blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2667473

EP2667473 - ON-DEMAND POWER CONTROL SYSTEM, ON-DEMAND POWER CONTROL SYSTEM PROGRAM, AND COMPUTER-READABLE RECORDING MEDIUM RECORDED WITH SAID PROGRAM [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  01.12.2017
Database last updated on 15.06.2024
FormerExamination is in progress
Status updated on  04.04.2017
Most recent event   Tooltip01.12.2017Application deemed to be withdrawnpublished on 03.01.2018  [2018/01]
Applicant(s)For all designated states
Nitto Denko Corporation
1-1-2, Shimohozumi
Ibaraki-shi, Osaka 567-8680 / JP
[2013/48]
Inventor(s)01 / MATSUYAMA Takashi
c/o Kyoto University
Yoshidahonmachi
Sakyo-ku
Kyoto-shi Kyoto 606-8501 / JP
02 / KATO Takekazu
c/o Kyoto University
Yoshidahonmachi
Sakyo-ku
Kyoto-shi Kyoto 606-8501 / JP
03 / YUASA Kenji
c/o Kyoto University
Yoshidahonmachi
Sakyo-ku
Kyoto-shi Kyoto 606-8501 / JP
 [2013/48]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[N/P]
Former [2013/48]Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Application number, filing date12810938.613.07.2012
WO2012JP68000
Priority number, dateJP2011015449513.07.2011         Original published format: JP 2011154495
[2013/48]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013008934
Date:17.01.2013
Language:JA
[2013/03]
Type: A1 Application with search report 
No.:EP2667473
Date:27.11.2013
Language:EN
[2013/48]
Search report(s)International search report - published on:JP17.01.2013
(Supplementary) European search report - dispatched on:EP14.10.2014
ClassificationIPC:H02J3/00, G06Q10/00, H02J13/00
[2013/48]
CPC:
G06Q50/06 (EP,US); H02J13/00 (KR); H02J3/00 (KR);
H02J3/14 (EP,US); H02J4/00 (US); H04L12/2827 (EP,US);
H02J2310/14 (EP,US); Y02B70/30 (US); Y02B70/3225 (EP,US);
Y04S20/20 (US); Y04S20/222 (EP,US); Y04S20/242 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/48]
TitleGerman:SYSTEM FÜR BEDARFSGERECHTE LEISTUNGSSTEUERUNG, PROGRAMM FÜR DAS SYSTEM FÜR BEDARFSGERECHTE LEISTUNGSSTEUERUNG UND COMPUTERLESBARES AUFZEICHNUNGSMEDIUM MIT DIESEM PROGRAMM[2013/48]
English:ON-DEMAND POWER CONTROL SYSTEM, ON-DEMAND POWER CONTROL SYSTEM PROGRAM, AND COMPUTER-READABLE RECORDING MEDIUM RECORDED WITH SAID PROGRAM[2013/48]
French:SYSTÈME DE COMMANDE DE PUISSANCE SUR DEMANDE, PROGRAMME DE SYSTÈME DE COMMANDE DE PUISSANCE SUR DEMANDE ET SUPPORT D'ENREGISTREMENT LISIBLE PAR ORDINATEUR ENREGISTRÉ AVEC LEDIT PROGRAMME[2013/48]
Entry into regional phase18.07.2013Translation filed 
18.07.2013National basic fee paid 
18.07.2013Search fee paid 
18.07.2013Designation fee(s) paid 
18.07.2013Examination fee paid 
Examination procedure18.07.2013Examination requested  [2013/48]
30.04.2015Amendment by applicant (claims and/or description)
19.08.2015Despatch of a communication from the examining division (Time limit: M04)
15.12.2015Reply to a communication from the examining division
02.03.2016Despatch of a communication from the examining division (Time limit: M06)
05.09.2016Reply to a communication from the examining division
24.03.2017Despatch of a communication from the examining division (Time limit: M04)
04.08.2017Application deemed to be withdrawn, date of legal effect  [2018/01]
28.08.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2018/01]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.08.2015
Fees paidRenewal fee
29.07.2014Renewal fee patent year 03
28.07.2015Renewal fee patent year 04
27.07.2016Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
31.07.201706   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US4551812  (GURR GEORGE P [US], et al) [X] 1,24* column 11, line 61 - column 18, line 59; figures 2-9 *;
 [X]EP0372961  (HONEYWELL INC [US]) [X] 1,24 * column 5, line 27 - column 14, line 10; figures 1,3,4 *;
 [XDI]JP2010193562  (NAT INST INF & COMM TECH) [XD] 1,24 * paragraphs [0043] - [0053] - [0070] - [0075] - [0082] - [0093]; figures 1,2,5,8-16 * [I] 2-23,25-39
International search[A]JPH066935  (BROTHER IND LTD);
 [A]JPH0638369  (HITACHI LTD);
 [A]JPH09252533  (TOSHIBA CORP)
by applicantWO2008152798
 JP2010193562
    - TAKEKAZU KATO, "i-Energy and Smart Grid", IEICE TECHNICAL REPORT, (20090119), pages 133 - 138
    - PROFESSOR TAKASHI MATSUYAMA, "i-Energy and Smart Grid", GRADUATE SCHOOL, KYOTO UNIVERSITY, (20090729), page 21
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.