EP2745478 - CIRCUIT ARRANGEMENT AND METHOD FOR TRANSMITTING SIGNALS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.01.2022 Database last updated on 04.06.2024 | |
Former | The patent has been granted Status updated on 05.02.2021 | ||
Former | Grant of patent is intended Status updated on 15.09.2020 | ||
Former | Examination is in progress Status updated on 30.07.2020 | ||
Former | Grant of patent is intended Status updated on 17.03.2020 | ||
Former | Examination is in progress Status updated on 29.04.2019 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Silicon Line GmbH Landsberger Str. 314 / III Rgb. 80687 München / DE | [2019/34] |
Former [2014/26] | For all designated states Silicon Line GmbH Elsenheimerstrasse 48/II 80687 München / DE | Inventor(s) | 01 /
BLON, Thomas c/o Silicon Line GmbH Landsberger Str. 314 III Rgb. 80687 München / DE | 02 /
JANSEN, Florian c/o Silicon Line GmbH Landsberger Str. 314 III Rgb. 80687 München / DE | 03 /
HOELTKE, Holger Am Blütenanger 54C 80995 München / DE | [2020/36] |
Former [2014/26] | 01 /
BLON, Thomas c/o Silicon Line GmbH Elsenheimerstr. 48 II 80687 München / DE | ||
02 /
JANSEN, Florian c/o Silicon Line GmbH Elsenheimerstr. 48 II 80687 München / DE | |||
03 /
HOELTKE, Holger Am Blütenanger 54C 80995 München / DE | Representative(s) | Hofmann, Andreas, et al RGTH Patentanwälte PartGmbB Postfach 33 02 11 80062 München / DE | [2021/10] |
Former [2014/27] | Hofmann, Andreas, et al Richter Werdermann Gerbaulet Hofmann Patentanwälte Postfach 33 02 11 80062 München / DE | ||
Former [2014/26] | Richter Werdermann Gerbaulet Hofmann Patentanwälte P.O. Box 33 02 11 80062 München / DE | Application number, filing date | 12813749.4 | 16.08.2012 | [2021/10] | WO2012DE200054 | Priority number, date | DE20111052764 | 16.08.2011 Original published format: DE102011052764 | [2014/26] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2013023656 | Date: | 21.02.2013 | Language: | DE | [2013/08] | Type: | A2 Application without search report | No.: | EP2745478 | Date: | 25.06.2014 | Language: | DE | The application published by WIPO in one of the EPO official languages on 21.02.2013 takes the place of the publication of the European patent application. | [2014/26] | Type: | B1 Patent specification | No.: | EP2745478 | Date: | 10.03.2021 | Language: | DE | [2021/10] | Search report(s) | International search report - published on: | EP | 30.05.2013 | Classification | IPC: | G06F1/10, H04L25/02, // G06F1/04, H04L7/00 | [2020/15] | CPC: |
H04L25/0276 (EP,US);
H04L7/048 (US);
G06F1/105 (EP,US);
H04L7/0091 (US);
G06F1/04 (EP,US);
H04L7/0008 (EP,US)
|
Former IPC [2014/26] | H04L25/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHALTUNGSANORDNUNG UND VERFAHREN ZUM ÜBERTRAGEN VON SIGNALEN | [2014/26] | English: | CIRCUIT ARRANGEMENT AND METHOD FOR TRANSMITTING SIGNALS | [2014/26] | French: | CIRCUITERIE ET PROCÉDÉ DE TRANSMISSION DE SIGNAUX | [2014/26] | Entry into regional phase | 13.03.2014 | National basic fee paid | 13.03.2014 | Designation fee(s) paid | 13.03.2014 | Examination fee paid | Examination procedure | 17.03.2014 | Examination requested [2014/26] | 06.10.2014 | Amendment by applicant (claims and/or description) | 03.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 13.11.2019 | Reply to a communication from the examining division | 18.03.2020 | Communication of intention to grant the patent | 28.07.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 16.09.2020 | Communication of intention to grant the patent | 26.01.2021 | Fee for grant paid | 26.01.2021 | Fee for publishing/printing paid | 26.01.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.05.2019 | Opposition(s) | 13.12.2021 | No opposition filed within time limit [2022/07] | Fees paid | Renewal fee | 27.08.2014 | Renewal fee patent year 03 | 27.08.2015 | Renewal fee patent year 04 | 24.02.2017 | Renewal fee patent year 05 | 30.08.2017 | Renewal fee patent year 06 | 30.08.2018 | Renewal fee patent year 07 | 01.09.2019 | Renewal fee patent year 08 | 31.08.2020 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 31.08.2016 | 05   M06   Fee paid on   24.02.2017 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.08.2012 | AL | 10.03.2021 | CY | 10.03.2021 | CZ | 10.03.2021 | DK | 10.03.2021 | EE | 10.03.2021 | ES | 10.03.2021 | FI | 10.03.2021 | HR | 10.03.2021 | IT | 10.03.2021 | LT | 10.03.2021 | LV | 10.03.2021 | MC | 10.03.2021 | MK | 10.03.2021 | PL | 10.03.2021 | RO | 10.03.2021 | RS | 10.03.2021 | SE | 10.03.2021 | SI | 10.03.2021 | SK | 10.03.2021 | SM | 10.03.2021 | BG | 10.06.2021 | NO | 10.06.2021 | GR | 11.06.2021 | IS | 10.07.2021 | PT | 12.07.2021 | AT | 16.08.2021 | IE | 16.08.2021 | LU | 16.08.2021 | BE | 31.08.2021 | [2024/22] |
Former [2023/29] | HU | 16.08.2012 | |
AL | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
AT | 16.08.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
Former [2023/24] | AL | 10.03.2021 | |
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
AT | 16.08.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
Former [2022/48] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
AT | 16.08.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
Former [2022/35] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
Former [2022/34] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
Former [2022/23] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 16.08.2021 | ||
Former [2022/18] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/13] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/10] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/08] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/07] | AL | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/52] | CZ | 10.03.2021 | |
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/51] | CZ | 10.03.2021 | |
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/50] | CZ | 10.03.2021 | |
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2021/48] | CZ | 10.03.2021 | |
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/46] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/38] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/37] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/36] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/35] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
NO | 10.06.2021 | ||
Former [2021/33] | FI | 10.03.2021 | |
LT | 10.03.2021 | ||
NO | 10.06.2021 |