EP2696580 - DATA RETRIEVAL DEVICE, DATA RETRIEVAL METHOD, AND PROGRAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 09.09.2020 | ||
Former | Examination is in progress Status updated on 13.04.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Saturn Licensing LLC 25 Madison Avenue New York, NY 10022-3211 / US | [2017/48] |
Former [2014/07] | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | Inventor(s) | 01 /
OKADA Satoshi c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | 02 /
YOKOKAWA Takashi c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2014/07] | Representative(s) | D Young & Co LLP 3 Noble Street London EC2V 7BQ / GB | [N/P] |
Former [2021/07] | D Young & Co LLP 120 Holborn London EC1N 2DY / GB | ||
Former [2014/07] | Malden, Nicholas D Young & Co LLP 120 Holborn London EC1N 2DY / GB | Application number, filing date | 12768031.2 | 23.03.2012 | [2021/07] | WO2012JP57536 | Priority number, date | JP20110086305 | 08.04.2011 Original published format: JP 2011086305 | [2014/07] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012137612 | Date: | 11.10.2012 | Language: | JA | [2012/41] | Type: | A1 Application with search report | No.: | EP2696580 | Date: | 12.02.2014 | Language: | EN | [2014/07] | Type: | B1 Patent specification | No.: | EP2696580 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Search report(s) | International search report - published on: | JP | 11.10.2012 | (Supplementary) European search report - dispatched on: | EP | 30.07.2014 | Classification | IPC: | H04N7/173, H04B1/16, H04H60/13, H04J3/00, H04J11/00, H04N21/434, H04N21/61 | [2014/35] | CPC: |
H04N21/44004 (EP,US);
H04N19/44 (US);
H04N21/4344 (EP,US);
H04N21/4345 (EP,US);
H04N21/4347 (EP,US);
H04N21/6112 (EP,US);
|
Former IPC [2014/07] | H04N7/173, H04B1/16, H04H60/13, H04J3/00, H04J11/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | DATENABRUFVORRICHTUNG, DATENABRUFVERFAHREN UND PROGRAMM | [2014/07] | English: | DATA RETRIEVAL DEVICE, DATA RETRIEVAL METHOD, AND PROGRAM | [2014/07] | French: | DISPOSITIF DE RÉCUPÉRATION DE DONNÉES, PROCÉDÉ DE RÉCUPÉRATION DE DONNÉES ET PROGRAMME | [2014/07] | Entry into regional phase | 04.09.2013 | Translation filed | 04.09.2013 | National basic fee paid | 04.09.2013 | Search fee paid | 04.09.2013 | Designation fee(s) paid | 04.09.2013 | Examination fee paid | Examination procedure | 04.09.2013 | Examination requested [2014/07] | 11.02.2015 | Amendment by applicant (claims and/or description) | 27.10.2015 | Despatch of a communication from the examining division (Time limit: M04) | 23.02.2016 | Reply to a communication from the examining division | 05.04.2018 | Despatch of a communication from the examining division (Time limit: M06) | 04.10.2018 | Reply to a communication from the examining division | 14.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 25.02.2020 | Reply to a communication from the examining division | 09.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 17.08.2020 | Reply to a communication from the examining division | 10.09.2020 | Communication of intention to grant the patent | 31.12.2020 | Fee for grant paid | 31.12.2020 | Fee for publishing/printing paid | 31.12.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.10.2015 | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 21.03.2014 | Renewal fee patent year 03 | 24.03.2015 | Renewal fee patent year 04 | 25.03.2016 | Renewal fee patent year 05 | 10.03.2017 | Renewal fee patent year 06 | 13.03.2018 | Renewal fee patent year 07 | 22.03.2019 | Renewal fee patent year 08 | 27.03.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.03.2012 | AL | 17.02.2021 | AT | 17.02.2021 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | IT | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | MT | 17.02.2021 | NL | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | RS | 17.02.2021 | SE | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | TR | 17.02.2021 | IE | 23.03.2021 | LU | 23.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | [2024/41] |
Former [2024/29] | HU | 23.03.2012 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
MK | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
TR | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2024/22] | HU | 23.03.2012 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
MK | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2023/27] | HU | 23.03.2012 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2023/24] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/34] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/23] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/11] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/09] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 23.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/51] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/49] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/46] | AT | 17.02.2021 | |
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/39] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/38] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | FI | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | Documents cited: | Search | [A]EP0649259 (SONY CORP [JP]) [A] 1-5 * page 4, line 7 - page 5, line 53 ** figures 3-9 *; | [A]EP1850339 (SONY CORP [JP], et al) [A] 1-5 * abstract * * paragraph [0128] *; | [A]US2009185625 (LEE YUN-GU [KR], et al) [A] 1-5 * abstract * * figure 5 * * paragraph [0041] *; | [XI]US2011037904 (YOKOKAWA TAKASHI [JP], et al) [X] 1,2,4,5 * abstract * * figure 3 * * paragraphs [0154] , [ 155] , [ 160] * [I] 3 | International search | [X]JP2006186689 (TOSHIBA CORP); | [A]JP2009278186 (TOSHIBA CORP); | [X]JP2010041496 (SONY CORP); | [X]JP2011041098 (SONY CORP); | [A] - "Frame structure channel coding and modulationfor a second generation digital terrestrialtelevision broadcasting system (DVB-T2)", DVB PROJECT, (2008), pages 17 - 24,82,118-128, URL: http://www.dvb.org/technology/dvbt2/a122.tm3980r5.DVB-T2.pdf, (20120605), XP002545919 |