EP2715854 - ELECTROCHEMICAL CELL, COMPONENTS THEREOF, AND METHODS OF MAKING AND USING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.10.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 06.11.2020 | ||
Former | Grant of patent is intended Status updated on 28.06.2020 | ||
Former | Examination is in progress Status updated on 30.01.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Sion Power Corporation 2900 E. Elvira Rd. Tucson, AZ 85756 / US | [2014/15] | Inventor(s) | 01 /
SCORDILIS-KELLEY, Chariclea 10541 E. Wildfire Drive Tucson, AZ 85748 / US | 02 /
KUBICKI, Joseph 6186 Agee Street Unit 269 San Diego, CA 92122 / US | 03 /
CAO, Shuguang 13247 Glen Brae Drive Saratoga, CA 95070 / US | 04 /
MIKHAYLIK, Yuriy V. 10255 E. Covington Street Tucson, Arizona 85748 / US | [2014/15] | Representative(s) | Pallini Gervasi, Diego, et al Notarbartolo & Gervasi S.p.A. Viale Achille Papa, 30 20149 Milano / IT | [N/P] |
Former [2014/15] | Pallini Gervasi, Diego, et al Notarbartolo & Gervasi GmbH Bavariaring 21 80336 Munich / DE | Application number, filing date | 12723031.6 | 11.05.2012 | [2020/50] | WO2012US37635 | Priority number, date | US201113114944 | 24.05.2011 Original published format: US201113114944 | US201113227427 | 07.09.2011 Original published format: US201113227427 | [2014/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012161989 | Date: | 29.11.2012 | Language: | EN | [2012/48] | Type: | A1 Application with search report | No.: | EP2715854 | Date: | 09.04.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.11.2012 takes the place of the publication of the European patent application. | [2014/15] | Type: | B1 Patent specification | No.: | EP2715854 | Date: | 09.12.2020 | Language: | EN | [2020/50] | Search report(s) | International search report - published on: | EP | 29.11.2012 | Classification | IPC: | H01M10/052, H01M4/58, H01M4/38, H01M10/0567, H01M2/14 | [2014/15] | CPC: |
H01M4/134 (EP,CN);
H01M10/0568 (EP,KR);
H01M4/382 (EP,CN);
H01M50/40 (EP,CN,US);
H01M10/052 (KR);
H01M10/0525 (EP,CN);
H01M10/056 (KR);
H01M10/0567 (EP,CN,KR);
H01M10/0569 (EP);
H01M10/4235 (CN);
H01M4/136 (EP,CN);
H01M4/362 (EP);
H01M4/581 (EP,CN);
H01M4/60 (KR);
H01M4/606 (KR);
H01M4/62 (EP,CN);
H01M2300/0017 (EP);
H01M2300/0037 (EP);
Y02E60/10 (EP,KR)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BATTERIEZELLE, KOMPONENTEN DAVON SOWIE VERFAHREN ZUR HERSTELLUNG UND VERWENDUNG | [2014/15] | English: | ELECTROCHEMICAL CELL, COMPONENTS THEREOF, AND METHODS OF MAKING AND USING SAME | [2014/15] | French: | CELLULE ÉLECTROCHIMIQUE, SES COMPOSANTS ET SES PROCÉDÉS DE FABRICATION ET D'UTILISATION | [2014/15] | Entry into regional phase | 19.12.2013 | National basic fee paid | 19.12.2013 | Designation fee(s) paid | 19.12.2013 | Examination fee paid | Examination procedure | 19.12.2013 | Examination requested [2014/15] | 14.07.2014 | Amendment by applicant (claims and/or description) | 30.05.2016 | Despatch of a communication from the examining division (Time limit: M04) | 29.09.2016 | Reply to a communication from the examining division | 19.01.2018 | Despatch of a communication from the examining division (Time limit: M02) | 15.03.2018 | Reply to a communication from the examining division | 08.07.2019 | Despatch of a communication from the examining division (Time limit: M02) | 06.09.2019 | Reply to a communication from the examining division | 24.10.2019 | Despatch of a communication from the examining division (Time limit: M02) | 19.12.2019 | Reply to a communication from the examining division | 29.06.2020 | Communication of intention to grant the patent | 27.10.2020 | Fee for grant paid | 27.10.2020 | Fee for publishing/printing paid | 27.10.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20211537.4 / EP3826094 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 30.05.2016 | Opposition(s) | 10.09.2021 | No opposition filed within time limit [2021/46] | Fees paid | Renewal fee | 27.05.2014 | Renewal fee patent year 03 | 27.05.2015 | Renewal fee patent year 04 | 27.05.2016 | Renewal fee patent year 05 | 30.05.2017 | Renewal fee patent year 06 | 29.05.2018 | Renewal fee patent year 07 | 28.05.2019 | Renewal fee patent year 08 | 27.05.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.05.2012 | AL | 09.12.2020 | AT | 09.12.2020 | CY | 09.12.2020 | CZ | 09.12.2020 | DK | 09.12.2020 | EE | 09.12.2020 | ES | 09.12.2020 | FI | 09.12.2020 | HR | 09.12.2020 | IT | 09.12.2020 | LT | 09.12.2020 | LV | 09.12.2020 | MC | 09.12.2020 | MK | 09.12.2020 | MT | 09.12.2020 | NL | 09.12.2020 | PL | 09.12.2020 | RO | 09.12.2020 | RS | 09.12.2020 | SE | 09.12.2020 | SI | 09.12.2020 | SK | 09.12.2020 | SM | 09.12.2020 | TR | 09.12.2020 | BG | 09.03.2021 | NO | 09.03.2021 | GR | 10.03.2021 | IS | 09.04.2021 | PT | 09.04.2021 | IE | 11.05.2021 | LU | 11.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/41] |
Former [2024/29] | HU | 11.05.2012 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
MK | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
TR | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 11.05.2021 | ||
LU | 11.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2024/22] | HU | 11.05.2012 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
MK | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 11.05.2021 | ||
LU | 11.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/29] | HU | 11.05.2012 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 11.05.2021 | ||
LU | 11.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/24] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 11.05.2021 | ||
LU | 11.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 11.05.2021 | ||
LU | 11.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 11.05.2021 | ||
LU | 11.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
IE | 11.05.2021 | ||
LU | 11.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
LU | 11.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
LU | 11.05.2021 | ||
Former [2022/07] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/51] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/49] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/48] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/45] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/42] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/39] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/37] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/36] | CZ | 09.12.2020 | |
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/35] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/34] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/33] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/32] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/30] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/28] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/24] | FI | 09.12.2020 | |
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/23] | FI | 09.12.2020 | |
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/22] | FI | 09.12.2020 | |
RS | 09.12.2020 | ||
NO | 09.03.2021 | ||
Former [2021/20] | FI | 09.12.2020 | Cited in | International search | [X]JPS57147869 (NIPPON ELECTRIC CO) [X] 1-4,17,18,20 * pages 378-380 *; | [X]US5686201 (CHU MAY-YING [US]) [X] 1,2,5,8,10,17-20 * page 1, line 19 - page 4, line 26 ** column 4, line 29 - column 18, line 10 *; | [X]US2004048154 (JUNG YONGJU [KR], et al) [X] 1-3,6,7,9,10,12,13,17-20 * paragraphs [0023] - [0045]; example 1 *; | [XA]US2010129699 (MIKHAYLIK YURIY V [US], et al) [X] 1-3,5-7,9,10,12-14,17-20 * paragraphs [0025] , [0043] - [0095]; figures 5,6 * [A] 4,8,11,15,16 | Examination | US6110619 | US2005147886 | US2005156575 |