EP2774227 - WIRE POSITIONING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.08.2018 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 22.09.2017 | ||
Former | Grant of patent is intended Status updated on 22.06.2017 | ||
Former | Examination is in progress Status updated on 23.12.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Schleuniger Holding AG Bierigutstrasse 9 3608 Thun / CH | [2014/37] | Inventor(s) | 01 /
SCHÜTZ, Peter Ziegelstrasse 10 42719 Solingen / DE | [2014/37] | Representative(s) | PPR AG BGZ 9497 Triesenberg / LI | [N/P] |
Former [2014/37] | Patentbüro Paul Rosenich AG BGZ 9497 Triesenberg / LI | Application number, filing date | 12769736.5 | 14.08.2012 | [2017/43] | WO2012IB54137 | Priority number, date | US201161554765P | 02.11.2011 Original published format: US 201161554765 P | EP20110187480 | 02.11.2011 Original published format: EP 11187480 | [2014/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013064916 | Date: | 10.05.2013 | Language: | EN | [2013/19] | Type: | A1 Application with search report | No.: | EP2774227 | Date: | 10.09.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.05.2013 takes the place of the publication of the European patent application. | [2014/37] | Type: | B1 Patent specification | No.: | EP2774227 | Date: | 25.10.2017 | Language: | EN | [2017/43] | Search report(s) | International search report - published on: | EP | 10.05.2013 | Classification | IPC: | H01R43/052, H01R43/28 | [2014/37] | CPC: |
H01R43/052 (EP,US);
H01R43/28 (EP,US);
Y10T29/49185 (EP,US);
Y10T29/53235 (EP,US);
Y10T29/53261 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | DRAHTPOSITIONIERUNGSVORRICHTUNG | [2014/37] | English: | WIRE POSITIONING DEVICE | [2014/37] | French: | DISPOSITIF DE POSITIONNEMENT DE CABLE | [2017/29] |
Former [2014/37] | DISPOSITIF DE POSITIONNEMENT DE FIL | Entry into regional phase | 02.06.2014 | National basic fee paid | 02.06.2014 | Designation fee(s) paid | 02.06.2014 | Examination fee paid | Examination procedure | 02.06.2014 | Amendment by applicant (claims and/or description) | 02.06.2014 | Examination requested [2014/37] | 11.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 06.07.2016 | Reply to a communication from the examining division | 17.10.2016 | Despatch of a communication from the examining division (Time limit: M02) | 16.12.2016 | Reply to a communication from the examining division | 23.06.2017 | Communication of intention to grant the patent | 14.09.2017 | Fee for grant paid | 14.09.2017 | Fee for publishing/printing paid | 14.09.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.03.2016 | Opposition(s) | 26.07.2018 | No opposition filed within time limit [2018/40] | Fees paid | Renewal fee | 01.09.2014 | Renewal fee patent year 03 | 31.08.2015 | Renewal fee patent year 04 | 31.08.2016 | Renewal fee patent year 05 | 31.08.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 25.10.2017 | AT | 25.10.2017 | CY | 25.10.2017 | DK | 25.10.2017 | EE | 25.10.2017 | FI | 25.10.2017 | HR | 25.10.2017 | LT | 25.10.2017 | LV | 25.10.2017 | MC | 25.10.2017 | MK | 25.10.2017 | NL | 25.10.2017 | RS | 25.10.2017 | SE | 25.10.2017 | SI | 25.10.2017 | SK | 25.10.2017 | SM | 25.10.2017 | TR | 25.10.2017 | BG | 25.01.2018 | NO | 25.01.2018 | GR | 26.01.2018 | IS | 25.02.2018 | [2020/34] |
Former [2020/31] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
MK | 25.10.2017 | ||
NL | 25.10.2017 | ||
RS | 25.10.2017 | ||
SE | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
TR | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2020/16] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
NL | 25.10.2017 | ||
RS | 25.10.2017 | ||
SE | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
TR | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2019/15] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
NL | 25.10.2017 | ||
RS | 25.10.2017 | ||
SE | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/52] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
RS | 25.10.2017 | ||
SE | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/37] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
RS | 25.10.2017 | ||
SE | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/35] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
RS | 25.10.2017 | ||
SE | 25.10.2017 | ||
SK | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/24] | AT | 25.10.2017 | |
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
RS | 25.10.2017 | ||
SE | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/22] | FI | 25.10.2017 | |
LT | 25.10.2017 | ||
NL | 25.10.2017 | ||
NO | 25.01.2018 | ||
Former [2018/17] | NL | 25.10.2017 | Cited in | International search | [I]GB2021988 (ARTOS ENGINEERING CO) [I] 1-39 * figures 29-31 * * page 13, line 9 - page 13, line 17 *; | [I]US4521946 (DUSEL ROBERT O [US], et al) [I] 13-39 * figures 16,17 *; | [I]EP0813271 (MOLEX INC [US]) [I] 13-39 * figure 10 *; | [A]US3918330 (BLAHA GERALD E) [A] 1-39 * figure 9 * | Examination | EP2590275 | by applicant | WO2009017653 | WO2011004272 | GB2021988 | US4521946 | EP0813271 |