EP2736598 - APPARATUS AND METHOD FOR GENERATING X-RAY RADIATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.11.2019 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 23.11.2018 | ||
Former | Grant of patent is intended Status updated on 12.07.2018 | ||
Former | Examination is in progress Status updated on 11.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Carl Zeiss Meditec AG Carl-Zeiss-Staße 22 73447 Oberkochen / DE | [2014/23] | Inventor(s) | 01 /
WEIGAND, Frank Heilbronner Straße 89 89522 Heidenheim / DE | [2014/23] | Representative(s) | Müller & Schubert Patentanwälte Innere Wiener Straße 13 81667 München / DE | [2014/23] | Application number, filing date | 12753668.8 | 24.07.2012 | [2018/52] | WO2012EP64509 | Priority number, date | DE201110108508 | 25.07.2011 Original published format: DE102011108508 | US201161572940P | 25.07.2011 Original published format: US 201161572940 P | [2014/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013014161 | Date: | 31.01.2013 | Language: | EN | [2013/05] | Type: | A1 Application with search report | No.: | EP2736598 | Date: | 04.06.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.01.2013 takes the place of the publication of the European patent application. | [2014/23] | Type: | B1 Patent specification | No.: | EP2736598 | Date: | 26.12.2018 | Language: | EN | [2018/52] | Search report(s) | International search report - published on: | EP | 31.01.2013 | Classification | IPC: | A61N5/10, H01J35/14, H01J35/30, H01J35/32 | [2014/23] | CPC: |
A61N5/1001 (EP,US);
H01J35/153 (EP,US);
H01J35/30 (EP,US);
H01J35/32 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/23] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR ERZEUGUNG EINER RÖNTGENSTRAHLUNG | [2014/23] | English: | APPARATUS AND METHOD FOR GENERATING X-RAY RADIATION | [2014/23] | French: | APPAREIL ET PROCÉDÉ DE GÉNÉRATION DE RAYONS X | [2014/23] | Entry into regional phase | 18.02.2014 | National basic fee paid | 18.02.2014 | Designation fee(s) paid | 18.02.2014 | Examination fee paid | Examination procedure | 18.02.2014 | Examination requested [2014/23] | 24.04.2014 | Amendment by applicant (claims and/or description) | 19.11.2015 | Despatch of a communication from the examining division (Time limit: M06) | 11.05.2016 | Reply to a communication from the examining division | 14.10.2016 | Despatch of a communication from the examining division (Time limit: M06) | 24.03.2017 | Reply to a communication from the examining division | 16.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 07.02.2018 | Reply to a communication from the examining division | 13.07.2018 | Communication of intention to grant the patent | 19.11.2018 | Fee for grant paid | 19.11.2018 | Fee for publishing/printing paid | 19.11.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.11.2015 | Opposition(s) | 27.09.2019 | No opposition filed within time limit [2019/49] | Fees paid | Renewal fee | 23.07.2014 | Renewal fee patent year 03 | 23.07.2015 | Renewal fee patent year 04 | 22.07.2016 | Renewal fee patent year 05 | 24.07.2017 | Renewal fee patent year 06 | 27.07.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.07.2012 | AL | 26.12.2018 | AT | 26.12.2018 | CY | 26.12.2018 | CZ | 26.12.2018 | DK | 26.12.2018 | EE | 26.12.2018 | FI | 26.12.2018 | HR | 26.12.2018 | LT | 26.12.2018 | LV | 26.12.2018 | MC | 26.12.2018 | MK | 26.12.2018 | MT | 26.12.2018 | NL | 26.12.2018 | PL | 26.12.2018 | RO | 26.12.2018 | RS | 26.12.2018 | SE | 26.12.2018 | SI | 26.12.2018 | SK | 26.12.2018 | SM | 26.12.2018 | TR | 26.12.2018 | BG | 26.03.2019 | NO | 26.03.2019 | GR | 27.03.2019 | IS | 26.04.2019 | PT | 26.04.2019 | IE | 24.07.2019 | LU | 24.07.2019 | BE | 31.07.2019 | CH | 31.07.2019 | LI | 31.07.2019 | [2022/31] |
Former [2021/34] | HU | 24.07.2012 | |
AL | 26.12.2018 | ||
AT | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
MT | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 24.07.2019 | ||
LU | 24.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2021/32] | HU | 24.07.2012 | |
AL | 26.12.2018 | ||
AT | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 24.07.2019 | ||
LU | 24.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2021/26] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 24.07.2019 | ||
LU | 24.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2020/36] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 24.07.2019 | ||
LU | 24.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2020/25] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
LU | 24.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2020/17] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/14] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/13] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/48] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/46] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/39] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/37] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/35] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/33] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/30] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/26] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/25] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/24] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/23] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/22] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/21] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
NO | 26.03.2019 | ||
Former [2019/20] | LT | 26.12.2018 | |
NO | 26.03.2019 | Cited in | International search | [XI]FR2534066 (THOMSON CSF [FR]) [X] 1-6,8,10-12,14,15 * page 5, lines 28-34 * [I] 9; | [X]WO9504501 (PHOTOELECTRON CORP [US]) [X] 1,3-8,10-13,15 * page 27, lines 1-6 * * page 28, lines 1-4 * * page 18, line 23 - page 19, line 1 * | Examination | EP0466956 | US2008137805 | WO2006057744 | DE102008041286 | by applicant | WO2009132799 |