EP2664191 - OBTAINING SYSTEM FRAME NUMBER OF TARGET CELL DURING HANDOVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.02.2019 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 16.03.2018 | ||
Former | Grant of patent is intended Status updated on 19.12.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states MediaTek Inc. No.1, Dusing Road 1st Science-Based Industrial Park Hsin-Chu / TW | [2013/47] | Inventor(s) | 01 /
TSAI, Chiou-Wei No.1, Dusing 1st Rd. Hsinchu Science Park Hsinchu 30078 / TW | 02 /
HSU, Chia-Chun 6F., No. 11, Baoqing St. Xindian Dist. New Taipei City 231 / TW | 03 /
WEI, Yi-Chun No. 55 Aly.34 Ln. 214 Sec.1, Yanping Rd., North Dist. Hsinchu / TW | 04 /
HWANG, Chien-Hwa No. 255 Guangming 9th Rd. Zhubei Hsinchu County / TW | [2018/16] |
Former [2013/47] | 01 /
TSAI, Chiou-Wei No. 295 Zhonghua St. Kouhu Township Yunlin County / TW | ||
02 /
HSU, Chia-Chun 16F.-3, No. 329 Sec. 2, Fuxing S. Rd. Taipei / TW | |||
03 /
WEI, Yi-Chun No. 55 Aly.34 Ln. 214 Sec.1, Yanping Rd., North Dist. Hsinchu / TW | |||
04 /
HWANG, Chien-Hwa No. 255 Guangming 9th Rd. Zhubei Hsinchu County / TW | Representative(s) | Hoefer & Partner Patentanwälte mbB Pilgersheimer Straße 20 81543 München / DE | [2018/16] |
Former [2013/47] | Hoefer & Partner Pilgersheimer Straße 20 81543 München / DE | Application number, filing date | 12734379.6 | 11.01.2012 | [2018/16] | WO2012CN70233 | Priority number, date | US201161431452P | 11.01.2011 Original published format: US 201161431452 P | US201213347016 | 10.01.2012 Original published format: US201213347016 | [2013/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012095003 | Date: | 19.07.2012 | Language: | EN | [2012/29] | Type: | A1 Application with search report | No.: | EP2664191 | Date: | 20.11.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.07.2012 takes the place of the publication of the European patent application. | [2013/47] | Type: | B1 Patent specification | No.: | EP2664191 | Date: | 18.04.2018 | Language: | EN | [2018/16] | Search report(s) | International search report - published on: | CN | 19.07.2012 | (Supplementary) European search report - dispatched on: | EP | 10.12.2015 | Classification | IPC: | H04W36/08, // H04W74/08 | [2016/02] | CPC: |
H04W36/08 (EP,US);
H04W74/0833 (EP,US)
|
Former IPC [2013/47] | H04W36/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | GEWINNUNG VON SYSTEMRAHMENNUMMERN VON ZIELZELLEN WÄHREND EINER ÜBERGABE | [2013/47] | English: | OBTAINING SYSTEM FRAME NUMBER OF TARGET CELL DURING HANDOVER | [2013/47] | French: | OBTENTION DU NOMBRE DE TRAMES SYSTÈMES D'UNE CELLULE CIBLE PENDANT UN TRANSFERT INTERCELLULAIRE | [2013/47] | Entry into regional phase | 12.08.2013 | National basic fee paid | 12.08.2013 | Search fee paid | 12.08.2013 | Designation fee(s) paid | 12.08.2013 | Examination fee paid | Examination procedure | 12.08.2013 | Examination requested [2013/47] | 27.04.2016 | Amendment by applicant (claims and/or description) | 20.12.2017 | Communication of intention to grant the patent | 07.03.2018 | Fee for grant paid | 07.03.2018 | Fee for publishing/printing paid | 07.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.12.2017 | Opposition(s) | 21.01.2019 | No opposition filed within time limit [2019/13] | Fees paid | Renewal fee | 31.01.2014 | Renewal fee patent year 03 | 30.01.2015 | Renewal fee patent year 04 | 18.11.2015 | Renewal fee patent year 05 | 13.01.2017 | Renewal fee patent year 06 | 18.01.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.01.2012 | AL | 18.04.2018 | AT | 18.04.2018 | CY | 18.04.2018 | CZ | 18.04.2018 | DK | 18.04.2018 | EE | 18.04.2018 | ES | 18.04.2018 | FI | 18.04.2018 | HR | 18.04.2018 | IT | 18.04.2018 | LT | 18.04.2018 | LV | 18.04.2018 | MC | 18.04.2018 | MK | 18.04.2018 | NL | 18.04.2018 | PL | 18.04.2018 | RO | 18.04.2018 | RS | 18.04.2018 | SE | 18.04.2018 | SI | 18.04.2018 | SK | 18.04.2018 | SM | 18.04.2018 | TR | 18.04.2018 | BG | 18.07.2018 | NO | 18.07.2018 | GR | 19.07.2018 | IS | 18.08.2018 | PT | 20.08.2018 | IE | 11.01.2019 | LU | 11.01.2019 | MT | 11.01.2019 | [2022/31] |
Former [2021/32] | HU | 11.01.2012 | |
AL | 18.04.2018 | ||
AT | 18.04.2018 | ||
CY | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
TR | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
IS | 18.08.2018 | ||
PT | 20.08.2018 | ||
IE | 11.01.2019 | ||
LU | 11.01.2019 | ||
MT | 11.01.2019 | ||
Former [2021/31] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CY | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
TR | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
IS | 18.08.2018 | ||
PT | 20.08.2018 | ||
IE | 11.01.2019 | ||
LU | 11.01.2019 | ||
MT | 11.01.2019 | ||
Former [2021/26] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CY | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
TR | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
IE | 11.01.2019 | ||
LU | 11.01.2019 | ||
MT | 11.01.2019 | ||
Former [2020/29] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
TR | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
IE | 11.01.2019 | ||
LU | 11.01.2019 | ||
MT | 11.01.2019 | ||
Former [2020/16] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
TR | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
IE | 11.01.2019 | ||
LU | 11.01.2019 | ||
Former [2020/09] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
IE | 11.01.2019 | ||
LU | 11.01.2019 | ||
Former [2019/44] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
LU | 11.01.2019 | ||
Former [2019/40] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
MC | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
Former [2019/26] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SI | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
Former [2019/12] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
IT | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SK | 18.04.2018 | ||
SM | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
Former [2019/10] | AL | 18.04.2018 | |
AT | 18.04.2018 | ||
CZ | 18.04.2018 | ||
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RO | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
SK | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
Former [2019/09] | AL | 18.04.2018 | |
DK | 18.04.2018 | ||
EE | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
Former [2019/08] | AL | 18.04.2018 | |
DK | 18.04.2018 | ||
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
Former [2019/03] | AL | 18.04.2018 | |
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
PT | 20.08.2018 | ||
Former [2018/52] | AL | 18.04.2018 | |
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
GR | 19.07.2018 | ||
Former [2018/51] | AL | 18.04.2018 | |
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
LT | 18.04.2018 | ||
LV | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
RS | 18.04.2018 | ||
SE | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
Former [2018/50] | AL | 18.04.2018 | |
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
HR | 18.04.2018 | ||
LT | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
SE | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
Former [2018/49] | AL | 18.04.2018 | |
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
LT | 18.04.2018 | ||
NL | 18.04.2018 | ||
PL | 18.04.2018 | ||
SE | 18.04.2018 | ||
BG | 18.07.2018 | ||
NO | 18.07.2018 | ||
Former [2018/47] | AL | 18.04.2018 | |
ES | 18.04.2018 | ||
FI | 18.04.2018 | ||
LT | 18.04.2018 | ||
NL | 18.04.2018 | ||
NO | 18.07.2018 | ||
Former [2018/46] | AL | 18.04.2018 | |
LT | 18.04.2018 | ||
NL | 18.04.2018 | ||
NO | 18.07.2018 | ||
Former [2018/43] | NL | 18.04.2018 | Documents cited: | Search | [A]WO2009022948 (ERICSSON TELEFON AB L M [SE], et al) [A] 1-15 * page 4, line 20 - page 6, line 26 *; | [A]WO2009082111 (SAMSUNG ELECTRONICS CO LTD [KR], et al) [A] 1-15 * paragraph [0023] - paragraph [0094] *; | [A]EP2160048 (ZTE CORP [CN]) [A] 1,9 * paragraph [0003] *; | [A] - TD TECH, "Interference mitigation method of 1.28Mcps TDD Home NodeBSynchronization", 3GPP DRAFT; R4-101605_INTERFERENCE MITIGATION METHOD OF 1.28MCPS TDD HOME NODEBSYNCHRONIZATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100520), vol. RAN WG4, no. Montreal, Canada; 20100510, XP050426611 [A] 1-15 * the whole document * | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 9)", 3GPP STANDARD; 3GPP TS 36.300, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101217), no. V9.6.0, pages 1 - 173, XP050462116 [A] 1-15 * paragraph [10.1.2.1] * * paragraph [15.3.3] * | International search | [Y]US2005197128 (YANG WU-HAN [TW]); | [A]WO2008135933 (NOKIA CORP [FI], et al); | [A]CN101626565 (UNIV CHONGQING POSTS & TELECOM); | [Y]CN101651877 (HUAWEI TECH CO LTD) | by applicant | US2005197128 | CN101651877 |