EP2673899 - APPARATUS AND METHOD FOR PERFORMING MEASUREMENT REPORT CONSIDERING IN-DEVICE COEXISTENCE INTERFERENCE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.03.2021 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 10.04.2020 | ||
Former | Grant of patent is intended Status updated on 06.01.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states GoldPeak Innovations Inc. Suite 806, Digital-ro 34-gil 55, Guro-gu Seoul / KR | [2017/34] |
Former [2017/15] | For all designated states Pantech Inc. Pantech Bldg. 179 Seongam-Ro Mapo-gu Seoul / KR | ||
Former [2013/51] | For all designated states Pantech Co., Ltd Pantech R&D Center I-2, DMC Sangam-dong Mapo-gu Seoul 121-270 / KR | Inventor(s) | 01 /
AHN, Jae Hyun Pantech Bldg. I-2 DMC Sangam-dong Mapo-gu Seoul 121-270 / KR | 02 /
KWON, Ki Bum Pantech Bldg. I-2 DMC Sangam-dong Mapo-gu Seoul 121-270 / KR | 03 /
JUNG, Myung Cheul Pantech Bldg. I-2 DMC Sangam-dong Mapo-gu Seoul 121-270 / KR | [2013/51] | Representative(s) | Schmitt-Nilson Schraud Waibel Wohlfrom Patentanwälte Partnerschaft mbB Pelkovenstraße 143 80992 München / DE | [N/P] |
Former [2020/20] | Weickmann & Weickmann PartmbB Richard-Strauss-Strasse 80 81679 München / DE | ||
Former [2013/51] | Jordan, Volker Otto Wilhelm, et al Weickmann & Weickmann Patentanwälte Postfach 860 820 81635 München / DE | Application number, filing date | 12744488.3 | 10.02.2012 | [2020/20] | WO2012KR01031 | Priority number, date | KR20110012590 | 12.02.2011 Original published format: KR 20110012590 | [2013/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012108733 | Date: | 16.08.2012 | Language: | EN | [2012/33] | Type: | A2 Application without search report | No.: | EP2673899 | Date: | 18.12.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.08.2012 takes the place of the publication of the European patent application. | [2013/51] | Type: | B1 Patent specification | No.: | EP2673899 | Date: | 13.05.2020 | Language: | EN | [2020/20] | Search report(s) | International search report - published on: | KR | 26.10.2012 | (Supplementary) European search report - dispatched on: | EP | 29.09.2017 | Classification | IPC: | H04B7/26, H04W24/10, H04B17/345, H04B17/373, H04B17/382, H04W24/02, H04W36/00 | [2017/44] | CPC: |
H04W36/0094 (EP,KR,US);
H04W24/10 (CN,KR,US);
H04W24/08 (CN,KR);
H04B17/345 (EP,KR,US);
H04B17/373 (EP,US);
H04B17/382 (EP,US);
H04J1/00 (US);
H04J3/00 (US);
H04W24/02 (EP,US);
H04W72/541 (KR)
(-)
|
Former IPC [2013/51] | H04B7/26, H04W24/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR DURCHFÜHRUNG VON MESSBERICHTEN UNTER BERÜCKSICHTIGUNG VORRICHTUNGSINTERNER KOEXISTENZSTÖRUNG | [2020/02] | English: | APPARATUS AND METHOD FOR PERFORMING MEASUREMENT REPORT CONSIDERING IN-DEVICE COEXISTENCE INTERFERENCE | [2013/51] | French: | APPAREIL ET PROCÉDÉ POUR EXÉCUTER UN RAPPORT DE MESURE TENANT COMPTE D'UNE INTERFÉRENCE COEXISTANT À L'INTÉRIEUR D'UN DISPOSITIF | [2020/02] |
Former [2013/51] | VORRICHTUNG UND VERFAHREN ZUR DURCHFÜHRUNG VON MESSBERICHTEN UNTER BERÜCKSICHTIGUNG VORRICHTUNGSINTERNER KOEXISTENZSTÖRUNGEN | ||
Former [2013/51] | APPAREIL ET PROCÉDÉ POUR EXÉCUTER UN RAPPORT DE MESURE TENANT COMPTE D'UN BROUILLAGE DE COEXISTENCE À L'INTÉRIEUR DE DISPOSITIFS | Entry into regional phase | 09.08.2013 | National basic fee paid | 09.08.2013 | Search fee paid | 09.08.2013 | Designation fee(s) paid | 09.08.2013 | Examination fee paid | Examination procedure | 09.08.2013 | Examination requested [2013/51] | 20.04.2018 | Amendment by applicant (claims and/or description) | 07.01.2020 | Communication of intention to grant the patent | 31.03.2020 | Fee for grant paid | 31.03.2020 | Fee for publishing/printing paid | 31.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.01.2020 | Opposition(s) | 16.02.2021 | No opposition filed within time limit [2021/16] | Fees paid | Renewal fee | 12.12.2013 | Renewal fee patent year 03 | 30.01.2015 | Renewal fee patent year 04 | 29.01.2016 | Renewal fee patent year 05 | 28.02.2017 | Renewal fee patent year 06 | 28.02.2018 | Renewal fee patent year 07 | 28.02.2019 | Renewal fee patent year 08 | 31.12.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Stay/Interruption | 17.03.2016 | Interruption of proceedings. Reason: legal prevention of applicant | [2016/47] | 01.03.2017 | Resumption of proceedings | [2017/06] | 17.03.2016 | Interruption of proceedings. Reason: legal prevention of applicant | [2017/06] | Lapses during opposition Tooltip | HU | 10.02.2012 | AL | 13.05.2020 | AT | 13.05.2020 | CY | 13.05.2020 | CZ | 13.05.2020 | DK | 13.05.2020 | EE | 13.05.2020 | ES | 13.05.2020 | FI | 13.05.2020 | HR | 13.05.2020 | IT | 13.05.2020 | LT | 13.05.2020 | LV | 13.05.2020 | MC | 13.05.2020 | MK | 13.05.2020 | NL | 13.05.2020 | PL | 13.05.2020 | RO | 13.05.2020 | RS | 13.05.2020 | SE | 13.05.2020 | SI | 13.05.2020 | SK | 13.05.2020 | SM | 13.05.2020 | TR | 13.05.2020 | BG | 13.08.2020 | NO | 13.08.2020 | GR | 14.08.2020 | IS | 13.09.2020 | PT | 14.09.2020 | IE | 10.02.2021 | LU | 10.02.2021 | [2024/29] |
Former [2024/22] | HU | 10.02.2012 | |
AL | 13.05.2020 | ||
AT | 13.05.2020 | ||
CY | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
MK | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
IE | 10.02.2021 | ||
LU | 10.02.2021 | ||
Former [2023/27] | HU | 10.02.2012 | |
AL | 13.05.2020 | ||
AT | 13.05.2020 | ||
CY | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
IE | 10.02.2021 | ||
LU | 10.02.2021 | ||
Former [2023/24] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CY | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
IE | 10.02.2021 | ||
LU | 10.02.2021 | ||
Former [2022/07] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
IE | 10.02.2021 | ||
LU | 10.02.2021 | ||
Former [2021/47] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
LU | 10.02.2021 | ||
Former [2021/41] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/24] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/10] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/09] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/08] | AL | 13.05.2020 | |
DK | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/04] | AL | 13.05.2020 | |
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/01] | FI | 13.05.2020 | |
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/51] | FI | 13.05.2020 | |
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/50] | FI | 13.05.2020 | |
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
SE | 13.05.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/48] | FI | 13.05.2020 | |
LT | 13.05.2020 | ||
SE | 13.05.2020 | ||
NO | 13.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/47] | LT | 13.05.2020 | |
NO | 13.08.2020 | ||
IS | 13.09.2020 | ||
Former [2020/46] | IS | 13.09.2020 |