| EP2697384 - METHOD FOR PRODUCING BUTYRIC ACID, BUTANOL AND BUTYRATE ESTER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.07.2018 Database last updated on 07.04.2026 | |
| Former | The patent has been granted Status updated on 28.07.2017 | ||
| Former | Grant of patent is intended Status updated on 15.03.2017 | ||
| Former | Examination is in progress Status updated on 18.01.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Industrial Technology Research Institute No. 195, Sec. 4 Chung Hsing Road Chutung, Hsinchu, 31040, Taiwan / CN | [2017/15] |
| Former [2014/08] | For all designated states Industrial Technology Research Institute No. 195 Sec. 4 Chung Hsing Rd. Chutung Hsinchu 31040 Taiwan / TW | Inventor(s) | 01 /
LIN, Yun-Huin 3F. No. 6 Lane 32 Nangang St. Xiangshan Dist. Hsinchu City Taiwan 300 / TW | 02 /
LEE, Hom-Ti 3F.-1, No. 275, Aikou 3rd St. Zhubei City, Hsinchu County 302 Taiwan (R.O.C.) / TW | 03 /
YIN, Hsiu-Yin 5F. No. 17 Lane 68 Xingyun St. Neihu Dist. Taipei City Taiwan 114 / TW | 04 /
HWANG, Sz-Chwun John No. 38 Alley 122 Lane 648 Minghu Rd. East Dist. Hsinchu City Taiwan 300 / TW | [2017/35] |
| Former [2014/08] | 01 /
LIN, Yun-Huin 3F. No. 6 Lane 32 Nangang St. Xiangshan Dist. Hsinchu City Taiwan 300 / CN | ||
| 02 /
LEE, Hom-Ti No. 11 Guangming Village East Dist. Hsinchu City Taiwan 300 / CN | |||
| 03 /
YIN, Hsiu-Yin 5F. No. 17 Lane 68 Xingyun St. Neihu Dist. Taipei City Taiwan 114 / CN | |||
| 04 /
HWANG, Sz-Chwun John No. 38 Alley 122 Lane 648 Minghu Rd. East Dist. Hsinchu City Taiwan 300 / CN | Representative(s) | Fuchs Patentanwälte Partnerschaft mbB Tower 185 Friedrich-Ebert-Anlage 35-37 60327 Frankfurt am Main / DE | [N/P] |
| Former [2017/35] | Fuchs Patentanwälte Partnerschaft mbB Westhafenplatz 1 60327 Frankfurt am Main / DE | ||
| Former [2014/08] | Hrovat, Andrea Darinka FUCHS Patentanwälte Westhafenplatz 1 60327 Frankfurt am Main / DE | Application number, filing date | 12771147.1 | 11.04.2012 | [2017/35] | WO2012CN73785 | Priority number, date | US201161475454P | 14.04.2011 Original published format: US 201161475454 P | US201213442345 | 09.04.2012 Original published format: US201213442345 | [2014/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012139492 | Date: | 18.10.2012 | Language: | EN | [2012/42] | Type: | A1 Application with search report | No.: | EP2697384 | Date: | 19.02.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.10.2012 takes the place of the publication of the European patent application. | [2014/08] | Type: | B1 Patent specification | No.: | EP2697384 | Date: | 30.08.2017 | Language: | EN | [2017/35] | Search report(s) | International search report - published on: | CN | 18.10.2012 | (Supplementary) European search report - dispatched on: | EP | 20.11.2014 | Classification | IPC: | C12P7/52, C07C53/124, C12N1/20, C12R1/145 | [2014/08] | CPC: |
C12P7/52 (EP,US);
C12P2203/00 (EP,US);
Y02E50/10 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON BUTTERSÄURE, BUTANOL UND BUTYRATESTER | [2014/08] | English: | METHOD FOR PRODUCING BUTYRIC ACID, BUTANOL AND BUTYRATE ESTER | [2014/08] | French: | PROCÉDÉ DE PRODUCTION D'ACIDE BUTYRIQUE, DE BUTANOL ET D'ESTER DE BUTYRATE | [2014/08] | Entry into regional phase | 25.07.2013 | National basic fee paid | 25.07.2013 | Search fee paid | 25.07.2013 | Designation fee(s) paid | 25.07.2013 | Examination fee paid | Examination procedure | 25.07.2013 | Examination requested [2014/08] | 23.04.2015 | Amendment by applicant (claims and/or description) | 06.10.2016 | Despatch of a communication from the examining division (Time limit: M04) | 18.01.2017 | Reply to a communication from the examining division | 16.03.2017 | Communication of intention to grant the patent | 20.07.2017 | Fee for grant paid | 20.07.2017 | Fee for publishing/printing paid | 20.07.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.10.2016 | Opposition(s) | 31.05.2018 | No opposition filed within time limit [2018/32] | Fees paid | Renewal fee | 17.02.2014 | Renewal fee patent year 03 | 06.03.2015 | Renewal fee patent year 04 | 31.01.2016 | Renewal fee patent year 05 | 31.01.2017 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.04.2012 | AL | 30.08.2017 | AT | 30.08.2017 | CY | 30.08.2017 | CZ | 30.08.2017 | EE | 30.08.2017 | ES | 30.08.2017 | FI | 30.08.2017 | HR | 30.08.2017 | IT | 30.08.2017 | LT | 30.08.2017 | LV | 30.08.2017 | MC | 30.08.2017 | MK | 30.08.2017 | PL | 30.08.2017 | PT | 30.08.2017 | RO | 30.08.2017 | RS | 30.08.2017 | SE | 30.08.2017 | SI | 30.08.2017 | SK | 30.08.2017 | SM | 30.08.2017 | TR | 30.08.2017 | BG | 30.11.2017 | NO | 30.11.2017 | GR | 01.12.2017 | IS | 30.12.2017 | GB | 11.04.2018 | IE | 11.04.2018 | LU | 11.04.2018 | MT | 11.04.2018 | [2020/34] |
| Former [2020/31] | HU | 11.04.2012 | |
| AT | 30.08.2017 | ||
| CY | 30.08.2017 | ||
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| MK | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| PT | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| TR | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| GB | 11.04.2018 | ||
| IE | 11.04.2018 | ||
| LU | 11.04.2018 | ||
| MT | 11.04.2018 | ||
| Former [2020/27] | HU | 11.04.2012 | |
| AT | 30.08.2017 | ||
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| PT | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| TR | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| GB | 11.04.2018 | ||
| IE | 11.04.2018 | ||
| LU | 11.04.2018 | ||
| MT | 11.04.2018 | ||
| Former [2020/16] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| TR | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| GB | 11.04.2018 | ||
| IE | 11.04.2018 | ||
| LU | 11.04.2018 | ||
| MT | 11.04.2018 | ||
| Former [2020/08] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| GB | 11.04.2018 | ||
| IE | 11.04.2018 | ||
| LU | 11.04.2018 | ||
| MT | 11.04.2018 | ||
| Former [2019/19] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| GB | 11.04.2018 | ||
| IE | 11.04.2018 | ||
| LU | 11.04.2018 | ||
| Former [2019/13] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| GB | 11.04.2018 | ||
| LU | 11.04.2018 | ||
| Former [2019/08] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| LU | 11.04.2018 | ||
| Former [2018/52] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| MC | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| Former [2018/39] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SI | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| Former [2018/24] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| IT | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| SM | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| Former [2018/23] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| EE | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| PL | 30.08.2017 | ||
| RO | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| SK | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| Former [2018/21] | AT | 30.08.2017 | |
| CZ | 30.08.2017 | ||
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| Former [2018/12] | AT | 30.08.2017 | |
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| LV | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| Former [2018/11] | AT | 30.08.2017 | |
| ES | 30.08.2017 | ||
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| BG | 30.11.2017 | ||
| NO | 30.11.2017 | ||
| GR | 01.12.2017 | ||
| IS | 30.12.2017 | ||
| Former [2018/10] | AT | 30.08.2017 | |
| FI | 30.08.2017 | ||
| HR | 30.08.2017 | ||
| LT | 30.08.2017 | ||
| RS | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| NO | 30.11.2017 | ||
| Former [2018/09] | FI | 30.08.2017 | |
| LT | 30.08.2017 | ||
| SE | 30.08.2017 | ||
| NO | 30.11.2017 | ||
| Former [2018/08] | FI | 30.08.2017 | |
| LT | 30.08.2017 | ||
| NO | 30.11.2017 | ||
| Former [2018/07] | LT | 30.08.2017 | |
| NO | 30.11.2017 | Documents cited: | Search | [XI] WO2008124490 (UNIV OHIO STATE et al.) [X] 1-18,25 * claims 1-16 *[I] 19-24 | International search | [Y] DENG MING-RONG ET AL.: "Progress on Biotechnological Production of Butyric Acid", CHINA BIOTECHNOLOGY, vol. 29, no. 3, March 2009 (2009-03-01), pages 117 - 122, XP008171283 | by applicant | BERG, M. JEREMY ET AL.: "Biochemistry", 2002, article "chap. 16" | WU ET AL., BIOTECHNOLOGY AND BIOENGINEERING, vol. 82, no. 1, 2003, pages 93 - 102 | CHEN, K.: "Immobilization of microorganism with phosphorylated polyvinyl alcohol (PVA) gel.", ENZYME MICROBIOB. TECHNOL., vol. 16, 1994, pages 679 - 683 |