blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2853140

EP2853140 - INTERCONNECTION SUBSTRATE AND METHOD OF MANUFACTURING THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.06.2021
Database last updated on 18.10.2024
FormerThe patent has been granted
Status updated on  26.06.2020
FormerGrant of patent is intended
Status updated on  26.02.2020
FormerExamination is in progress
Status updated on  01.06.2019
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Linxens Holding
Immeuble Crystal
6, rue Hélène Boucher
78280 Guyancourt / FR
[2015/14]
Inventor(s)01 / LECHLEITER, François
9 rue de Mantes
F-78200 Favrieux / FR
 [2015/14]
Representative(s)Regi, François-Xavier, et al
Innovation Competence Group
310, avenue Berthelot
69008 Lyon / FR
[2015/14]
Application number, filing date12761806.421.05.2012
[2020/31]
WO2012IB01596
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013175261
Date:28.11.2013
Language:EN
[2013/48]
Type: A1 Application with search report 
No.:EP2853140
Date:01.04.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 28.11.2013 takes the place of the publication of the European patent application.
[2015/14]
Type: B1 Patent specification 
No.:EP2853140
Date:29.07.2020
Language:EN
[2020/31]
Search report(s)International search report - published on:EP28.11.2013
ClassificationIPC:H05K1/02
[2015/14]
CPC:
H05K1/0287 (EP); H05K2201/0394 (EP); H05K2201/0397 (EP);
H05K2201/10106 (EP); H05K2203/175 (EP); H05K3/242 (EP);
H05K3/4092 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/14]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERBINDUNGSSUBSTRAT UND VERFAHREN ZUR HERSTELLUNG DAVON[2015/14]
English:INTERCONNECTION SUBSTRATE AND METHOD OF MANUFACTURING THE SAME[2015/14]
French:SUBSTRAT D'INTERCONNEXION ET SON PROCÉDÉ DE FABRICATION[2015/14]
Entry into regional phase10.12.2014National basic fee paid 
10.12.2014Designation fee(s) paid 
10.12.2014Examination fee paid 
Examination procedure10.12.2014Examination requested  [2015/14]
31.07.2015Amendment by applicant (claims and/or description)
05.06.2019Despatch of a communication from the examining division (Time limit: M04)
26.09.2019Reply to a communication from the examining division
29.10.2019Despatch of a communication from the examining division (Time limit: M01)
29.11.2019Reply to a communication from the examining division
27.02.2020Communication of intention to grant the patent
22.06.2020Fee for grant paid
22.06.2020Fee for publishing/printing paid
22.06.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.06.2019
Opposition(s)30.04.2021No opposition filed within time limit [2021/27]
Fees paidRenewal fee
10.12.2014Renewal fee patent year 03
28.05.2015Renewal fee patent year 04
26.05.2016Renewal fee patent year 05
24.05.2017Renewal fee patent year 06
25.05.2018Renewal fee patent year 07
21.05.2019Renewal fee patent year 08
19.05.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.05.2012
AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
MT29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
[2024/41]
Former [2024/29]HU21.05.2012
AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2024/22]HU21.05.2012
AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2023/29]HU21.05.2012
AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2023/24]AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2022/07]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/36]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/28]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/25]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/23]CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/22]CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/20]DK29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/10]ES29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/09]ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
Former [2021/08]ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
PT30.11.2020
Former [2021/07]FI29.07.2020
LT29.07.2020
NO29.10.2020
Cited inInternational search[A]GB1581595  (WESTFAELISCHE METALL INDUSTRIE) [A] 1-10 * the whole document *;
 [A]US5112230  (DESIMONE MICHAEL J [US]) [A] 1-10* the whole document *;
 [A]US2003037961  (POWERS DIRK [US]) [A] 1-10 * the whole document *;
 [Y]WO03026010  (NAGRAID SA [CH], et al) [Y] 1-10 * page 6, line 16 - page 7, line 27; figures 1-6 *;
 [Y]US2008142071  (DORN RANDY [US], et al) [Y] 1-10 * paragraphs [0016] , [0017]; figures 1A-2B * * paragraph [0023] - paragraph [0036] *
by applicantWO9844768
 EP2447596
 WO2011EP67941
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.