EP2689270 - MATERIALS, METHOD, AND APPARATUS FOR DETECTING NEUTRONS AND IONIZING RADIATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.10.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 03.12.2018 | ||
Former | Grant of patent is intended Status updated on 23.03.2018 | ||
Former | Examination is in progress Status updated on 26.01.2018 | ||
Former | Grant of patent is intended Status updated on 17.09.2017 | ||
Former | Examination is in progress Status updated on 06.09.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Nanoptics, Incorporated 3014 N.E. 21st Way Gainesville, FL 32609 / US | [2014/05] | Inventor(s) | 01 /
WALKER, James K. 2425 N.W. 26th Place Gainesville, FL 32605 / US | 02 /
FARLEY, Richard T. 2058 N.W. 50th Place Gainesville, FL 32605 / US | 03 /
NOH, Youngwook 1107 S.W. 83rd Way Gainesville, FL 32607 / US | [2014/05] | Representative(s) | Hartig, Michael Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2018/49] |
Former [2014/05] | Hartig, Michael Boehmert & Boehmert Pettenkoferstrasse 20-22 80336 München / DE | Application number, filing date | 12718466.1 | 26.03.2012 | [2018/49] | WO2012US30606 | Priority number, date | US201161467613P | 25.03.2011 Original published format: US 201161467613 P | US201161482485P | 04.05.2011 Original published format: US 201161482485 P | [2014/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012135140 | Date: | 04.10.2012 | Language: | EN | [2012/40] | Type: | A2 Application without search report | No.: | EP2689270 | Date: | 29.01.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.10.2012 takes the place of the publication of the European patent application. | [2014/05] | Type: | B1 Patent specification | No.: | EP2689270 | Date: | 05.12.2018 | Language: | EN | [2018/49] | Search report(s) | International search report - published on: | EP | 10.01.2013 | Classification | IPC: | G01T1/203, C09K11/06, G21K4/00, G01T3/06 | [2017/33] | CPC: |
G01T1/203 (EP,US);
G01T1/2033 (US);
C09K11/06 (EP,US);
C09K9/02 (US);
G01T3/06 (EP,US);
G21K4/00 (EP,US);
C09K2211/10 (EP,US);
C09K2211/1007 (EP,US);
C09K2211/1011 (EP,US);
|
Former IPC [2014/05] | G01T3/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/05] | Title | German: | MATERIALIEN, VERFAHREN UND VORRICHTUNG ZUR ERKENNUNG VON NEUTRONEN UND IONISIERENDER STRAHLUNG | [2014/05] | English: | MATERIALS, METHOD, AND APPARATUS FOR DETECTING NEUTRONS AND IONIZING RADIATION | [2014/05] | French: | MATÉRIAUX, PROCÉDÉ ET APPAREIL POUR DÉTECTER LES NEUTRONS ET LES RAYONNEMENTS IONISANTS | [2014/05] | Entry into regional phase | 09.10.2013 | National basic fee paid | 09.10.2013 | Designation fee(s) paid | 09.10.2013 | Examination fee paid | Examination procedure | 09.10.2013 | Examination requested [2014/05] | 14.05.2014 | Amendment by applicant (claims and/or description) | 07.11.2014 | Despatch of a communication from the examining division (Time limit: M06) | 18.05.2015 | Reply to a communication from the examining division | 31.08.2015 | Despatch of a communication from the examining division (Time limit: M06) | 07.04.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 17.06.2016 | Reply to a communication from the examining division | 11.07.2017 | Date of oral proceedings | 11.09.2017 | Minutes of oral proceedings despatched | 18.09.2017 | Communication of intention to grant the patent | 18.01.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 18.01.2018 | Fee for grant paid | 18.01.2018 | Fee for publishing/printing paid | 23.03.2018 | Information about intention to grant a patent | 23.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.11.2014 | Opposition(s) | 06.09.2019 | No opposition filed within time limit [2019/46] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 17.06.2016 | Request for further processing filed | 17.06.2016 | Full payment received (date of receipt of payment) Request granted | 01.07.2016 | Decision despatched | Fees paid | Renewal fee | 27.03.2014 | Renewal fee patent year 03 | 10.03.2015 | Renewal fee patent year 04 | 10.03.2016 | Renewal fee patent year 05 | 10.03.2017 | Renewal fee patent year 06 | 27.09.2018 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 31.03.2018 | 07   M06   Fee paid on   27.09.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.03.2012 | AL | 05.12.2018 | AT | 05.12.2018 | CY | 05.12.2018 | CZ | 05.12.2018 | DK | 05.12.2018 | EE | 05.12.2018 | ES | 05.12.2018 | FI | 05.12.2018 | HR | 05.12.2018 | IT | 05.12.2018 | LT | 05.12.2018 | LV | 05.12.2018 | MC | 05.12.2018 | MK | 05.12.2018 | NL | 05.12.2018 | PL | 05.12.2018 | RO | 05.12.2018 | RS | 05.12.2018 | SE | 05.12.2018 | SI | 05.12.2018 | SK | 05.12.2018 | SM | 05.12.2018 | TR | 05.12.2018 | BG | 05.03.2019 | NO | 05.03.2019 | GR | 06.03.2019 | IE | 26.03.2019 | LU | 26.03.2019 | MT | 26.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | IS | 05.04.2019 | PT | 05.04.2019 | [2022/31] |
Former [2021/32] | HU | 26.03.2012 | |
AL | 05.12.2018 | ||
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IE | 26.03.2019 | ||
LU | 26.03.2019 | ||
MT | 26.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2021/26] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IE | 26.03.2019 | ||
LU | 26.03.2019 | ||
MT | 26.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2020/29] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IE | 26.03.2019 | ||
LU | 26.03.2019 | ||
MT | 26.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2020/17] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IE | 26.03.2019 | ||
LU | 26.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2020/11] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IE | 26.03.2019 | ||
LU | 26.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2020/09] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IE | 26.03.2019 | ||
LU | 26.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2020/01] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
LU | 26.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/50] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/48] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/46] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/39] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/37] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/35] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/34] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
IT | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/33] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/30] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/26] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/25] | AT | 05.12.2018 | |
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/24] | AT | 05.12.2018 | |
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/23] | AT | 05.12.2018 | |
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
Former [2019/22] | FI | 05.12.2018 | |
LT | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
Former [2019/21] | FI | 05.12.2018 | |
LT | 05.12.2018 | ||
NO | 05.03.2019 | ||
Former [2019/20] | LT | 05.12.2018 | |
NO | 05.03.2019 | Cited in | International search | [A]US3010908 (EDWARD BRODERICK, et al) [A] 1-67 * the whole document *; | [I]US3960756 (NOAKES JOHN E) [I] 1-67 * claims 1-8 * * the whole document *; | [X]US4495084 (SHIMIZU TOHRU [JP], et al) [X] 1-67* the whole document *; | [X]US4594179 (HARRAH LARRY A [US], et al) [X] 1-67 * claims 17,18 * * examples 1-3 * * the whole document *; | [XI]US5298189 (KAUFFMAN JOEL M [US]) [X] 1-18,32,33,38-40,46-51,58-67 * examples 1-14 * * claims 1-26 * * the whole document * [I] 19-31,35-37,41-45,52-57; | [X]EP0606732 (NANOPTICS INC [US]) [X] 1-67 * claims 1-3,7,9,12,13-18,21-23, * * the whole document *; | [X] - VINCENZO VENDITTO ET AL, "Orientation and Microenvironment of Naphthalene Guest in the Host Nanoporous Phase of Syndiotactic Polystyrene", MACROMOLECULES, (20050325), vol. 38, no. 9, doi:10.1021/ma047863n, ISSN 0024-9297, pages 3696 - 3702, XP055045111 [X] 1-67 * the whole document * DOI: http://dx.doi.org/10.1021/ma047863n | [X] - NEWHOUSE E I ET AL, "Fractal-like energy transport and fusion in a naphthalene-doped polymeric glass", JOURNAL OF LUMINESCENCE, ELSEVIER BV NORTH-HOLLAND, NL, vol. 31-32, doi:10.1016/0022-2313(84)90087-5, ISSN 0022-2313, (19841201), pages 651 - 653, (19841201), XP024503753 [X] 1-57,63-67 * the whole document * DOI: http://dx.doi.org/10.1016/0022-2313(84)90087-5 | by applicant | US5606638 | - MARK FLASKA; SARA A. POZZI, NUCLEAR INSTRUMENTS AND METHODS IN PHYSICS RESEARCH, (2009), vol. 599, no. 2-3, pages 221 - 225 | - HULL ET AL., IEEE TRANSACTIONS ON NUCLEAR SCIENCE, vol. 56, no. 3, pages 899 - 903 | - PERRIN, J., ANN CHEM. PHYS., (1932), vol. 17, page 283 | - ERMOLAEV, V. L., SOV. PHYSICS, DOKLADY, (1967), vol. 6, page 600 | - GUSTEN H. ET AL., "Photophysical Properties of Fluoranthene and its Benzo Analoques", JOURNAL OF PHOTOCHEMISTRY, (1982), vol. 18, pages 9 - 17 | - GEHRING M. ET AL., "Delayed Excimer Fluorescence of Fluoranthene Due to Triplet-Triplet Annihilation: Systematic Study of the Fluorescence from a Weakly Bound Excimer", ZEITSCH. FUR PHYS. CHEM., (2001), vol. 215, no. 3, pages 343 - 376 | - BOHNE C. ET AL., J. AM. CHCM. SOC., (1990), vol. 112, pages 4226 - 4231 | - BROOKS ET AL., IRE TRANS. NUCL. SC., (1960), vol. NS-7, page 35 | - MCKINSEY D. N. ET AL., NUCL. LNSTR. AND METHODS IN PHYSICS RESEARCH B, (1997), vol. 132, pages 351 - 358 | - BENNISTON A. ET AL., "Intramolecular Excimer Formation and Delayed Fluorescence in Sterically Constrained Pyrcnc Dimers", CHEM. EUR. J., (2007), vol. 13, doi:doi:10.1002/chem.200601498, pages 4665 - 4674, XP055123854 DOI: http://dx.doi.org/10.1002/chem.200601498 |