EP2766680 - A COOLING DEVICE COMPRISING A SHELF THE HEIGHT OF WHICH CAN BE ADJUSTED [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.03.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 09.04.2021 | ||
Former | Grant of patent is intended Status updated on 02.02.2021 | ||
Former | Examination is in progress Status updated on 14.12.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Arçelik Anonim Sirketi Sutluce Karaagac Caddesi No: 2/6 Beyoglu 34445 Istanbul / TR | [2019/27] |
Former [2014/34] | For all designated states Arçelik Anonim Sirketi E5 Ankara Asfalti Uzeri Tuzla 34950 Istanbul / TR | Inventor(s) | 01 /
Celik, Kadir Ridvan E5 Ankara Asfalti Uzeri Tuzla, 34950 Istanbul / TR | 02 /
Ozyuksel, Faik Emre E5 Ankara Asfalti Uzeri Tuzla, 34950 Istanbul / TR | 03 /
Altay, Elif E5 Ankara Asfalti Uzeri Tuzla, 34950 Istanbul / TR | 04 /
Akyuz, Ercan E5 Ankara Asfalti Uzeri Tuzla, 34950 Istanbul / TR | [2014/34] | Application number, filing date | 12766947.1 | 21.09.2012 | [2021/19] | WO2012EP68653 | Priority number, date | TR20110009284 | 21.09.2011 Original published format: TR 201109284 | [2014/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2013041679 | Date: | 28.03.2013 | Language: | EN | [2013/13] | Type: | A2 Application without search report | No.: | EP2766680 | Date: | 20.08.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.03.2013 takes the place of the publication of the European patent application. | [2014/34] | Type: | B1 Patent specification | No.: | EP2766680 | Date: | 12.05.2021 | Language: | EN | [2021/19] | Search report(s) | International search report - published on: | EP | 27.06.2013 | Classification | IPC: | F25D25/02, F25D23/06, A47B57/06, A47F3/06, A47B96/06 | [2021/05] | CPC: |
F25D25/02 (EP);
A47B57/06 (EP);
A47B96/063 (EP);
A47F3/06 (EP);
F25D23/067 (EP);
F25D25/04 (EP)
|
Former IPC [2014/34] | F25D23/06, A47B57/06, F25D25/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/34] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KÜHLVORRICHTUNG MIT EINEM REGAL MIT VERSTELLBARER HÖHE | [2014/34] | English: | A COOLING DEVICE COMPRISING A SHELF THE HEIGHT OF WHICH CAN BE ADJUSTED | [2014/34] | French: | DISPOSITIF DE REFROIDISSEMENT COMPRENANT UNE CLAYETTE DONT LA HAUTEUR PEUT ÊTRE RÉGLÉE | [2014/34] | Entry into regional phase | 19.03.2014 | National basic fee paid | 19.03.2014 | Designation fee(s) paid | 19.03.2014 | Examination fee paid | Examination procedure | 19.03.2014 | Examination requested [2014/34] | 30.01.2015 | Amendment by applicant (claims and/or description) | 17.12.2018 | Despatch of a communication from the examining division (Time limit: M06) | 24.06.2019 | Reply to a communication from the examining division | 03.02.2021 | Communication of intention to grant the patent | 29.03.2021 | Fee for grant paid | 29.03.2021 | Fee for publishing/printing paid | 29.03.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.12.2018 | Opposition(s) | 15.02.2022 | No opposition filed within time limit [2022/16] | Fees paid | Renewal fee | 30.09.2014 | Renewal fee patent year 03 | 17.09.2015 | Renewal fee patent year 04 | 29.09.2016 | Renewal fee patent year 05 | 22.09.2017 | Renewal fee patent year 06 | 26.09.2018 | Renewal fee patent year 07 | 24.09.2019 | Renewal fee patent year 08 | 30.09.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.09.2012 | AL | 12.05.2021 | AT | 12.05.2021 | CY | 12.05.2021 | CZ | 12.05.2021 | DK | 12.05.2021 | EE | 12.05.2021 | ES | 12.05.2021 | FI | 12.05.2021 | HR | 12.05.2021 | IT | 12.05.2021 | LT | 12.05.2021 | LV | 12.05.2021 | MC | 12.05.2021 | MK | 12.05.2021 | NL | 12.05.2021 | RO | 12.05.2021 | RS | 12.05.2021 | SE | 12.05.2021 | SI | 12.05.2021 | SK | 12.05.2021 | SM | 12.05.2021 | BG | 12.08.2021 | NO | 12.08.2021 | GR | 13.08.2021 | IS | 12.09.2021 | PT | 13.09.2021 | IE | 21.09.2021 | LU | 21.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | FR | 30.09.2021 | LI | 30.09.2021 | [2024/22] |
Former [2023/29] | HU | 21.09.2012 | |
AL | 12.05.2021 | ||
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/24] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/36] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/35] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/34] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
LU | 21.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/29] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/25] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/23] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/10] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/08] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/07] | AT | 12.05.2021 | |
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/04] | AT | 12.05.2021 | |
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/51] | AT | 12.05.2021 | |
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/50] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
Former [2021/49] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
Former [2021/47] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
LT | 12.05.2021 | ||
BG | 12.08.2021 | ||
Former [2021/46] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
LT | 12.05.2021 | Cited in | International search | [X]JPH09250870 (TOSHIBA CORP) [X] 1-5,12-14 * abstract * * figures 1-6 *; | [A]EP1563762 (ITW IND COMPONENTS SRL [IT]) [A] 1-15 * the whole document *; | [X]US2008203041 (LIM JAE HOON [KR], et al) [X] 1,9-11,13,15 * abstract * * figures 1-5 *; | [A]DE102008016861 (BSH BOSCH SIEMENS HAUSGERAETE [DE]) [A] 1-15 * the whole document *; | [XI]TR201005608 (VESTEL BEYAZ ESYA SANAYI VE TICARET ANONIM SIRKETI [TR]) [X] 1,3,4,13,14 * figures 2-8 * [I] 5; | [AD]US2011031863 (BENITSCH ROLAND [DE], et al) [AD] 1,5-8* the whole document * | by applicant | US3516369 | WO03095912 | EP1703238 | US2011031863 |