EP2751182 - PLASTICIZER FOR LOW TEMPERATURE UNWIND WITH WEIGHT RETENTION DURING HEAT AGING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.07.2016 Database last updated on 06.07.2024 | Most recent event Tooltip | 19.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 21.11.2018 [2018/47] | Applicant(s) | For all designated states Dow Global Technologies LLC 2040 Dow Center Midland, MI 48674 / US | [2014/28] | Inventor(s) | 01 /
LAUFER, Caroline, H. 11 Deer Run Millington, NJ 07946 / US | 02 /
EATON, Robert, F. 67 Mill Pond Road Belle Mead, NJ 08502 / US | 03 /
GHOSH-DASTIDAR, Abhijit 20 Gunpowder Drive East Brunswick, NJ 08816 / US | 04 /
MUNDRA, Manish 38 Oswestry Way Somerset, NJ 08873 / US | 05 /
CHAUDHARY, Bharat, I. 14 Michelle Court Princeton, NJ 08540 / US | 06 /
COGEN, Jeffrey, M. 6 Braintree Court Flemington, NJ 08822 / US | 07 /
FU, Lin 2373 Overlook Court Naperville, IL 60563 / US | [2014/28] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [N/P] |
Former [2014/28] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 12769795.1 | 13.09.2012 | [2015/35] | WO2012US55070 | Priority number, date | US201161541847P | 30.09.2011 Original published format: US 201161541847 P | [2014/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013048752 | Date: | 04.04.2013 | Language: | EN | [2013/14] | Type: | A1 Application with search report | No.: | EP2751182 | Date: | 09.07.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.04.2013 takes the place of the publication of the European patent application. | [2014/28] | Type: | B1 Patent specification | No.: | EP2751182 | Date: | 26.08.2015 | Language: | EN | [2015/35] | Search report(s) | International search report - published on: | EP | 04.04.2013 | Classification | IPC: | C08K5/00, C07D303/42 | [2014/28] | CPC: |
C08K5/0016 (EP,US);
C08K5/1515 (US);
C09D127/06 (EP,US);
H01B3/443 (EP,US);
C08K2201/014 (EP,US)
| C-Set: |
C08K5/0016, C08L27/06 (EP,US);
C09D127/06, C08K5/1515 (US,EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | WEICHMACHER FÜR EIN NIEDRIGTEMPERATURABWICKLUNGSSYSTEM MIT GEWICHTSBEIBEHALTUNG BEI WÄRMEALTERUNG | [2014/28] | English: | PLASTICIZER FOR LOW TEMPERATURE UNWIND WITH WEIGHT RETENTION DURING HEAT AGING | [2014/28] | French: | PLASTIFIANT RÉSISTANT AU DÉROULEMENT À BASSE TEMPÉRATURE AVEC RÉTENTION DU POIDS LORS DU VIEILLISSEMENT THERMIQUE | [2014/28] | Entry into regional phase | 03.03.2014 | National basic fee paid | 03.03.2014 | Designation fee(s) paid | 03.03.2014 | Examination fee paid | Examination procedure | 03.03.2014 | Examination requested [2014/28] | 15.10.2014 | Amendment by applicant (claims and/or description) | 12.03.2015 | Communication of intention to grant the patent | 16.07.2015 | Fee for grant paid | 16.07.2015 | Fee for publishing/printing paid | 16.07.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.03.2015 | Opposition(s) | 30.05.2016 | No opposition filed within time limit [2016/31] | Fees paid | Renewal fee | 12.09.2014 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.09.2012 | AL | 26.08.2015 | AT | 26.08.2015 | BE | 26.08.2015 | BG | 26.08.2015 | CY | 26.08.2015 | CZ | 26.08.2015 | DK | 26.08.2015 | EE | 26.08.2015 | ES | 26.08.2015 | FI | 26.08.2015 | HR | 26.08.2015 | LT | 26.08.2015 | LV | 26.08.2015 | MC | 26.08.2015 | MK | 26.08.2015 | MT | 26.08.2015 | NL | 26.08.2015 | PL | 26.08.2015 | RO | 26.08.2015 | RS | 26.08.2015 | SE | 26.08.2015 | SI | 26.08.2015 | SK | 26.08.2015 | SM | 26.08.2015 | TR | 26.08.2015 | IE | 13.09.2015 | LU | 13.09.2015 | CH | 30.09.2015 | LI | 30.09.2015 | NO | 26.11.2015 | GR | 27.11.2015 | IS | 26.12.2015 | PT | 28.12.2015 | [2018/47] |
Former [2018/31] | HU | 13.09.2012 | |
AT | 26.08.2015 | ||
BE | 26.08.2015 | ||
BG | 26.08.2015 | ||
CY | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
MK | 26.08.2015 | ||
MT | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
SM | 26.08.2015 | ||
TR | 26.08.2015 | ||
IE | 13.09.2015 | ||
LU | 13.09.2015 | ||
CH | 30.09.2015 | ||
LI | 30.09.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2018/02] | HU | 13.09.2012 | |
AT | 26.08.2015 | ||
BE | 26.08.2015 | ||
BG | 26.08.2015 | ||
CY | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
MT | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
SM | 26.08.2015 | ||
IE | 13.09.2015 | ||
LU | 13.09.2015 | ||
CH | 30.09.2015 | ||
LI | 30.09.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2017/39] | HU | 13.09.2012 | |
AT | 26.08.2015 | ||
BE | 26.08.2015 | ||
BG | 26.08.2015 | ||
CY | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
MT | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
SM | 26.08.2015 | ||
IE | 13.09.2015 | ||
CH | 30.09.2015 | ||
LI | 30.09.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2017/22] | AT | 26.08.2015 | |
BE | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
MT | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
IE | 13.09.2015 | ||
CH | 30.09.2015 | ||
LI | 30.09.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2017/03] | AT | 26.08.2015 | |
BE | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
IE | 13.09.2015 | ||
CH | 30.09.2015 | ||
LI | 30.09.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/36] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
IE | 13.09.2015 | ||
CH | 30.09.2015 | ||
LI | 30.09.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/33] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SK | 26.08.2015 | ||
IE | 13.09.2015 | ||
CH | 30.09.2015 | ||
LI | 30.09.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/26] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/23] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/22] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/20] | AT | 26.08.2015 | |
DK | 26.08.2015 | ||
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/14] | AT | 26.08.2015 | |
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
NL | 26.08.2015 | ||
PL | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/11] | AT | 26.08.2015 | |
ES | 26.08.2015 | ||
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/10] | ES | 26.08.2015 | |
FI | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
RS | 26.08.2015 | ||
SE | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/09] | FI | 26.08.2015 | |
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
Former [2016/08] | LT | 26.08.2015 | |
NO | 26.11.2015 | ||
Former [2016/07] | LT | 26.08.2015 | Cited in | International search | [Y]US3868341 (SAUER EARL SALVATOR, et al) [Y] 1-10 * column 9, line 48 - line 58 ** claims 1,9 *; | [Y]WO2009102877 (UNION CARBIDE CHEM PLASTIC [US], et al) [Y] 1-10 * claim - *; | [Y]US2011076502 (CHAUDHARY BHARAT I [US], et al) [Y] 1-10 * tables 7,8 * * claims 7,10,13,14,17 *; | [A]WO2011041372 (DOW GLOBAL TECHNOLOGIES LLC [US], et al) [A] 1-10 * example CS 3; table 4 * * claims 4-7,9,10 * |