EP2665854 - SHOCK ABSORBER HAVING AN IMPROVED FRICTION ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.09.2016 Database last updated on 20.07.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Aksistem Elektromekanik Sanayi ve Ticaret Ltd. Sti. Gebze Organize Sanayi Bölgesi Ihsan Dede cad. No: 119 Gebze 41480 Kocaeli / TR | [2013/48] | Inventor(s) | 01 /
KANIÖZ, Adil c/o Aksistem Elektromekanik Sanayi ve Ticaret Ltd. Sti. Gebze Organize Sanayi Bölgesi Ihsan Dede cad. No. 119 Gebze 41480 Kocaeli / TR | [2013/48] | Representative(s) | Sevinç, Erkan Istanbul Patent A.S. Plaza-33, Büyükdere Cad. No: 33/16 Sisli 34381 Istanbul / TR | [2015/48] |
Former [2013/48] | Sevinç, Erkan Istanbul Patent & Trademark Consultancy Ltd. Plaza 33, Buyukdere Cad. No: 33/16 Sisli 34381 Istanbul / TR | Application number, filing date | 12756666.9 | 12.07.2012 | [2015/48] | WO2012EP63732 | Priority number, date | EP20110174761 | 20.07.2011 Original published format: EP 11174761 | [2013/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2013010921 | Date: | 24.01.2013 | Language: | EN | [2013/04] | Type: | A2 Application without search report | No.: | EP2665854 | Date: | 27.11.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.01.2013 takes the place of the publication of the European patent application. | [2013/48] | Type: | B1 Patent specification | No.: | EP2665854 | Date: | 25.11.2015 | Language: | EN | [2015/48] | Search report(s) | International search report - published on: | EP | 04.04.2013 | Classification | IPC: | D06F37/20, F16F7/09 | [2013/48] | CPC: |
F16F7/09 (EP,CN,KR,US);
D06F37/20 (EP,CN,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | STOSSDÄMPFER MIT VERBESSERTEM REIBUNGSELEMENT | [2013/48] | English: | SHOCK ABSORBER HAVING AN IMPROVED FRICTION ELEMENT | [2013/48] | French: | ABSORBEUR DE CHOCS AYANT UN ÉLÉMENT DE FROTTEMENT AMÉLIORÉ | [2015/36] |
Former [2013/48] | ABSORBEUR DE CHOCS AYANT UN ÉLÉMENT DE FROTTEMENT AMÉLIORÉ | Entry into regional phase | 18.07.2013 | National basic fee paid | 18.07.2013 | Designation fee(s) paid | 18.07.2013 | Examination fee paid | Examination procedure | 18.07.2013 | Examination requested [2013/48] | 14.11.2013 | Amendment by applicant (claims and/or description) | 11.06.2014 | Despatch of a communication from the examining division (Time limit: M04) | 21.10.2014 | Reply to a communication from the examining division | 23.01.2015 | Communication of intention to grant the patent | 19.02.2015 | Fee for grant paid | 19.02.2015 | Fee for publishing/printing paid | 19.02.2015 | Receipt of the translation of the claim(s) | 19.02.2015 | Observations by third parties | 05.03.2015 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 13.03.2015 | Despatch of a communication from the examining division (Time limit: M04) | 18.05.2015 | Reply to a communication from the examining division | 07.07.2015 | Observations by third parties | 25.08.2015 | Communication of intention to grant the patent | 02.09.2015 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 18.09.2015 | Communication of intention to grant the patent | 07.10.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | EP13192962.2 / EP2725130 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.06.2014 | Opposition(s) | 26.08.2016 | No opposition filed within time limit [2016/44] | Fees paid | Renewal fee | 24.07.2014 | Renewal fee patent year 03 | 17.06.2015 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.07.2012 | AL | 25.11.2015 | AT | 25.11.2015 | BE | 25.11.2015 | BG | 25.11.2015 | CY | 25.11.2015 | CZ | 25.11.2015 | DK | 25.11.2015 | EE | 25.11.2015 | FI | 25.11.2015 | HR | 25.11.2015 | LT | 25.11.2015 | LV | 25.11.2015 | MC | 25.11.2015 | MK | 25.11.2015 | NL | 25.11.2015 | RO | 25.11.2015 | RS | 25.11.2015 | SE | 25.11.2015 | SM | 25.11.2015 | NO | 25.02.2016 | GR | 26.02.2016 | IS | 25.03.2016 | PT | 25.03.2016 | GB | 12.07.2016 | IE | 12.07.2016 | LU | 12.07.2016 | CH | 31.07.2016 | LI | 31.07.2016 | MT | 31.07.2016 | FR | 01.08.2016 | [2018/46] |
Former [2018/38] | HU | 12.07.2012 | |
AT | 25.11.2015 | ||
BE | 25.11.2015 | ||
BG | 25.11.2015 | ||
CY | 25.11.2015 | ||
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
MC | 25.11.2015 | ||
MK | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
GB | 12.07.2016 | ||
IE | 12.07.2016 | ||
LU | 12.07.2016 | ||
CH | 31.07.2016 | ||
LI | 31.07.2016 | ||
MT | 31.07.2016 | ||
FR | 01.08.2016 | ||
Former [2018/31] | HU | 12.07.2012 | |
AT | 25.11.2015 | ||
BE | 25.11.2015 | ||
CY | 25.11.2015 | ||
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
MC | 25.11.2015 | ||
MK | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
GB | 12.07.2016 | ||
IE | 12.07.2016 | ||
LU | 12.07.2016 | ||
CH | 31.07.2016 | ||
LI | 31.07.2016 | ||
MT | 31.07.2016 | ||
FR | 01.08.2016 | ||
Former [2018/28] | HU | 12.07.2012 | |
AT | 25.11.2015 | ||
BE | 25.11.2015 | ||
CY | 25.11.2015 | ||
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
MC | 25.11.2015 | ||
MK | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
GB | 12.07.2016 | ||
IE | 12.07.2016 | ||
LU | 12.07.2016 | ||
CH | 31.07.2016 | ||
LI | 31.07.2016 | ||
FR | 01.08.2016 | ||
Former [2017/36] | AT | 25.11.2015 | |
BE | 25.11.2015 | ||
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
MC | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
GB | 12.07.2016 | ||
IE | 12.07.2016 | ||
LU | 12.07.2016 | ||
CH | 31.07.2016 | ||
LI | 31.07.2016 | ||
FR | 01.08.2016 | ||
Former [2017/25] | AT | 25.11.2015 | |
BE | 25.11.2015 | ||
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
MC | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
GB | 12.07.2016 | ||
CH | 31.07.2016 | ||
LI | 31.07.2016 | ||
FR | 01.08.2016 | ||
Former [2017/22] | AT | 25.11.2015 | |
BE | 25.11.2015 | ||
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
MC | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
CH | 31.07.2016 | ||
LI | 31.07.2016 | ||
FR | 01.08.2016 | ||
Former [2017/03] | AT | 25.11.2015 | |
BE | 25.11.2015 | ||
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
Former [2016/39] | AT | 25.11.2015 | |
CZ | 25.11.2015 | ||
DK | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
Former [2016/38] | AT | 25.11.2015 | |
CZ | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
SM | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
Former [2016/36] | AT | 25.11.2015 | |
CZ | 25.11.2015 | ||
EE | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
NL | 25.11.2015 | ||
RO | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
Former [2016/34] | AT | 25.11.2015 | |
CZ | 25.11.2015 | ||
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
NL | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
Former [2016/25] | AT | 25.11.2015 | |
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
LV | 25.11.2015 | ||
NL | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
Former [2016/24] | AT | 25.11.2015 | |
FI | 25.11.2015 | ||
HR | 25.11.2015 | ||
LT | 25.11.2015 | ||
NL | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
NO | 25.02.2016 | ||
GR | 26.02.2016 | ||
IS | 25.03.2016 | ||
PT | 25.03.2016 | ||
Former [2016/23] | HR | 25.11.2015 | |
LT | 25.11.2015 | ||
NL | 25.11.2015 | ||
RS | 25.11.2015 | ||
SE | 25.11.2015 | ||
NO | 25.02.2016 | ||
IS | 25.03.2016 | ||
Former [2016/22] | LT | 25.11.2015 | |
NL | 25.11.2015 | ||
NO | 25.02.2016 | ||
IS | 25.03.2016 | ||
Former [2016/21] | LT | 25.11.2015 | |
NO | 25.02.2016 | ||
Former [2016/20] | LT | 25.11.2015 | Cited in | International search | [XYI]EP1637640 (SUSPA HOLDING GMBH [DE]) [X] 1,2,6,8,10 * paragraphs [0025] - [0027]; figures 1,3,9,10,11,13 * [Y] 9 [I] 3-5,11,12; | [Y]KR20080086168 (MANDO CORP [KR]) [Y] 9 * figures 1,3a,3b *; | [A]US5224413 (HERNER RAY H [US]) [A] 1,10,12 * column 4, lines 33-60; figure 5 *; | [A]WO9826194 (CIMA COMP IT MOLLE ACCIAIO [IT], et al) [A] 1 * page 6, line 20 - page 8, line 11; figures 1,2,6 *; | [A]US3913460 (WRIGHT LEE A) [A] 1,10 * figures 3,5 *; | [A]EP1455011 (LG ELECTRONICS INC [KR]) [A] 1 * figure 3 *; | [A]DE4014166 (AKO WERKE GMBH & CO [DE]) [A] 1 * figure 1 *; | [A]EP0301190 (BAUER FRITZ & SOEHNE OHG [DE]) [A] 1 * figure 3 * | by applicant | EP1637640 | WO9826194 | other | WO2010103349 | DE10325730 | US2984529 | EP1862694 |