EP2717253 - DRIVE DEVICE FOR LIQUID CRYSTAL DISPLAY DEVICE, AND LIQUID CRYSTAL DISPLAY DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.10.2018 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 17.11.2017 | ||
Former | Grant of patent is intended Status updated on 31.07.2017 | ||
Former | Examination is in progress Status updated on 28.11.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Kyocera Display Corporation 641-1 Ichimiyake, Yasu-shi Shiga, 5202362 / JP | [2014/15] | Inventor(s) | 01 /
GONDO, Kenji c/o Kyocera Display Corporation 641-1 Ichimiyake, Yasu-shi Shiga, 5202362 / JP | [2014/22] |
Former [2014/15] | 01 /
GONDO, Kenji c/o Kyocera Display Corporation 7-18 Higashinippori 5-chome Arakawa-ku Tokyo 116-0014 / JP | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2017/51] |
Former [2014/15] | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | Application number, filing date | 12790073.6 | 11.05.2012 | [2017/51] | WO2012JP62221 | Priority number, date | JP20110116493 | 25.05.2011 Original published format: JP 2011116493 | [2014/15] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012161001 | Date: | 29.11.2012 | Language: | JA | [2012/48] | Type: | A1 Application with search report | No.: | EP2717253 | Date: | 09.04.2014 | Language: | EN | [2014/15] | Type: | B1 Patent specification | No.: | EP2717253 | Date: | 20.12.2017 | Language: | EN | [2017/51] | Search report(s) | International search report - published on: | JP | 29.11.2012 | (Supplementary) European search report - dispatched on: | EP | 06.02.2015 | Classification | IPC: | G09G3/36, G02F1/133, G09G3/20 | [2014/15] | CPC: |
G09G3/3696 (EP,US);
G09G2310/08 (EP,US);
G09G2330/02 (EP,US);
G09G2330/021 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | TREIBERVORRICHTUNG FÜR EINE FLÜSSIGKRISTALLANZEIGEVORRICHTUNG UND FLÜSSIGKRISTALLANZEIGEVORRICHTUNG | [2017/33] | English: | DRIVE DEVICE FOR LIQUID CRYSTAL DISPLAY DEVICE, AND LIQUID CRYSTAL DISPLAY DEVICE | [2014/15] | French: | DISPOSITIF D'EXCITATION POUR DISPOSITIF D'AFFICHAGE À CRISTAUX LIQUIDES, ET DISPOSITIF D'AFFICHAGE À CRISTAUX LIQUIDES | [2014/15] |
Former [2014/15] | ANTRIEBSVORRICHTUNG FÜR EINE FLÜSSIGKRISTALLANZEIGEVORRICHTUNG UND FLÜSSIGKRISTALLANZEIGEVORRICHTUNG | Entry into regional phase | 11.12.2013 | Translation filed | 12.12.2013 | National basic fee paid | 12.12.2013 | Search fee paid | 12.12.2013 | Designation fee(s) paid | 12.12.2013 | Examination fee paid | Examination procedure | 12.12.2013 | Examination requested [2014/15] | 18.06.2015 | Amendment by applicant (claims and/or description) | 28.01.2016 | Despatch of a communication from the examining division (Time limit: M04) | 03.05.2016 | Reply to a communication from the examining division | 18.05.2016 | Despatch of a communication from the examining division (Time limit: M04) | 01.08.2016 | Reply to a communication from the examining division | 17.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 24.03.2017 | Reply to a communication from the examining division | 01.08.2017 | Communication of intention to grant the patent | 08.11.2017 | Receipt of the translation of the claim(s) | 09.11.2017 | Fee for grant paid | 09.11.2017 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.01.2016 | Opposition(s) | 21.09.2018 | No opposition filed within time limit [2018/48] | Fees paid | Renewal fee | 26.03.2014 | Renewal fee patent year 03 | 28.05.2015 | Renewal fee patent year 04 | 30.03.2016 | Renewal fee patent year 05 | 23.05.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.05.2012 | AL | 20.12.2017 | AT | 20.12.2017 | CY | 20.12.2017 | CZ | 20.12.2017 | DK | 20.12.2017 | EE | 20.12.2017 | ES | 20.12.2017 | FI | 20.12.2017 | HR | 20.12.2017 | IT | 20.12.2017 | LT | 20.12.2017 | LV | 20.12.2017 | MC | 20.12.2017 | MK | 20.12.2017 | NL | 20.12.2017 | PL | 20.12.2017 | PT | 20.12.2017 | RO | 20.12.2017 | RS | 20.12.2017 | SE | 20.12.2017 | SI | 20.12.2017 | SK | 20.12.2017 | SM | 20.12.2017 | TR | 20.12.2017 | BG | 20.03.2018 | NO | 20.03.2018 | GR | 21.03.2018 | IS | 20.04.2018 | GB | 11.05.2018 | IE | 11.05.2018 | LU | 11.05.2018 | MT | 11.05.2018 | BE | 31.05.2018 | CH | 31.05.2018 | FR | 31.05.2018 | LI | 31.05.2018 | [2020/34] |
Former [2020/31] | HU | 11.05.2012 | |
AT | 20.12.2017 | ||
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
MK | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
PT | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
TR | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
GB | 11.05.2018 | ||
IE | 11.05.2018 | ||
LU | 11.05.2018 | ||
MT | 11.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
FR | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/27] | HU | 11.05.2012 | |
AT | 20.12.2017 | ||
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
PT | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
TR | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
GB | 11.05.2018 | ||
IE | 11.05.2018 | ||
LU | 11.05.2018 | ||
MT | 11.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
FR | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/16] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
TR | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
GB | 11.05.2018 | ||
IE | 11.05.2018 | ||
LU | 11.05.2018 | ||
MT | 11.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
FR | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/08] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
GB | 11.05.2018 | ||
IE | 11.05.2018 | ||
LU | 11.05.2018 | ||
MT | 11.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
FR | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/23] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
GB | 11.05.2018 | ||
IE | 11.05.2018 | ||
LU | 11.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
FR | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/21] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
GB | 11.05.2018 | ||
IE | 11.05.2018 | ||
LU | 11.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/19] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
IE | 11.05.2018 | ||
LU | 11.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/17] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
LU | 11.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/12] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/06] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/51] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/40] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/39] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/38] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/37] | CY | 20.12.2017 | |
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
NL | 20.12.2017 | ||
PL | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
Former [2018/34] | FI | 20.12.2017 | |
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
NL | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
Former [2018/24] | FI | 20.12.2017 | |
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
Former [2018/23] | FI | 20.12.2017 | |
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
Former [2018/22] | FI | 20.12.2017 | |
LT | 20.12.2017 | ||
NO | 20.03.2018 | Documents cited: | Search | [XDI]JPH11338433 (ADVANCED DISPLAY KK) [XD] 1,2,6 * abstract * * paragraphs [0009] - [0020]; figures 7,8 * * paragraphs [0028] - [0039]; figures 1-3 * [I] 3-5; | [A]US2002060673 (NORITAKE KAZUTO [JP], et al) [A] 4 * abstract * * paragraphs [0029] - [0034]; figures 1-2a * * paragraphs [0041] - [0043]; figures 2a,2b *; | [A]US6249270 (ITO TAKAE [JP]) [A] 3,4 * abstract * * column 15, line 54 - column 18, line 6; figure 9 * * column 19, line 14 - column 20, line 37; figure 12 * | International search | [X]JPH11218739 (MATSUSHITA ELECTRIC IND CO LTD); | [Y]JP2010066632 (SHARP KK); | [Y]JP2005062484 (TOSHIBA MATSUSHITA DISPLAY TEC) | Examination | JP2003216115 |