EP2749022 - STORING MULTIPLE INSTANCES OF CONTENT SCRAMBLED BY A SINGLE CODE WORD [Right-click to bookmark this link] | |||
Former [2014/27] | STORING MULTIPLE INSTANCES OF CONTENT | ||
[2019/21] | Status | No opposition filed within time limit Status updated on 26.02.2021 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 20.03.2020 | ||
Former | Grant of patent is intended Status updated on 14.11.2019 | ||
Former | Request for examination was made Status updated on 15.10.2019 | ||
Former | Grant of patent is intended Status updated on 03.06.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states DISH Technologies L.L.C. 9601 S. Meridian Boulevard Englewood, CO 80112 / US | [2019/25] |
Former [2014/27] | For all designated states EchoStar Technologies L.L.C. 100 Inverness Terrace East Englewood, CO 80112 / US | Inventor(s) | 01 /
MARTCH, Henry Gregg 23244 Barnsley Lane Parker, Colorado 80138 / US | 02 /
KUMMER, David A. 8947 South Green Meadows Lane Highlands Ranch, Colorado 80126 / US | 03 /
KENNEDY, John T. 1264 South Corona Street Denver, Colorado 80210 / US | [2014/27] | Representative(s) | Sadler, Peter Frederick Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2020/17] |
Former [2014/27] | Sadler, Peter Frederick Reddie & Grose LLP 16 Theobalds Road London WC1X 8PL / GB | Application number, filing date | 12825430.7 | 23.08.2012 | [2020/17] | WO2012US52011 | Priority number, date | US201161526665P | 23.08.2011 Original published format: US 201161526665 P | US201113302852 | 22.11.2011 Original published format: US201113302852 | [2014/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013028835 | Date: | 28.02.2013 | Language: | EN | [2013/09] | Type: | A1 Application with search report | No.: | EP2749022 | Date: | 02.07.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.02.2013 takes the place of the publication of the European patent application. | [2014/27] | Type: | B1 Patent specification | No.: | EP2749022 | Date: | 22.04.2020 | Language: | EN | [2020/17] | Search report(s) | International search report - published on: | US | 28.02.2013 | (Supplementary) European search report - dispatched on: | EP | 03.02.2015 | Classification | IPC: | H04N7/167, H04N21/4408 | [2015/10] | CPC: |
H04N5/76 (EP,BR,US);
H04N21/4334 (US);
H04N21/2347 (EP,BR,US);
H04N21/2365 (EP,BR,US);
H04N21/42623 (US);
H04N21/4263 (US);
H04N21/4383 (US);
H04N21/4408 (EP,US);
H04N21/458 (US);
|
Former IPC [2014/27] | H04N7/167 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SPEICHERN VON MEHREREN INHALTSINSTANZEN, DIE MIT EINEM EINZELNEN CODE-WORD ENTSCHLÜSSELT WERDEN | [2019/21] | English: | STORING MULTIPLE INSTANCES OF CONTENT SCRAMBLED BY A SINGLE CODE WORD | [2019/21] | French: | STOCKAGE D'INSTANCES MULTIPLES DE CONTENU, BROUILLÉES À PARTIR D'UN SEUL MOT DE CODE | [2019/21] |
Former [2014/27] | SPEICHERUNG MEHRERER INHALTSINSTANZEN | ||
Former [2014/27] | STORING MULTIPLE INSTANCES OF CONTENT | ||
Former [2014/27] | STOCKAGE D'INSTANCES MULTIPLES DE CONTENU | Entry into regional phase | 17.12.2013 | National basic fee paid | 17.12.2013 | Search fee paid | 17.12.2013 | Designation fee(s) paid | 17.12.2013 | Examination fee paid | Examination procedure | 17.12.2013 | Examination requested [2014/27] | 27.08.2015 | Amendment by applicant (claims and/or description) | 04.06.2019 | Communication of intention to grant the patent | 14.10.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 15.11.2019 | Communication of intention to grant the patent | 11.03.2020 | Fee for grant paid | 11.03.2020 | Fee for publishing/printing paid | 11.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.06.2019 | Opposition(s) | 25.01.2021 | No opposition filed within time limit [2021/13] | Fees paid | Renewal fee | 13.08.2014 | Renewal fee patent year 03 | 10.08.2015 | Renewal fee patent year 04 | 11.08.2016 | Renewal fee patent year 05 | 14.08.2017 | Renewal fee patent year 06 | 10.08.2018 | Renewal fee patent year 07 | 15.08.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.08.2012 | AL | 22.04.2020 | AT | 22.04.2020 | CY | 22.04.2020 | CZ | 22.04.2020 | DK | 22.04.2020 | EE | 22.04.2020 | ES | 22.04.2020 | FI | 22.04.2020 | HR | 22.04.2020 | IT | 22.04.2020 | LT | 22.04.2020 | LV | 22.04.2020 | MC | 22.04.2020 | MK | 22.04.2020 | MT | 22.04.2020 | PL | 22.04.2020 | RO | 22.04.2020 | RS | 22.04.2020 | SE | 22.04.2020 | SI | 22.04.2020 | SK | 22.04.2020 | SM | 22.04.2020 | TR | 22.04.2020 | BG | 22.07.2020 | NO | 22.07.2020 | GR | 23.07.2020 | IS | 22.08.2020 | IE | 23.08.2020 | LU | 23.08.2020 | PT | 24.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | [2022/32] |
Former [2022/27] | HU | 23.08.2012 | |
AL | 22.04.2020 | ||
AT | 22.04.2020 | ||
CY | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
MT | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
TR | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
PT | 24.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2022/26] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
TR | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
PT | 24.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/37] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
PT | 24.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/36] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
LU | 23.08.2020 | ||
PT | 24.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/24] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
LU | 23.08.2020 | ||
PT | 24.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/20] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
LU | 23.08.2020 | ||
PT | 24.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/18] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/10] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/09] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/08] | AL | 22.04.2020 | |
DK | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/04] | AL | 22.04.2020 | |
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/01] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/51] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/50] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/48] | FI | 22.04.2020 | |
LT | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/47] | LT | 22.04.2020 | |
NO | 22.07.2020 | ||
IS | 22.08.2020 | ||
Former [2020/46] | IS | 22.08.2020 | Documents cited: | Search | [IY]WO0241625 (SCM MICROSYSTEMS GMBH [DE]) [I] 1-5,10-12 * page 4, line 25 - page 5, line 11; figure 1 * [Y] 6-9; | [Y]US2010232604 (EKLUND II DON C [US]) [Y] 6-9 * paragraph [0020]; figure 4 ** paragraph [0035] * | International search | [X]US6701528 (ARSENAULT ROBERT G [US], et al); | [A]US2005271365 (HISATOMI SHUICHI [JP]); | [A]US2009178098 (WESTBROOK PAUL [US], et al); | [Y]US2010158480 (JUNG JOON YOUNG [KR], et al); | [A]WO2011027236 (NDS LTD [GB], et al); | [A] - JUNG ET AL., "Design and Implementation of a Multi-stream CableCARD with a High-Speed DVB- Common Descrambler", PROCEEDINGS OF THE 14TH ANNUAL ACM INTERNATIONAL CONFERENCE ON MULTIMEDIA (MM'06), (20061023), pages 165 - 168, URL: http://kusu.comp.nus.edu.sg/proceedings/mm06/mm/p165.pdf, (20121015), XP055140006 DOI: http://dx.doi.org/10.1145/1180639.1180686 |