EP2700184 - METHOD AND APPARATUS FOR TRANSMITTING ACKNOWLEDGEMENT/NONACKNOWLEDGEMENT SIGNALS IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 21.11.2022 | ||
Former | Examination is in progress Status updated on 26.03.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 443-742 / KR | [2014/09] | Inventor(s) | 01 /
LI, Yingyang 12/F Zhongdian Fazhan Building No.9 Xiaguangli Chaoyang District Beijing 100125 / CN | 02 /
FU, Jingxing 12/F Zhongdian Fazhan Building No.9 Xiaguangli Chaoyang District Beijing 100125 / CN | [2014/09] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2014/09] | Application number, filing date | 12773563.7 | 20.04.2012 | [2023/09] | WO2012KR03089 | Priority number, date | CN201110111614 | 22.04.2011 Original published format: CN201110111614 | [2014/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012144862 | Date: | 26.10.2012 | Language: | EN | [2012/43] | Type: | A2 Application without search report | No.: | EP2700184 | Date: | 26.02.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.10.2012 takes the place of the publication of the European patent application. | [2014/09] | Type: | B1 Patent specification | No.: | EP2700184 | Date: | 01.03.2023 | Language: | EN | [2023/09] | Search report(s) | International search report - published on: | KR | 10.01.2013 | (Supplementary) European search report - dispatched on: | EP | 27.02.2015 | Classification | IPC: | H04L1/18, H04L5/22 | [2015/14] | CPC: |
H04L1/1854 (EP,US);
H04L1/1887 (KR);
H04J11/0073 (KR);
H04J11/0076 (KR);
H04L1/1678 (KR);
H04L1/1896 (KR)
|
Former IPC [2014/09] | H04L1/16, H04L5/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUM ÜBERTRAGEN VON QUITTIERUNGS-/NICHT-QUITTIERUNGS-SIGNALEN IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM | [2014/09] | English: | METHOD AND APPARATUS FOR TRANSMITTING ACKNOWLEDGEMENT/NONACKNOWLEDGEMENT SIGNALS IN A WIRELESS COMMUNICATION SYSTEM | [2014/09] | French: | PROCÉDÉ ET APPAREIL DE TRANSMISSION DE SIGNAUX D'ACCUSÉ DE RÉCEPTION/D'ACCUSÉ DE RÉCEPTION NÉGATIF DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2014/09] | Entry into regional phase | 22.10.2013 | National basic fee paid | 22.10.2013 | Search fee paid | 22.10.2013 | Designation fee(s) paid | 22.10.2013 | Examination fee paid | Examination procedure | 22.10.2013 | Examination requested [2014/09] | 25.09.2015 | Amendment by applicant (claims and/or description) | 29.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 08.08.2019 | Reply to a communication from the examining division | 21.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 29.09.2021 | Reply to a communication from the examining division | 22.11.2022 | Communication of intention to grant the patent | 17.01.2023 | Fee for grant paid | 17.01.2023 | Fee for publishing/printing paid | 17.01.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.03.2019 | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 26.03.2014 | Renewal fee patent year 03 | 31.03.2015 | Renewal fee patent year 04 | 29.03.2016 | Renewal fee patent year 05 | 27.03.2017 | Renewal fee patent year 06 | 23.04.2018 | Renewal fee patent year 07 | 26.04.2019 | Renewal fee patent year 08 | 22.04.2020 | Renewal fee patent year 09 | 21.04.2021 | Renewal fee patent year 10 | 22.04.2022 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.03.2023 | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | FI | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SE | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | IE | 20.04.2023 | LU | 20.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | LI | 30.04.2023 | FR | 01.05.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | [2024/26] |
Former [2024/21] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
IE | 20.04.2023 | ||
LU | 20.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
FR | 01.05.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/10] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 20.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
FR | 01.05.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/09] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 20.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/08] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 20.04.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/04] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 20.04.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | AT | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | ES | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
Former [2023/33] | ES | 01.03.2023 | |
LT | 01.03.2023 | Documents cited: | Search | [X] - MOTOROLA, "Introduction of Rel-10 LTE-Advanced features in 36.213", 3GPP DRAFT; R1-106296 CR 36213 AFTER RAN1#62BIS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101119), vol. RAN WG1, no. Jacksonville, USA; 20101115, XP050469903 [X] 1,2,10-12 * page 52, paragraph 7.3 - page 53 * * page 56, paragraph 8.0 * * page 74, paragraph 10.1 - page 77, paragraph 10.1 * * page 84, paragraph 10.1; tables 10.1-0,10.1-1a,10.1-1b,10.1-1c * | [X] - CATT, "Resource Allocation for PUCCH Format 3", 3GPP DRAFT; R1-105153, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101005), vol. RAN WG1, no. Xi'an; 20101011, XP050450371 [X] 1,2,10-12 * page 1, paragraph 2 - page 2, paragraph 3; figure 1 * | [XP] - ERICSSON ET AL, "Remaining issues in general frame work for aggregation of carriers with different UL/DL configurations", 3GPP DRAFT; R1-120070, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120131), vol. RAN WG1, no. Dresden, Germany; 20120206 - 20120210, XP050562653 [XP] 1,2,10-12 * page 1, paragraph 2 - page 2, column 3 * * page 4, paragraph 6; examples 1,2 * | International search | [A]WO2011041623 (INTERDIGITAL PATENT HOLDINGS [US], et al); | [X] - LG ELE CTRONICS, "ACK/NACK on PUCCH for TDD", 3GPP TSG RAN WG1 MEETING #63, R1-106099, (20101115), XP050489853 | [A] - CATT, "Resource Allocation for PUCCH Format 3", 3GPP TSG RAN WG1 MEETING #62BIS, R1-105153, (20101011), XP050450371 |