EP2853140 - INTERCONNECTION SUBSTRATE AND METHOD OF MANUFACTURING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.06.2021 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 26.06.2020 | ||
Former | Grant of patent is intended Status updated on 26.02.2020 | ||
Former | Examination is in progress Status updated on 01.06.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Linxens Holding Immeuble Crystal 6, rue Hélène Boucher 78280 Guyancourt / FR | [2015/14] | Inventor(s) | 01 /
LECHLEITER, François 9 rue de Mantes F-78200 Favrieux / FR | [2015/14] | Representative(s) | Regi, François-Xavier, et al Innovation Competence Group 310, avenue Berthelot 69008 Lyon / FR | [2015/14] | Application number, filing date | 12761806.4 | 21.05.2012 | [2020/31] | WO2012IB01596 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013175261 | Date: | 28.11.2013 | Language: | EN | [2013/48] | Type: | A1 Application with search report | No.: | EP2853140 | Date: | 01.04.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.11.2013 takes the place of the publication of the European patent application. | [2015/14] | Type: | B1 Patent specification | No.: | EP2853140 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Search report(s) | International search report - published on: | EP | 28.11.2013 | Classification | IPC: | H05K1/02 | [2015/14] | CPC: |
H05K1/0287 (EP);
H05K2201/0394 (EP);
H05K2201/0397 (EP);
H05K2201/10106 (EP);
H05K2203/175 (EP);
H05K3/242 (EP);
H05K3/4092 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/14] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERBINDUNGSSUBSTRAT UND VERFAHREN ZUR HERSTELLUNG DAVON | [2015/14] | English: | INTERCONNECTION SUBSTRATE AND METHOD OF MANUFACTURING THE SAME | [2015/14] | French: | SUBSTRAT D'INTERCONNEXION ET SON PROCÉDÉ DE FABRICATION | [2015/14] | Entry into regional phase | 10.12.2014 | National basic fee paid | 10.12.2014 | Designation fee(s) paid | 10.12.2014 | Examination fee paid | Examination procedure | 10.12.2014 | Examination requested [2015/14] | 31.07.2015 | Amendment by applicant (claims and/or description) | 05.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 26.09.2019 | Reply to a communication from the examining division | 29.10.2019 | Despatch of a communication from the examining division (Time limit: M01) | 29.11.2019 | Reply to a communication from the examining division | 27.02.2020 | Communication of intention to grant the patent | 22.06.2020 | Fee for grant paid | 22.06.2020 | Fee for publishing/printing paid | 22.06.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.06.2019 | Opposition(s) | 30.04.2021 | No opposition filed within time limit [2021/27] | Fees paid | Renewal fee | 10.12.2014 | Renewal fee patent year 03 | 28.05.2015 | Renewal fee patent year 04 | 26.05.2016 | Renewal fee patent year 05 | 24.05.2017 | Renewal fee patent year 06 | 25.05.2018 | Renewal fee patent year 07 | 21.05.2019 | Renewal fee patent year 08 | 19.05.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.05.2012 | AL | 29.07.2020 | CY | 29.07.2020 | CZ | 29.07.2020 | DK | 29.07.2020 | EE | 29.07.2020 | ES | 29.07.2020 | FI | 29.07.2020 | HR | 29.07.2020 | IT | 29.07.2020 | LT | 29.07.2020 | LV | 29.07.2020 | MC | 29.07.2020 | MK | 29.07.2020 | MT | 29.07.2020 | PL | 29.07.2020 | RO | 29.07.2020 | RS | 29.07.2020 | SE | 29.07.2020 | SI | 29.07.2020 | SK | 29.07.2020 | SM | 29.07.2020 | TR | 29.07.2020 | BG | 29.10.2020 | NO | 29.10.2020 | GR | 30.10.2020 | IS | 29.11.2020 | PT | 30.11.2020 | [2024/41] |
Former [2024/29] | HU | 21.05.2012 | |
AL | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
TR | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2024/22] | HU | 21.05.2012 | |
AL | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2023/29] | HU | 21.05.2012 | |
AL | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2023/24] | AL | 29.07.2020 | |
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2022/07] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/36] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/28] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/25] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/23] | CZ | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/22] | CZ | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/20] | DK | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/10] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/09] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/08] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/07] | FI | 29.07.2020 | |
LT | 29.07.2020 | ||
NO | 29.10.2020 | Cited in | International search | [A]GB1581595 (WESTFAELISCHE METALL INDUSTRIE) [A] 1-10 * the whole document *; | [A]US5112230 (DESIMONE MICHAEL J [US]) [A] 1-10* the whole document *; | [A]US2003037961 (POWERS DIRK [US]) [A] 1-10 * the whole document *; | [Y]WO03026010 (NAGRAID SA [CH], et al) [Y] 1-10 * page 6, line 16 - page 7, line 27; figures 1-6 *; | [Y]US2008142071 (DORN RANDY [US], et al) [Y] 1-10 * paragraphs [0016] , [0017]; figures 1A-2B * * paragraph [0023] - paragraph [0036] * | by applicant | WO9844768 | EP2447596 | WO2011EP67941 |