EP2795783 - SYSTEM AND METHOD FOR CONTROLLING AN ENERGY STORAGE DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.01.2021 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 24.01.2020 | ||
Former | Grant of patent is intended Status updated on 12.11.2019 | ||
Former | Examination is in progress Status updated on 10.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2014/44] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
WEISSENBORN, Erik Morstattweg 1 70374 Stuttgart / DE | 02 /
RAPP, Holger Birkenweg 22 71254 Ditzingen / DE | [2014/44] | Application number, filing date | 12784516.2 | 23.10.2012 | [2020/09] | WO2012EP70923 | Priority number, date | DE20111089309 | 20.12.2011 Original published format: DE102011089309 | [2014/44] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2013091938 | Date: | 27.06.2013 | Language: | DE | [2013/26] | Type: | A2 Application without search report | No.: | EP2795783 | Date: | 29.10.2014 | Language: | DE | The application published by WIPO in one of the EPO official languages on 27.06.2013 takes the place of the publication of the European patent application. | [2014/44] | Type: | B1 Patent specification | No.: | EP2795783 | Date: | 26.02.2020 | Language: | DE | [2020/09] | Search report(s) | International search report - published on: | EP | 12.12.2013 | Classification | IPC: | H02M7/49, H02J7/00, H02M7/5395, H02M7/483, B60L58/18, B60L58/21 | [2019/46] | CPC: |
B60L58/18 (EP,US);
B60L58/21 (EP,US);
H02J7/0024 (EP,US);
H02M7/4835 (EP,US);
H02M7/49 (EP,US);
H02J2207/20 (US);
|
Former IPC [2014/44] | H02M7/49, H02J7/00, H02M7/5395, H02M7/483 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUM ANSTEUERN EINER ENERGIESPEICHEREINRICHTUNG | [2014/44] | English: | SYSTEM AND METHOD FOR CONTROLLING AN ENERGY STORAGE DEVICE | [2014/44] | French: | SYSTÈME ET PROCÉDÉ DE COMMANDE D'UN DISPOSITIF DE STOCKAGE D'ÉNERGIE | [2014/44] | Entry into regional phase | 21.07.2014 | National basic fee paid | 21.07.2014 | Designation fee(s) paid | 21.07.2014 | Examination fee paid | Examination procedure | 21.07.2014 | Examination requested [2014/44] | 10.02.2015 | Amendment by applicant (claims and/or description) | 13.02.2017 | Despatch of a communication from the examining division (Time limit: M06) | 21.08.2017 | Reply to a communication from the examining division | 23.11.2018 | Despatch of a communication from the examining division (Time limit: M06) | 28.05.2019 | Reply to a communication from the examining division | 13.11.2019 | Communication of intention to grant the patent | 15.01.2020 | Fee for grant paid | 15.01.2020 | Fee for publishing/printing paid | 15.01.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.02.2017 | Opposition(s) | 27.11.2020 | No opposition filed within time limit [2021/05] | Fees paid | Renewal fee | 31.10.2014 | Renewal fee patent year 03 | 02.11.2015 | Renewal fee patent year 04 | 31.10.2016 | Renewal fee patent year 05 | 02.11.2017 | Renewal fee patent year 06 | 31.10.2018 | Renewal fee patent year 07 | 31.10.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.10.2012 | AL | 26.02.2020 | CY | 26.02.2020 | CZ | 26.02.2020 | DK | 26.02.2020 | EE | 26.02.2020 | ES | 26.02.2020 | FI | 26.02.2020 | HR | 26.02.2020 | IT | 26.02.2020 | LT | 26.02.2020 | LV | 26.02.2020 | MC | 26.02.2020 | MK | 26.02.2020 | MT | 26.02.2020 | NL | 26.02.2020 | PL | 26.02.2020 | RO | 26.02.2020 | RS | 26.02.2020 | SE | 26.02.2020 | SI | 26.02.2020 | SK | 26.02.2020 | SM | 26.02.2020 | TR | 26.02.2020 | BG | 26.05.2020 | NO | 26.05.2020 | GR | 27.05.2020 | IS | 26.06.2020 | PT | 19.07.2020 | AT | 23.10.2020 | IE | 23.10.2020 | LU | 23.10.2020 | BE | 31.10.2020 | CH | 31.10.2020 | LI | 31.10.2020 | [2022/31] |
Former [2022/30] | HU | 23.10.2012 | |
AL | 26.02.2020 | ||
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 23.10.2020 | ||
IE | 23.10.2020 | ||
LU | 23.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2022/27] | HU | 23.10.2012 | |
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 23.10.2020 | ||
IE | 23.10.2020 | ||
LU | 23.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2022/26] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 23.10.2020 | ||
IE | 23.10.2020 | ||
LU | 23.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2022/07] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 23.10.2020 | ||
IE | 23.10.2020 | ||
LU | 23.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/46] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
IE | 23.10.2020 | ||
LU | 23.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/37] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
LU | 23.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/36] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
LU | 23.10.2020 | ||
BE | 31.10.2020 | ||
Former [2021/31] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
LU | 23.10.2020 | ||
Former [2021/10] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/50] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/49] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/48] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/47] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/45] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/40] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/39] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/38] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/37] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
NO | 26.05.2020 | ||
Former [2020/35] | FI | 26.02.2020 | |
NO | 26.05.2020 | Cited in | International search | [XI]EP0945971 (ELECTRIC BOAT CORP [US]) [X] 1,5,6,8,10-12 * paragraph [0037] - paragraph [0050] * * paragraph [0064] - paragraph [0067] * * figures 1a,1b,2,4-7,10 * [I] 2-4,7,9; | [A]US2001038541 (HAMMOND PETER [US], et al) [A] 1-12 * the whole document *; | [XI]DE69908469T (ELECTRIC BOAT CORP [US]) [X] 1,5,6,8,10-12 * paragraph [0047] - paragraph [0059] * * paragraph [0076] - paragraph [0079] * * figures 1a,1b,2,4-7,10 * [I] 2-4,7,9; | [A] - YOUNG-MIN PARK ET AL, "A Simple and Reliable PWM Synchronization & Phase-Shift Method for Cascaded H-Bridge Multilevel Inverters based on a Standard Serial Communication Protocol", THE 2006 IEEE INDUSTRY APPLICATIONS CONFERENCE FORTY-FIRST IAS ANNUAL MEETING, CONFERENCE RECORD OF, IEEE, PISCATAWAY, NJ, US, (20061001), ISBN 978-1-4244-0364-6, pages 988 - 994, XP031026148 [A] 1-12 * the whole document * | Examination | DE69908469T | by applicant | DE3924398 | US5642275 |