EP2800753 - PROCESS FOR THE PREPARATION OF METALLOCENE COMPLEXES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.03.2019 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 20.04.2018 | ||
Former | Grant of patent is intended Status updated on 08.03.2018 | ||
Former | Examination is in progress Status updated on 16.06.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states SAUDI BASIC INDUSTRIES CORPORATION (SABIC) P.O.Box 5101 Riyadh 11422 / SA | [2014/46] | Inventor(s) | 01 /
AL-HUMYDI, Abdulaziz Hamad c/o SABIC Headquarters Patent Section PO Box 5101 11422 Riyadh / SA | 02 /
ABURAQABAH, Atieh c/o SABIC Headquarters Patent Section PO Box 5101 11422 Riyadh / SA | 03 /
GÖRL, Christian Anorganische Chemie II Universität Bayreuth 95447 Bayreuth / DE | 04 /
ALT, Helmut Anorganische Chemie II Universität Bayreuth 95447 Bayreuth / DE | [2014/46] | Representative(s) | Sabic Intellectual Property Group Sabic Intellectual Property Department P.O. Box 3008 6160 GA Geleen / NL | [2018/21] |
Former [2014/46] | Vroemen, Maurice SABIC Intellectual Property Group P.O.Box 3008 6160 GA Geleen / NL | Application number, filing date | 12805597.7 | 13.12.2012 | [2018/21] | WO2012EP05231 | Priority number, date | EP20110009973 | 19.12.2011 Original published format: EP 11009973 | [2014/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013091836 | Date: | 27.06.2013 | Language: | EN | [2013/26] | Type: | A1 Application with search report | No.: | EP2800753 | Date: | 12.11.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.06.2013 takes the place of the publication of the European patent application. | [2014/46] | Type: | B1 Patent specification | No.: | EP2800753 | Date: | 23.05.2018 | Language: | EN | [2018/21] | Search report(s) | International search report - published on: | EP | 27.06.2013 | Classification | IPC: | C07F17/00, C08F10/00 | [2014/46] | CPC: |
C07F17/00 (EP,CN,US);
C07C1/321 (CN,US);
C08F4/76 (US);
C07C13/32 (US);
C07C13/36 (US);
C07C13/38 (US);
| C-Set: |
C07C1/321, C07C13/465 (CN);
C08F110/02, C08F4/65927 (EP,US);
C08F110/02, C08F4/65912 (US,EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON METALLOCENKOMPLEXEN | [2014/46] | English: | PROCESS FOR THE PREPARATION OF METALLOCENE COMPLEXES | [2014/46] | French: | PROCÉDÉ POUR LA PRÉPARATION DE COMPLEXES MÉTALLOCÈNES | [2014/46] | Entry into regional phase | 14.07.2014 | National basic fee paid | 14.07.2014 | Designation fee(s) paid | 14.07.2014 | Examination fee paid | Examination procedure | 14.07.2014 | Examination requested [2014/46] | 17.07.2015 | Amendment by applicant (claims and/or description) | 20.06.2017 | Despatch of a communication from the examining division (Time limit: M04) | 28.11.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 09.01.2018 | Reply to a communication from the examining division | 09.03.2018 | Communication of intention to grant the patent | 10.04.2018 | Fee for grant paid | 10.04.2018 | Fee for publishing/printing paid | 10.04.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.06.2017 | Opposition(s) | 26.02.2019 | No opposition filed within time limit [2019/18] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 09.01.2018 | Request for further processing filed | 09.01.2018 | Full payment received (date of receipt of payment) Request granted | 24.01.2018 | Decision despatched | 17.07.2015 | Request for further processing filed | 17.07.2015 | Full payment received (date of receipt of payment) Request granted | 11.08.2015 | Decision despatched | Fees paid | Renewal fee | 11.12.2014 | Renewal fee patent year 03 | 10.12.2015 | Renewal fee patent year 04 | 13.12.2016 | Renewal fee patent year 05 | 12.12.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.12.2012 | AL | 23.05.2018 | AT | 23.05.2018 | CY | 23.05.2018 | CZ | 23.05.2018 | DK | 23.05.2018 | EE | 23.05.2018 | ES | 23.05.2018 | FI | 23.05.2018 | HR | 23.05.2018 | IT | 23.05.2018 | LT | 23.05.2018 | LV | 23.05.2018 | MC | 23.05.2018 | MK | 23.05.2018 | NL | 23.05.2018 | PL | 23.05.2018 | PT | 23.05.2018 | RO | 23.05.2018 | RS | 23.05.2018 | SE | 23.05.2018 | SI | 23.05.2018 | SK | 23.05.2018 | SM | 23.05.2018 | TR | 23.05.2018 | BG | 23.08.2018 | NO | 23.08.2018 | GR | 24.08.2018 | IS | 23.09.2018 | GB | 13.12.2018 | IE | 13.12.2018 | LU | 13.12.2018 | MT | 13.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | FR | 31.12.2018 | LI | 31.12.2018 | [2020/32] |
Former [2020/31] | HU | 13.12.2012 | |
AL | 23.05.2018 | ||
AT | 23.05.2018 | ||
CY | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
MK | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
PT | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
TR | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
GB | 13.12.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
MT | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/30] | HU | 13.12.2012 | |
AL | 23.05.2018 | ||
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
PT | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
TR | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
GB | 13.12.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
MT | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/28] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
PT | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
TR | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
GB | 13.12.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
MT | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/16] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
TR | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
GB | 13.12.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
MT | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/08] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
GB | 13.12.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
MT | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/04] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
GB | 13.12.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/03] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
GB | 13.12.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
BE | 31.12.2018 | ||
FR | 31.12.2018 | ||
Former [2019/51] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
BE | 31.12.2018 | ||
FR | 31.12.2018 | ||
Former [2019/49] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
FR | 31.12.2018 | ||
Former [2019/48] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
IE | 13.12.2018 | ||
LU | 13.12.2018 | ||
Former [2019/40] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
LU | 13.12.2018 | ||
Former [2019/39] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
LU | 13.12.2018 | ||
Former [2019/26] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/11] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/10] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/09] | DK | 23.05.2018 | |
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/08] | DK | 23.05.2018 | |
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2018/52] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2018/51] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
Former [2018/50] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
Former [2018/49] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
LT | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
Former [2018/47] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
LT | 23.05.2018 | ||
NO | 23.08.2018 | Cited in | International search | [AD]EP1059300 (DSM NV [NL]) [AD] 1-12 * page 11, paragraph 64 - page 12; example I * * page 14, paragraph 76; example II ** page 15, paragraph 84; example III *; | [I]US6342622 (ARTS HENRICUS J [NL], et al) [I] 1-12 * column 4, line 29 - line 34 * * column 12, line 56 - line 67; example I * * column 15, line 48 - line 60; example II * * column 17, line 5 - line 16; example III * * column 25; example XX * * column 28; claim 14 *; | [A] - EDWIN G. IJPEIJ ET AL, "A Suzuki Coupling Based Route to 2,2'-Bis(2-indenyl)biphenyl Derivatives", THE JOURNAL OF ORGANIC CHEMISTRY, (20020101), vol. 67, no. 1, doi:10.1021/jo016040i, ISSN 0022-3263, pages 169 - 176, XP055020070 [A] 1-12 * page 171; compounds 22, 23, 26 * DOI: http://dx.doi.org/10.1021/jo016040i | by applicant | EP0277003 | EP0277004 | EP0420436 | EP0426637 | EP0427697 | EP0500944 | NL9101502 | EP1059300 | - E. G. IJPEJI ET AL., "A Suzuki coupling based route to 2,2'-bis(2-indenyl)biphenyl derivatives", J. ORG. CHEM., (2002), vol. 67, page 167 | - S.N. EGE, Organic Chemistry, D.C. HEATH AND CO., (1984), pages 51 - 54 | - JOURNAL OF THE AMERICA CHEMICAL SOCIETY, (2011), vol. 133, no. 24, pages 9204 - 9207 | - ELLIS, W.W. ET AL., "Synthesis, structure and properties of chiral titanium and zirconium complexes bearing biaryl strapped substituted cyclopentadienyl ligands", ORGANOMETALLICS, (1993), vol. 12, no. 11, doi:doi:10.1021/om00035a026, pages 4391 - 4401, XP000983569 DOI: http://dx.doi.org/10.1021/om00035a026 | - IJPEIJ, E. G. ET AL., "A Suzuki coupling based route to 2,2'-bis(2-indenyl)biphenyl derivatives", J. ORG. CHEM., (2002), vol. 67, page 169 |