
LT | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/47] | ES | 08.05.2019 | |
FI | 08.05.2019 | ||
LT | 08.05.2019 | ||
NO | 08.08.2019 | Cited in | International search | [X]WO2008030020 (LG ELECTRONICS INC [KR], et al) [X] 1,3-7,9-11,15-17* abstract *; | [X]EP1939551 (WHIRLPOOL CO [US]) [X] 1-5,10,17 * paragraph [0028] - paragraph [0029]; figure 3 *; | [X]US2010126203 (KIM JI HOON [KR], et al) [X] 1-5,10,11,15-17 * paragraph [0048] - paragraph [0056]; figures 2-6 * |