blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2794099

EP2794099 - HYDROCONVERSION CATALYST COMPRISING AT LEAST A ZEOLITE, VIII AND VIB GROUP METALS, AND PREPARATION THEREOF [Right-click to bookmark this link]
Former [2014/44]CATALYST USABLE IN HYDROCONVERSION AND INCLUDING AT LEAST ONE ZEOLITE AND GROUP VIII AND VIB METALS, AND PREPARATION OF THE CATALYST
[2019/01]
StatusNo opposition filed within time limit
Status updated on  13.03.2020
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  05.04.2019
FormerGrant of patent is intended
Status updated on  21.12.2018
FormerExamination is in progress
Status updated on  23.03.2018
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
IFP Energies nouvelles
1 & 4 avenue de Bois-Préau
92500 Rueil-Malmaison / FR
For all designated states
Total Raffinage France
2 place Jean Millier
La Défense
92400 Courbevoie / FR
[2017/44]
Former [2014/44]For all designated states
IFP Energies nouvelles
1 & 4, avenue de Bois-Préau
92852 Rueil-Malmaison Cedex / FR
For all designated states
Total Raffinage France
2 place Jean Millier
La Défense
92400 Courbevoie / FR
Inventor(s)01 / SIMON, Laurent
34 rue Louis Goux
Les Jardins Mirabeau
F-69100 Villeurbanne / FR
02 / GUICHARD, Bertrand
385 rue Pascal
F-38140 Izeaux / FR
03 / LAPISARDI, Grégory
44 rue Saint Mathieu
F-69008 Lyon / FR
04 / DULOT, Hughes
3 rue Raymond Qeneau
92500 Reuil Malmaison / FR
05 / DE GRANDI, Valentina
15 rue de la Mailleraye
76600 Le Havre / FR
06 / MINOUX, Delphine
rue des Hautes Hurées 21
B-1400 Nivelles / BE
07 / DATH, Jean-Pierre
rue d'Ath 53
B-7970 Beloeil / BE
 [2014/44]
Representative(s)IFP Energies nouvelles
Département Propriété Industrielle
Rond Point de l'échangeur de Solaize
BP3
69360 Solaize / FR
[2019/19]
Application number, filing date12813900.327.11.2012
[2019/19]
WO2012FR00488
Priority number, dateFR2011000402522.12.2011         Original published format: FR 1104025
[2014/44]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2013093229
Date:27.06.2013
Language:FR
[2013/26]
Type: A1 Application with search report 
No.:EP2794099
Date:29.10.2014
Language:FR
The application published by WIPO in one of the EPO official languages on 27.06.2013 takes the place of the publication of the European patent application.
[2014/44]
Type: B1 Patent specification 
No.:EP2794099
Date:08.05.2019
Language:FR
[2019/19]
Search report(s)International search report - published on:EP27.06.2013
ClassificationIPC:B01J29/076, B01J29/16, B01J29/78, B01J35/00, B01J37/00, B01J37/02, B01J37/28, B01J37/26, C10G47/20, B01J27/14, B01J31/00, B01J37/20
[2014/44]
CPC:
B01J37/20 (EP,RU,US); B01J29/076 (EP,RU,US); B01J31/34 (RU,US);
B01J29/064 (EP,US); B01J29/166 (EP,RU,US); B01J29/7815 (EP,RU,US);
B01J31/0209 (EP,RU,US); B01J31/04 (EP,RU,US); B01J35/30 (EP,RU,US);
B01J37/0009 (EP,US); B01J37/0203 (EP,RU,US); B01J37/0205 (EP,RU,US);
B01J37/26 (EP,RU,US); B01J37/28 (EP,RU,US); C10G47/20 (EP,RU,US);
B01J2229/42 (EP,RU,US); B01J27/188 (EP,US); B01J27/19 (EP,RU,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/44]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:KATALYSATOR ZUR HYDROCONVERSION ENTHALTEND MINDESTENS EINEN ZEOLITH, VIII UND VIB METALLE UND DESSEN HERSTELLUNG[2019/01]
English:HYDROCONVERSION CATALYST COMPRISING AT LEAST A ZEOLITE, VIII AND VIB GROUP METALS, AND PREPARATION THEREOF[2019/01]
French:CATALYSEUR UTILISABLE EN HYDROCONVERSION COMPRENANT AU MOINS UNE ZÉOLITHE ET DES METAUX DES GROUPES VIII ET VIB ET PREPARATION DU CATALYSEUR[2014/44]
Former [2014/44]KATALYSATOR ZUR VERWENDUNG IN EINER HYDROKONVERSION MIT MINDESTENS EINEM ZEOLITH SOWIE GRUPPE-VIII- UND VIB-METALLEN UND HERSTELLUNG DES KATALYSATORS
Former [2014/44]CATALYST USABLE IN HYDROCONVERSION AND INCLUDING AT LEAST ONE ZEOLITE AND GROUP VIII AND VIB METALS, AND PREPARATION OF THE CATALYST
Entry into regional phase22.07.2014National basic fee paid 
22.07.2014Designation fee(s) paid 
22.07.2014Examination fee paid 
Examination procedure22.07.2014Examination requested  [2014/44]
13.02.2015Amendment by applicant (claims and/or description)
27.03.2018Despatch of a communication from the examining division (Time limit: M04)
13.09.2018Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
09.11.2018Reply to a communication from the examining division
21.12.2018Communication of intention to grant the patent
26.03.2019Fee for grant paid
26.03.2019Fee for publishing/printing paid
26.03.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  27.03.2018
Opposition(s)11.02.2020No opposition filed within time limit [2020/16]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
09.11.2018Request for further processing filed
09.11.2018Full payment received (date of receipt of payment)
Request granted
23.11.2018Decision despatched
Fees paidRenewal fee
01.12.2014Renewal fee patent year 03
30.11.2015Renewal fee patent year 04
30.11.2016Renewal fee patent year 05
30.11.2017Renewal fee patent year 06
30.11.2018Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.11.2012
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
MK08.05.2019
MT08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB27.11.2019
IE27.11.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
[2022/31]
Former [2021/34]HU27.11.2012
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
MT08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB27.11.2019
IE27.11.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/32]HU27.11.2012
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB27.11.2019
IE27.11.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/31]AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB27.11.2019
IE27.11.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/26]AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
GB27.11.2019
IE27.11.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/48]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
GB27.11.2019
IE27.11.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/46]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
IE27.11.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/36]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/35]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
LU27.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/34]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
CH30.11.2019
LI30.11.2019
Former [2020/25]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/17]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/14]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
SM08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/12]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/11]AL08.05.2019
AT08.05.2019
CZ08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/10]AL08.05.2019
AT08.05.2019
CZ08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/09]AL08.05.2019
CZ08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/51]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/50]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
RS08.05.2019
SE08.05.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/49]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
SE08.05.2019
NO08.08.2019
PT08.09.2019
Former [2019/48]ES08.05.2019
FI08.05.2019
LT08.05.2019
SE08.05.2019
NO08.08.2019
PT08.09.2019
Former [2019/47]ES08.05.2019
FI08.05.2019
LT08.05.2019
NO08.08.2019
Cited inInternational search[Y]EP1577007  (COSMO OIL CO LTD [JP]) [Y] 1-16 * abstract * * paragraph [0026] - paragraph [0034] * * paragraph [0042] - paragraph [0066] * * paragraph [0089] - paragraph [0107] * * paragraph [0111] - paragraph [0117] * * example 10 *;
 [A]WO2006077326  (TOTAL FRANCE [FR], et al) [A] 1-16 * page 3, line 29 - page 4, line 14 * * page 5, line 3 - line 30 * * abstract * * page 8, line 8 - line 23 * * page 11, line 31 - line 34 * * example - *;
 [A]EP1900430  (CHINA PETROLEUM & CHEMICAL [CN], et al) [A] 1-16 * abstract * * paragraph [0002] * * paragraph [0009] - paragraph [0016] * * paragraph [0019] * * paragraph [0029] - paragraph [0048] * * example - *;
 [Y]EP2072127  (COSMO OIL CO LTD [JP]) [Y] 1-16 * abstract * * paragraph [0017] * * paragraph [0023] - paragraph [0030] * * paragraph [0032] * * example - * * claim 1 *;
 [A]WO2010020714  (INST FRANCAIS DU PETROLE [FR], et al) [A] 1-16 * abstract * * page 3, line 19 - page 4, line 20 * * page 8, line 29 - line 33 ** example - *;
 [YD]WO2011080407  (IFP ENERGIES NOUVELLES [FR], et al) [YD] 1-16 * abstract * * page 2, line 9 - page 4, line 18 * * page 5, line 35 - page 7, line 37 * * example - * * claim - *
by applicantFR1100043
 US5232578
 US6524470
 WO2007126419
 WO2011030807
 WO2011080407
    - GRIBOVAL, BLANCHARD; PAYEN; FOUMIER; DUBOIS, CATALYSIS TODAY, (1998), vol. 45, page 277
    - GRIBOVAL; BLANCHARD; GENGEMBRE; PAYEN; FOURNIER; DUBOIS; BEMARD, JOURNAL OF CATALYSIS, (1999), vol. 188, page 102
    - M. T. POPE, Heteropoly and Isopoly oxometalates, SPRINGER VERLAG, page 8
    - C. REICHARDT, Organic Chemistry, WILEY-VCH, (2003), pages 472 - 474
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.