EP2725845 - TERMINAL, TRANSMITTING DEVICE, RECEPTION QUALITY REPORTING METHOD AND RECEPTION METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.03.2019 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 13.04.2018 | ||
Former | Grant of patent is intended Status updated on 20.12.2017 | ||
Former | Examination is in progress Status updated on 07.04.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Panasonic Intellectual Property Corporation of America 20000 Mariner Avenue, Suite 200 Torrance, CA 90503 / US | [2018/20] |
Former [2014/30] | For all designated states Panasonic Intellectual Property Corporation of America 20000 Mariner Avenue Suite 200 Torrance CA 90503 / US | ||
Former [2014/18] | For all designated states Panasonic Corporation 1006 Oaza Kadoma Kadoma-shi, Osaka 571-8501 / JP | Inventor(s) | 01 /
NISHIO, Akihiko c/o Panasonic Corporation Intellectual Property Center Planning and Management Group 7F OBP Panasonic Tower, 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | 02 /
SUZUKI, Hidetoshi c/o Panasonic Corporation Intellectual Property Center Planning and Management Group 7F OBP Panasonic Tower, 2-1-61, Shiromi, Chuo-kuo Osaka 540-6207 / JP | 03 /
HOSHINO, Masayuki c/o Panasonic Corporation Intellectual Property Center Planning and Management Group 7F OBP Panasonic Tower, 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | 04 /
MATSUO, Hidenori c/o Panasonic Corporation Intellectual Property Center Planning and Management Group 7F OBP Panasonic Tower, 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | 05 /
TAMURA, Takashi c/o Panasonic Corporation Intellectual Property Center Planning and Management Group 7F OBP Panasonic Tower, 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | [2018/20] |
Former [2014/18] | 01 /
NISHIO, Akihiko Panasonic Corporation Intell. Property Center, Planning & Managem.Group 7F OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | ||
02 /
SUZUKI, Hidetoshi Panasonic Corporation Intell. Property Center, Planning & Managem.Group 7F OBP Panasonic Tower 2-1-61, Shiromi, Chuo-kuo Osaka 540-6207 / JP | |||
03 /
HOSHINO, Masayuki Panasonic Corporation Intell. Property Center, Planning & Managem.Group 7F OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | |||
04 /
MATSUO, Hidenori Panasonic Corporation Intell. Property Center, Planning & Managem.Group 7F OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | |||
05 /
TAMURA, Takashi Panasonic Corporation Intell. Property Center, Planning & Managem.Group 7F OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka 540-6207 / JP | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/20] |
Former [2014/18] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Leopoldstrasse 4 80802 München / DE | Application number, filing date | 12822889.7 | 01.06.2012 | [2018/20] | WO2012JP03636 | Priority number, date | JP20110171710 | 05.08.2011 Original published format: JP 2011171710 | JP20110217298 | 30.09.2011 Original published format: JP 2011217298 | [2014/18] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013021531 | Date: | 14.02.2013 | Language: | JA | [2013/07] | Type: | A1 Application with search report | No.: | EP2725845 | Date: | 30.04.2014 | Language: | EN | [2014/18] | Type: | B1 Patent specification | No.: | EP2725845 | Date: | 16.05.2018 | Language: | EN | [2018/20] | Search report(s) | International search report - published on: | JP | 14.02.2013 | (Supplementary) European search report - dispatched on: | EP | 24.03.2015 | Classification | IPC: | H04B7/024, H04B7/06, H04L5/00, H04W52/14, // H04W16/28, H04W36/00, H04W52/24, H04W72/08 | [2017/51] | CPC: |
H04L5/0035 (EP,US);
H04B7/024 (EP,US);
H04B7/0626 (US);
H04B7/0632 (EP,US);
H04L43/16 (US);
H04L5/00 (US);
H04L5/005 (EP,US);
H04W16/32 (US);
H04W24/08 (US);
H04W24/10 (US);
H04W52/146 (EP,US);
H04W72/02 (US);
H04W72/0473 (US);
H04W76/27 (EP,US);
H04B7/0639 (EP,US);
H04L5/001 (EP,US);
H04W36/0088 (EP,US);
H04W52/242 (EP,US);
|
Former IPC [2015/17] | H04W36/00, // H04W16/28, H04B7/02, H04B7/06 | ||
Former IPC [2014/18] | H04W24/10, H04W16/28, H04W28/16 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ENDGERÄT, SENDEVORRICHTUNG, VERFAHREN ZUM MELDEN DER EMPFANGSQUALITÄT UND EMPFANGSVERFAHREN | [2014/18] | English: | TERMINAL, TRANSMITTING DEVICE, RECEPTION QUALITY REPORTING METHOD AND RECEPTION METHOD | [2014/18] | French: | TERMINAL, DISPOSITIF D'ÉMISSION, PROCÉDÉ DE RAPPORT DE QUALITÉ DE RÉCEPTION ET PROCÉDÉ DE RÉCEPTION | [2014/18] | Entry into regional phase | 23.01.2014 | Translation filed | 23.01.2014 | National basic fee paid | 23.01.2014 | Search fee paid | 23.01.2014 | Designation fee(s) paid | 23.01.2014 | Examination fee paid | Examination procedure | 23.01.2014 | Examination requested [2014/18] | 23.10.2015 | Amendment by applicant (claims and/or description) | 07.04.2017 | Despatch of a communication from the examining division (Time limit: M04) | 16.08.2017 | Reply to a communication from the examining division | 21.12.2017 | Communication of intention to grant the patent | 06.04.2018 | Fee for grant paid | 06.04.2018 | Fee for publishing/printing paid | 06.04.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18167222.1 / EP3373650 | EP22194926.6 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.04.2017 | Opposition(s) | 19.02.2019 | No opposition filed within time limit [2019/17] | Fees paid | Renewal fee | 27.06.2014 | Renewal fee patent year 03 | 19.06.2015 | Renewal fee patent year 04 | 31.03.2016 | Renewal fee patent year 05 | 27.06.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.06.2012 | AL | 16.05.2018 | AT | 16.05.2018 | CY | 16.05.2018 | CZ | 16.05.2018 | DK | 16.05.2018 | EE | 16.05.2018 | ES | 16.05.2018 | FI | 16.05.2018 | HR | 16.05.2018 | IT | 16.05.2018 | LT | 16.05.2018 | LV | 16.05.2018 | MC | 16.05.2018 | MK | 16.05.2018 | NL | 16.05.2018 | PL | 16.05.2018 | PT | 16.05.2018 | RO | 16.05.2018 | RS | 16.05.2018 | SE | 16.05.2018 | SI | 16.05.2018 | SK | 16.05.2018 | SM | 16.05.2018 | TR | 16.05.2018 | IE | 01.06.2018 | LU | 01.06.2018 | MT | 01.06.2018 | BE | 30.06.2018 | CH | 30.06.2018 | LI | 30.06.2018 | BG | 16.08.2018 | NO | 16.08.2018 | GR | 17.08.2018 | IS | 16.09.2018 | [2020/33] |
Former [2020/31] | HU | 01.06.2012 | |
AL | 16.05.2018 | ||
AT | 16.05.2018 | ||
CY | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
MK | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
PT | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
MT | 01.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2020/27] | HU | 01.06.2012 | |
AL | 16.05.2018 | ||
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
PT | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
MT | 01.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2020/16] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
MT | 01.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2020/08] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
MT | 01.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/51] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/26] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/24] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/21] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/19] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
IE | 01.06.2018 | ||
LU | 01.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/17] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
LU | 01.06.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/15] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/11] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/10] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/09] | DK | 16.05.2018 | |
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/08] | DK | 16.05.2018 | |
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2018/52] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2018/51] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
Former [2018/50] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
Former [2018/49] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
LT | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
Former [2018/47] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
LT | 16.05.2018 | ||
NO | 16.08.2018 | Documents cited: | Search | [I]JP2011004212 (SHARP KK) [I] 1-24 * figures 4A-4D,6-8,10,12 *; | [P]US2012088458 (NOGAMI TOSHIZO [JP], et al) [P] * paragraph [0075] - paragraph [0077]; figure 6 * * paragraph [0118] - paragraph [0121]; figure 10 * * paragraph [0129] - paragraph [0132]; figure 12 *; | [E]WO2013020520 (MEDIATEK INC [CN], et al) [E] 1-24 * page 4, line 20 - line 30; figure 2 * * page 7, line 13 - page 9, line 23; figure 6 *; | [T] - "Further Considerations on Scenario3", 3GPP DRAFT; R1-113064 FURTHER CONSIDERATIONS ON SCENARIO3_HITACHI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111003), vol. RAN WG1, no. Zhuhai; 20111010, XP050538090 [T] 1-24 * page 3 - page 5 * | International search | [A] - ZTE, "Views on Rel-11 CoMP", 3GPP TSG RAN WG1 MEETING #63BIS, R1-110573, (201101), pages 1 - 2, XP050490430 | [A] - SAMSUNG, "Discussions on CSI-RS port selection for non-uniform networks with low-power nodes", 3GPP TSG-RAN1#65 MEETING, R1-111469, (201105), pages 1 - 3, XP050491151 | [A] - PANASONIC, "CoMP feedback overhead reduction based on precoded RS", 3GPP TSG RAN WG1 MEETING #58B, R1-093949, (200910), pages 1 - 3, XP050388449 | [A] - PANASONIC, "Flexible CoMP Operation based on Dedicated CSI-RS Configuration", 3GPP TSG RAN WG1 MEETING #65, R1-111587, (201105), pages 1 - 5, XP050491234 | [A] - MARVELL, "High level views for CoMP Feedback for Release 11", 3GPP TSG-RAN WG1 #63BIS, R1- 110268, (201101), pages 1 - 2, XP050490368 |