EP2813025 - METHOD AND APPARATUS FOR TRANSMIT TIMING ADJUSTMENT [Right-click to bookmark this link] | |||
Former [2014/51] | METHOD AND APPARATUS FOR TRANSMIT TIMING ADJUSTMENT | ||
[2015/49] | Status | No opposition filed within time limit Status updated on 01.09.2017 Database last updated on 19.10.2024 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2016/43] |
Former [2014/51] | For all designated states Telefonaktiebolaget L M Ericsson (Publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
BERGSTRÖM, Mattias Båtklubbsgatan 1 3 tr S-120 71 Stockholm / SE | 02 /
KAZMI, Muhammad Svartviksslingan 110 S-167 39 Bromma / SE | [2014/51] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2016/43] |
Former [2014/51] | Kühn, Friedrich Heinrich Ericsson AB Patent Unit Kista RAN 1 Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 12738251.3 | 20.06.2012 | [2016/43] | WO2012SE50692 | Priority number, date | US201261595856P | 07.02.2012 Original published format: US 201261595856 P | [2014/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013119160 | Date: | 15.08.2013 | Language: | EN | [2013/33] | Type: | A1 Application with search report | No.: | EP2813025 | Date: | 17.12.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.08.2013 takes the place of the publication of the European patent application. | [2014/51] | Type: | B1 Patent specification | No.: | EP2813025 | Date: | 26.10.2016 | Language: | EN | [2016/43] | Search report(s) | International search report - published on: | EP | 15.08.2013 | Classification | IPC: | H04L5/00 | [2014/51] | CPC: |
H04W56/0045 (EP,US);
H04L5/0053 (EP,US);
H04W56/00 (US);
H04W56/001 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND EINRICHTUNG ZUR SENDTAKTREGELUNG | [2015/49] | English: | METHOD AND APPARATUS FOR TRANSMIT TIMING ADJUSTMENT | [2015/49] | French: | PROCEDE ET APPAREIL PERMETTANT DE RÉGLER LES TEMPS DÉMISSION | [2015/49] |
Former [2014/51] | VERFAHREN UND VORRICHTUNG ZUR ÜBERTRAGUNG EINER TIMING-EINSTELLUNG | ||
Former [2014/51] | METHOD AND APPARATUS FOR TRANSMIT TIMING ADJUSTMENT | ||
Former [2014/51] | PROCÉDÉ ET APPAREIL POUR L'AJUSTEMENT DU TIMING D'ÉMISSION | Entry into regional phase | 28.08.2014 | National basic fee paid | 28.08.2014 | Designation fee(s) paid | 28.08.2014 | Examination fee paid | Examination procedure | 05.12.2013 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 28.08.2014 | Amendment by applicant (claims and/or description) | 28.08.2014 | Examination requested [2014/51] | 26.11.2015 | Communication of intention to grant the patent | 06.04.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 03.05.2016 | Communication of intention to grant the patent | 13.09.2016 | Fee for grant paid | 13.09.2016 | Fee for publishing/printing paid | 13.09.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | EP16195600.8 / EP3139533 | EP22153196.5 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.11.2015 | Opposition(s) | 27.07.2017 | No opposition filed within time limit [2017/40] | Fees paid | Renewal fee | 18.08.2014 | Renewal fee patent year 03 | 29.06.2015 | Renewal fee patent year 04 | 27.06.2016 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.06.2012 | AL | 26.10.2016 | AT | 26.10.2016 | BE | 26.10.2016 | CY | 26.10.2016 | CZ | 26.10.2016 | EE | 26.10.2016 | ES | 26.10.2016 | FI | 26.10.2016 | HR | 26.10.2016 | LT | 26.10.2016 | LV | 26.10.2016 | MC | 26.10.2016 | MK | 26.10.2016 | PL | 26.10.2016 | RO | 26.10.2016 | RS | 26.10.2016 | SE | 26.10.2016 | SI | 26.10.2016 | SK | 26.10.2016 | SM | 26.10.2016 | TR | 26.10.2016 | BG | 26.01.2017 | NO | 26.01.2017 | GR | 27.01.2017 | IS | 26.02.2017 | PT | 27.02.2017 | IE | 20.06.2017 | LU | 20.06.2017 | MT | 20.06.2017 | CH | 30.06.2017 | LI | 30.06.2017 | [2020/34] |
Former [2020/15] | HU | 20.06.2012 | |
AT | 26.10.2016 | ||
BE | 26.10.2016 | ||
CY | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
MK | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
TR | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
IE | 20.06.2017 | ||
LU | 20.06.2017 | ||
MT | 20.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
Former [2019/51] | HU | 20.06.2012 | |
AT | 26.10.2016 | ||
BE | 26.10.2016 | ||
CY | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
MK | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
IE | 20.06.2017 | ||
LU | 20.06.2017 | ||
MT | 20.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
Former [2019/47] | HU | 20.06.2012 | |
AT | 26.10.2016 | ||
BE | 26.10.2016 | ||
CY | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
IE | 20.06.2017 | ||
LU | 20.06.2017 | ||
MT | 20.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
Former [2019/31] | HU | 20.06.2012 | |
AT | 26.10.2016 | ||
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
IE | 20.06.2017 | ||
LU | 20.06.2017 | ||
MT | 20.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
Former [2018/43] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
IE | 20.06.2017 | ||
LU | 20.06.2017 | ||
MT | 20.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
Former [2018/23] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
IE | 20.06.2017 | ||
LU | 20.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
Former [2018/21] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
LU | 20.06.2017 | ||
CH | 30.06.2017 | ||
LI | 30.06.2017 | ||
Former [2018/11] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
MC | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
Former [2017/52] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SI | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
Former [2017/38] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
BG | 26.01.2017 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
Former [2017/37] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SK | 26.10.2016 | ||
SM | 26.10.2016 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
Former [2017/36] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
EE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
PL | 26.10.2016 | ||
RO | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
SK | 26.10.2016 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
Former [2017/34] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
CZ | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
PL | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
Former [2017/26] | AT | 26.10.2016 | |
BE | 26.10.2016 | ||
ES | 26.10.2016 | ||
FI | 26.10.2016 | ||
HR | 26.10.2016 | ||
LT | 26.10.2016 | ||
LV | 26.10.2016 | ||
PL | 26.10.2016 | ||
RS | 26.10.2016 | ||
SE | 26.10.2016 | ||
NO | 26.01.2017 | ||
GR | 27.01.2017 | ||
IS | 26.02.2017 | ||
PT | 27.02.2017 | ||
Former [2017/12] | LV | 26.10.2016 | Cited in | International search | [I] - NEW POSTCOM, "Timing reference cell selection for TA group", 3GPP DRAFT; R2-115739_TIMING REFERENCE CELL SELECTION FOR TA GROUP, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111108), vol. RAN WG2, no. San Francisco, USA; 20111114 - 20111118, XP050564275 [I] 1-45 * section 2.2 * | [I] - CATT, "Timing Reference Change", 3GPP DRAFT; R2-120252, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120131), vol. RAN WG2, no. Dresden, Germany; 20120206 - 20120210, XP050565341 [I] 1-45 * the whole document * | [I] - HUAWEI, "Different Timing Advance Impact on Carrier Aggregation", 3GPP DRAFT; R2-095815 DIFFERENT TIMING ADVANCE IMPACT ON CARRIER AGGREGATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091012), no. Miyazaki; 20091012, XP050390299 [I] 1-45 * Section 2 * |