EP2859678 - METHODS AND ARRANGEMENTS FOR SUPPORTING RETRANSMISSION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 04.09.2020 | ||
Former | Grant of patent is intended Status updated on 09.01.2020 | ||
Former | Examination is in progress Status updated on 29.09.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2020/41] |
Former [2015/16] | For all designated states Telefonaktiebolaget LM Ericsson (PUBL) 164 83 Stockholm / SE | Inventor(s) | 01 /
ERIKSSON, Erik Landeryd Skogsstugan S-585 93 Linköping / SE | 02 /
HESSLER, Martin Kompanigatan 16 S-587 58 Linköping / SE | [2015/16] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2020/41] |
Former [2015/16] | Kühn, Friedrich Heinrich Ericsson AB Patent Unit Kista RAN 1 Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 12730056.4 | 08.06.2012 | [2020/41] | WO2012SE50618 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013184053 | Date: | 12.12.2013 | Language: | EN | [2013/50] | Type: | A1 Application with search report | No.: | EP2859678 | Date: | 15.04.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.12.2013 takes the place of the publication of the European patent application. | [2015/16] | Type: | B1 Patent specification | No.: | EP2859678 | Date: | 07.10.2020 | Language: | EN | [2020/41] | Search report(s) | International search report - published on: | EP | 12.12.2013 | Classification | IPC: | H04L1/16, H04L1/18, H04L1/00 | [2015/16] | CPC: |
H04L1/1887 (EP,US);
H04L1/0026 (EP,US);
H04L1/1671 (EP,US);
H04L5/0053 (US);
H04B7/024 (US);
H04B7/0413 (US);
H04B7/0608 (US);
H04B7/0632 (US);
H04B7/0814 (US);
H04L1/1607 (US);
H04L1/1825 (US);
H04L1/1838 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND ANORDNUNGEN ZUR NEUÜBERTRAGUNGSUNTERSTÜTZUNG | [2015/16] | English: | METHODS AND ARRANGEMENTS FOR SUPPORTING RETRANSMISSION | [2015/16] | French: | PROCÉDÉS ET SYSTÈMES POUR LA PRISE EN CHARGE D'UNE RETRANSMISSION | [2015/16] | Entry into regional phase | 17.12.2014 | National basic fee paid | 17.12.2014 | Designation fee(s) paid | 17.12.2014 | Examination fee paid | Examination procedure | 17.12.2014 | Examination requested [2015/16] | 31.07.2015 | Amendment by applicant (claims and/or description) | 29.09.2017 | Despatch of a communication from the examining division (Time limit: M04) | 15.01.2018 | Reply to a communication from the examining division | 10.01.2020 | Communication of intention to grant the patent | 06.05.2020 | Receipt of the translation of the claim(s) | 25.06.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 25.08.2020 | Fee for grant paid | 25.08.2020 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.09.2017 | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 25.08.2020 | Request for further processing filed | 25.08.2020 | Full payment received (date of receipt of payment) Request granted | 08.09.2020 | Decision despatched | Fees paid | Renewal fee | 17.12.2014 | Renewal fee patent year 03 | 29.06.2015 | Renewal fee patent year 04 | 27.06.2016 | Renewal fee patent year 05 | 27.06.2017 | Renewal fee patent year 06 | 27.06.2018 | Renewal fee patent year 07 | 27.06.2019 | Renewal fee patent year 08 | 29.06.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.06.2012 | AL | 07.10.2020 | AT | 07.10.2020 | CY | 07.10.2020 | CZ | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | ES | 07.10.2020 | FI | 07.10.2020 | HR | 07.10.2020 | IT | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | MK | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | RS | 07.10.2020 | SE | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | SM | 07.10.2020 | BG | 07.01.2021 | NO | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | IE | 08.06.2021 | LU | 08.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | FR | 30.06.2021 | LI | 30.06.2021 | [2024/22] |
Former [2023/29] | HU | 08.06.2012 | |
AL | 07.10.2020 | ||
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 08.06.2021 | ||
LU | 08.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/24] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 08.06.2021 | ||
LU | 08.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/34] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 08.06.2021 | ||
LU | 08.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/23] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 08.06.2021 | ||
LU | 08.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/21] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
IE | 08.06.2021 | ||
LU | 08.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/18] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
LU | 08.06.2021 | ||
Former [2022/10] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2022/08] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/49] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/48] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/45] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/37] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/36] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/35] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/34] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/33] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/32] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/28] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/25] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/24] | AT | 07.10.2020 | |
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/23] | FI | 07.10.2020 | |
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/22] | FI | 07.10.2020 | |
NL | 07.10.2020 | ||
RS | 07.10.2020 | ||
NO | 07.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/21] | FI | 07.10.2020 | |
NL | 07.10.2020 | ||
PT | 08.02.2021 | ||
Former [2021/20] | FI | 07.10.2020 | Cited in | International search | [X]EP1903747 (FUJITSU LTD [JP]) [X] 1-20 * column 10, paragraph 47 * * column 14, paragraph 75 - paragraph 76 * * column 18, paragraph 103 * * column 19, paragraph 109 * * column 20, paragraph 112 - column 21, paragraph 124 * * column 22, paragraph 130 *; | [X]EP2061174 (SONY CORP [JP], et al) [X] 1,3,6-8,10,12,15-17,19,20 * page 3, line 3 - line 25 ** page 6, line 9 - line 46 * |