EP2732562 - APPARATUS AND METHOD FOR BEAM LOCKING IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.09.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 16.10.2020 | ||
Former | Grant of patent is intended Status updated on 02.07.2020 | ||
Former | Examination is in progress Status updated on 13.10.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 443-742 / KR | [2014/21] | Inventor(s) | 01 /
CHANG, Young-Bin 206-1102, 40, Dongan-ro Dongan-gu Anyang-si Gyeonggi-do 431-739 / KR | 02 /
TAORI, Rakesh 115-1804, 363, Hyowon-ro Yeongtong-gu Suwon-si Gyeonggi-do 443-751 / KR | [2020/47] |
Former [2014/21] | 01 /
CHANG, Young-Bin 206-1102 40 Dongan-ro Dongan-gu Anyang-si Gyeonggi-do 431-739 / KR | ||
02 /
TAORI, Rakesh 115-1804 363 Hyowon-ro Yeongtong-gu Suwon-si Gyeonggi-do 443-751 / KR | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2014/21] | Application number, filing date | 12814659.4 | 29.06.2012 | [2020/47] | WO2012KR05166 | Priority number, date | KR20110070330 | 15.07.2011 Original published format: KR 20110070330 | [2014/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2013012185 | Date: | 24.01.2013 | Language: | EN | [2013/04] | Type: | A2 Application without search report | No.: | EP2732562 | Date: | 21.05.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.01.2013 takes the place of the publication of the European patent application. | [2014/21] | Type: | B1 Patent specification | No.: | EP2732562 | Date: | 18.11.2020 | Language: | EN | [2020/47] | Search report(s) | International search report - published on: | KR | 11.04.2013 | (Supplementary) European search report - dispatched on: | EP | 22.12.2014 | Classification | IPC: | H04B7/06, H04B7/08, H04B7/04, H01Q3/24, H01Q1/12, H01Q1/24, H01Q3/26 | [2020/30] | CPC: |
H01Q1/1257 (EP,KR,US);
H01Q1/246 (EP,KR,US);
H01Q3/26 (EP,KR,US);
H04B7/0617 (EP,KR,US);
H04B7/063 (KR);
H04B7/0695 (EP);
|
Former IPC [2015/04] | H04B7/04, H01Q3/24, H04B7/08 | ||
Former IPC [2014/21] | H04B7/04, H01Q3/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR STRAHLUNGSABSCHIRMUNG IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM | [2014/21] | English: | APPARATUS AND METHOD FOR BEAM LOCKING IN A WIRELESS COMMUNICATION SYSTEM | [2014/21] | French: | APPAREIL ET PROCÉDÉ DE VERROUILLAGE DE FAISCEAU DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2014/21] | Entry into regional phase | 14.01.2014 | National basic fee paid | 14.01.2014 | Search fee paid | 14.01.2014 | Designation fee(s) paid | 14.01.2014 | Examination fee paid | Examination procedure | 14.01.2014 | Examination requested [2014/21] | 13.07.2015 | Amendment by applicant (claims and/or description) | 13.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 14.02.2018 | Reply to a communication from the examining division | 29.08.2019 | Despatch of a communication from the examining division (Time limit: M04) | 06.01.2020 | Reply to a communication from the examining division | 03.07.2020 | Communication of intention to grant the patent | 06.10.2020 | Fee for grant paid | 06.10.2020 | Fee for publishing/printing paid | 06.10.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.10.2017 | Opposition(s) | 19.08.2021 | No opposition filed within time limit [2021/43] | Fees paid | Renewal fee | 31.03.2014 | Renewal fee patent year 03 | 10.06.2015 | Renewal fee patent year 04 | 10.06.2016 | Renewal fee patent year 05 | 12.06.2017 | Renewal fee patent year 06 | 22.06.2018 | Renewal fee patent year 07 | 21.06.2019 | Renewal fee patent year 08 | 24.06.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.06.2012 | AL | 18.11.2020 | AT | 18.11.2020 | CY | 18.11.2020 | CZ | 18.11.2020 | DK | 18.11.2020 | EE | 18.11.2020 | ES | 18.11.2020 | FI | 18.11.2020 | HR | 18.11.2020 | IT | 18.11.2020 | LT | 18.11.2020 | LV | 18.11.2020 | MC | 18.11.2020 | MK | 18.11.2020 | MT | 18.11.2020 | PL | 18.11.2020 | RO | 18.11.2020 | RS | 18.11.2020 | SI | 18.11.2020 | SK | 18.11.2020 | SM | 18.11.2020 | BG | 18.02.2021 | NO | 18.02.2021 | GR | 19.02.2021 | IS | 18.03.2021 | PT | 18.03.2021 | IE | 29.06.2021 | LU | 29.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | [2024/41] |
Former [2024/22] | HU | 29.06.2012 | |
AL | 18.11.2020 | ||
AT | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
MK | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/29] | HU | 29.06.2012 | |
AL | 18.11.2020 | ||
AT | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/24] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/34] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/23] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/21] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/18] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
LU | 29.06.2021 | ||
Former [2022/10] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2022/08] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/51] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/49] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/48] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/45] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/37] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/36] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/35] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/34] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/33] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/32] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/28] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/25] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/24] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
LV | 18.11.2020 | ||
RS | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/23] | FI | 18.11.2020 | |
LV | 18.11.2020 | ||
RS | 18.11.2020 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/22] | FI | 18.11.2020 | |
RS | 18.11.2020 | ||
NO | 18.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/21] | FI | 18.11.2020 | |
PT | 18.03.2021 | ||
Former [2021/20] | FI | 18.11.2020 | Documents cited: | Search | [XI]US2006232468 (PARKER STEVE C J [GB], et al) [X] 1,11 * paragraph [0079] - paragraph [0084]; figures 5,6 *[I] 2-10; | [XI]US2007054617 (NIKOLAJEVIC VLADIMIR [DE], et al) [X] 1,11 * paragraphs [0010] , [0025] , [0030] * [I] 2-10,12-15; | [XI]US7472409 (LINTON JEB R [US]) [X] 1,11 * Abstract; column 1, line 67 - column 2, line 5; figure 1 * [I] 2-10 | International search | [X]US6184825 (WEHNER JAMES W [US], et al); | [A]US2005179579 (PINDER SHANE D [CA], et al); | [A]US2007205943 (NASSIRI-TOUSSI KARIM [US], et al); | [A]US2010164802 (LI QINGHUA [US], et al) |