blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2715904

EP2715904 - SYSTEM AND METHOD FOR INTEGRATING AND MANAGING DEMAND/RESPONSE BETWEEN ALTERNATIVE ENERGY SOURCES, GRID POWER, AND LOADS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.05.2017
Database last updated on 24.04.2024
Most recent event   Tooltip06.03.2020Lapse of the patent in a contracting state
New state(s): TR
published on 08.04.2020  [2020/15]
Applicant(s)For all designated states
Cameron, D. Kevin
802 Ladis Ct.
Sunnyvale, California 94086 / US
[2014/15]
Inventor(s)01 / see applicant
...
 [2014/15]
Representative(s)Derry, Paul Stefan, et al
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[2014/15]
Application number, filing date12788979.824.05.2012
[2016/26]
WO2012US39480
Priority number, dateUS201161489263P24.05.2011         Original published format: US 201161489263 P
[2014/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012162570
Date:29.11.2012
Language:EN
[2012/48]
Type: A1 Application with search report 
No.:EP2715904
Date:09.04.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 29.11.2012 takes the place of the publication of the European patent application.
[2014/15]
Type: B1 Patent specification 
No.:EP2715904
Date:29.06.2016
Language:EN
[2016/26]
Search report(s)International search report - published on:RU29.11.2012
(Supplementary) European search report - dispatched on:EP19.06.2015
ClassificationIPC:H02J3/36, H02J3/38
[2014/15]
CPC:
H02J1/14 (EP,US); H02J7/34 (EP,US); H02J7/35 (EP,US);
H02J1/102 (EP,US); H02J2300/24 (EP,US); H02J2300/26 (EP,US);
H02J2300/28 (EP,US); H02J2300/30 (EP,US); H02J2310/14 (EP,US);
H02J2310/48 (EP,US); H02J2310/66 (EP); H02J3/28 (EP,US);
H02J3/381 (EP,US); H02J9/061 (EP,US); Y02B10/70 (EP,US);
Y02B90/10 (US); Y02E10/56 (EP,US); Y02E10/76 (EP,US);
Y02E60/00 (US); Y02T90/167 (EP); Y04S10/126 (US);
Y04S30/12 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/15]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM UND VERFAHREN FÜR DIE INTEGRATION UND VERWALTUNG VON NACHFRAGEN/REAKTIONEN ZWISCHEN ALTERNATIVEN ENERGIEQUELLEN, NETZLEISTUNGEN UND LASTEN[2014/15]
English:SYSTEM AND METHOD FOR INTEGRATING AND MANAGING DEMAND/RESPONSE BETWEEN ALTERNATIVE ENERGY SOURCES, GRID POWER, AND LOADS[2014/15]
French:SYSTÈME ET PROCÉDÉ POUR INTÉGRER ET GÉRER UNE DEMANDE/RÉPONSE ENTRE DES SOURCES D'ÉNERGIE ALTERNATIVE, UN RÉSEAU ÉLECTRIQUE ET DES CHARGES[2014/15]
Entry into regional phase26.11.2013National basic fee paid 
26.11.2013Search fee paid 
26.11.2013Designation fee(s) paid 
26.11.2013Examination fee paid 
Examination procedure26.11.2013Examination requested  [2014/15]
18.01.2016Amendment by applicant (claims and/or description)
25.02.2016Communication of intention to grant the patent
20.05.2016Fee for grant paid
20.05.2016Fee for publishing/printing paid
20.05.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  25.02.2016
Opposition(s)30.03.2017No opposition filed within time limit [2017/23]
Fees paidRenewal fee
25.03.2014Renewal fee patent year 03
21.05.2015Renewal fee patent year 04
17.05.2016Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.05.2012
AL29.06.2016
AT29.06.2016
BE29.06.2016
CY29.06.2016
CZ29.06.2016
DK29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
MC29.06.2016
MK29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SI29.06.2016
SK29.06.2016
SM29.06.2016
TR29.06.2016
BG29.09.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
[2020/15]
Former [2019/51]HU24.05.2012
AL29.06.2016
AT29.06.2016
BE29.06.2016
CY29.06.2016
CZ29.06.2016
DK29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
MC29.06.2016
MK29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SI29.06.2016
SK29.06.2016
SM29.06.2016
BG29.09.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
Former [2019/46]HU24.05.2012
AL29.06.2016
AT29.06.2016
BE29.06.2016
CY29.06.2016
CZ29.06.2016
DK29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
MC29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SI29.06.2016
SK29.06.2016
SM29.06.2016
BG29.09.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
Former [2019/31]HU24.05.2012
AL29.06.2016
AT29.06.2016
BE29.06.2016
CZ29.06.2016
DK29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
MC29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SI29.06.2016
SK29.06.2016
SM29.06.2016
BG29.09.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
Former [2018/46]AL29.06.2016
AT29.06.2016
BE29.06.2016
CZ29.06.2016
DK29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
MC29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SI29.06.2016
SK29.06.2016
SM29.06.2016
BG29.09.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
Former [2018/06]AT29.06.2016
BE29.06.2016
CZ29.06.2016
DK29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
MC29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SI29.06.2016
SK29.06.2016
SM29.06.2016
BG29.09.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
Former [2017/38]AT29.06.2016
BE29.06.2016
CZ29.06.2016
DK29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SI29.06.2016
SK29.06.2016
SM29.06.2016
BG29.09.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
Former [2017/11]AT29.06.2016
BE29.06.2016
CZ29.06.2016
EE29.06.2016
ES29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SK29.06.2016
SM29.06.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
PT31.10.2016
Former [2017/10]BE29.06.2016
CZ29.06.2016
EE29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
NL29.06.2016
PL29.06.2016
RO29.06.2016
RS29.06.2016
SK29.06.2016
NO29.09.2016
GR30.09.2016
IS29.10.2016
Former [2017/09]CZ29.06.2016
EE29.06.2016
FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
NL29.06.2016
RO29.06.2016
RS29.06.2016
NO29.09.2016
GR30.09.2016
Former [2016/52]FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
NL29.06.2016
RS29.06.2016
NO29.09.2016
GR30.09.2016
Former [2016/51]FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
RS29.06.2016
NO29.09.2016
GR30.09.2016
Former [2016/50]FI29.06.2016
HR29.06.2016
LT29.06.2016
LV29.06.2016
RS29.06.2016
NO29.09.2016
Former [2016/49]FI29.06.2016
LT29.06.2016
NO29.09.2016
Former [2016/46]LT29.06.2016
NO29.09.2016
Documents cited:Search[A]WO2011027195  (ABB TECHNOLOGY LTD [CH], et al) [A] 1-8 * the whole document *;
 [A]US2011068624  (DIBACHI RHONDA [US], et al) [A] 1-8 * the whole document *;
 [AP]WO2011098873  (ABB TECHNOLOGY LTD [CH], et al) [AP] 1-8* the whole document *
International search[A]JPH07159592  (HITACHI LTD);
 [A]RU2002135603  (YATROVA LARISA IVANOVNA);
 [A]WO2010018264  (UNIV VALENCIA POLITECNICA [ES], et al);
 [A]WO2011023678  (THALES SA [FR], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.