EP2749119 - MOBILE TERMINAL AND CONTROLLING METHOD THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.10.2018 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 27.10.2017 | ||
Former | Grant of patent is intended Status updated on 20.07.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL, IS | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states LG Electronics Inc. 20, Yeouido-dong Yeongdeungpo-gu Seoul 150-721 / KR | [2014/27] | Inventor(s) | 01 /
KIM, Jonghwan LG Electronics Inc. IP Group 60-39 Gasan-dong Geumcheon-gu Seoul 153-801 / KR | [2014/27] | Representative(s) | Katérle, Axel Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstraße 2 81541 München / DE | [2017/48] |
Former [2014/27] | Katérle, Axel Wuesthoff & Wuesthoff Patent- und Rechtsanwälte Schweigerstraße 2 81541 München / DE | Application number, filing date | 12825574.2 | 03.02.2012 | [2017/48] | WO2012KR00644 | Priority number, date | KR20110084377 | 24.08.2011 Original published format: KR 20110084377 | KR20110084378 | 24.08.2011 Original published format: KR 20110084378 | [2014/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013027903 | Date: | 28.02.2013 | Language: | EN | [2013/09] | Type: | A1 Application with search report | No.: | EP2749119 | Date: | 02.07.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.02.2013 takes the place of the publication of the European patent application. | [2014/27] | Type: | B1 Patent specification | No.: | EP2749119 | Date: | 29.11.2017 | Language: | EN | [2017/48] | Search report(s) | International search report - published on: | KR | 28.02.2013 | (Supplementary) European search report - dispatched on: | EP | 26.03.2015 | Classification | IPC: | H04W88/02, G03H1/04, G06F3/14, G03H1/22, H04M1/725, // H04M1/57 | [2015/18] | CPC: |
G03H1/2294 (EP,US);
H04M1/72484 (US);
H04M1/576 (EP,US);
H04M1/7243 (EP,US);
H04M2250/54 (EP,US)
|
Former IPC [2014/27] | H04W88/02, G03H1/04, G06F3/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MOBILES ENDGERÄT UND STEUERUNGSVERFAHREN DAFÜR | [2014/27] | English: | MOBILE TERMINAL AND CONTROLLING METHOD THEREOF | [2014/27] | French: | TERMINAL MOBILE ET SON PROCÉDÉ DE COMMANDE | [2014/27] | Entry into regional phase | 06.03.2014 | National basic fee paid | 06.03.2014 | Search fee paid | 06.03.2014 | Designation fee(s) paid | 06.03.2014 | Examination fee paid | Examination procedure | 06.03.2014 | Examination requested [2014/27] | 23.10.2015 | Amendment by applicant (claims and/or description) | 21.07.2017 | Communication of intention to grant the patent | 20.10.2017 | Fee for grant paid | 20.10.2017 | Fee for publishing/printing paid | 20.10.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.07.2017 | Opposition(s) | 30.08.2018 | No opposition filed within time limit [2018/45] | Fees paid | Renewal fee | 06.03.2014 | Renewal fee patent year 03 | 23.02.2015 | Renewal fee patent year 04 | 22.02.2016 | Renewal fee patent year 05 | 17.02.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.02.2012 | AL | 29.11.2017 | AT | 29.11.2017 | CY | 29.11.2017 | CZ | 29.11.2017 | DK | 29.11.2017 | EE | 29.11.2017 | ES | 29.11.2017 | FI | 29.11.2017 | HR | 29.11.2017 | IT | 29.11.2017 | LT | 29.11.2017 | LV | 29.11.2017 | MC | 29.11.2017 | MK | 29.11.2017 | NL | 29.11.2017 | PL | 29.11.2017 | PT | 29.11.2017 | RO | 29.11.2017 | RS | 29.11.2017 | SE | 29.11.2017 | SI | 29.11.2017 | SK | 29.11.2017 | SM | 29.11.2017 | TR | 29.11.2017 | IE | 03.02.2018 | LU | 03.02.2018 | MT | 03.02.2018 | BE | 28.02.2018 | BG | 28.02.2018 | CH | 28.02.2018 | LI | 28.02.2018 | NO | 28.02.2018 | GR | 01.03.2018 | IS | 29.03.2018 | [2020/33] |
Former [2020/31] | HU | 03.02.2012 | |
AT | 29.11.2017 | ||
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
MK | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
PT | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SI | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
TR | 29.11.2017 | ||
IE | 03.02.2018 | ||
LU | 03.02.2018 | ||
MT | 03.02.2018 | ||
BE | 28.02.2018 | ||
BG | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2020/28] | HU | 03.02.2012 | |
AT | 29.11.2017 | ||
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
PT | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SI | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
TR | 29.11.2017 | ||
IE | 03.02.2018 | ||
LU | 03.02.2018 | ||
MT | 03.02.2018 | ||
BE | 28.02.2018 | ||
BG | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2020/16] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SI | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
TR | 29.11.2017 | ||
IE | 03.02.2018 | ||
LU | 03.02.2018 | ||
MT | 03.02.2018 | ||
BE | 28.02.2018 | ||
BG | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2020/08] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SI | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
IE | 03.02.2018 | ||
LU | 03.02.2018 | ||
MT | 03.02.2018 | ||
BE | 28.02.2018 | ||
BG | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2019/12] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SI | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
IE | 03.02.2018 | ||
LU | 03.02.2018 | ||
BE | 28.02.2018 | ||
BG | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2019/09] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SI | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
IE | 03.02.2018 | ||
LU | 03.02.2018 | ||
BG | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/52] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SI | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
LU | 03.02.2018 | ||
BG | 28.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/44] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
MC | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
BG | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/40] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RO | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
BG | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/39] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
IT | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
BG | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/37] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
NL | 29.11.2017 | ||
PL | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SK | 29.11.2017 | ||
SM | 29.11.2017 | ||
BG | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/35] | AT | 29.11.2017 | |
CY | 29.11.2017 | ||
CZ | 29.11.2017 | ||
DK | 29.11.2017 | ||
EE | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
NL | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
SK | 29.11.2017 | ||
BG | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/34] | AT | 29.11.2017 | |
DK | 29.11.2017 | ||
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
NL | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
BG | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/24] | AT | 29.11.2017 | |
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
LT | 29.11.2017 | ||
LV | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
BG | 28.02.2018 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/23] | AT | 29.11.2017 | |
ES | 29.11.2017 | ||
FI | 29.11.2017 | ||
HR | 29.11.2017 | ||
LT | 29.11.2017 | ||
RS | 29.11.2017 | ||
SE | 29.11.2017 | ||
NO | 28.02.2018 | ||
GR | 01.03.2018 | ||
Former [2018/22] | ES | 29.11.2017 | |
FI | 29.11.2017 | ||
LT | 29.11.2017 | ||
NO | 28.02.2018 | Documents cited: | Search | [I]EP2040133 (ALPS ELECTRIC CO LTD [JP]) [I] 1-15 * abstract * * column 1, lines 12-21 * * column 4, line 47 - column 7, line 39 *; | [A]US2010060809 (OKUDA MICHIHIRO [JP], et al) [A] 2-14 * abstract * * paragraphs [0003] , [0006] , [0038] - [0053] - [0063] , [0126] - [0130] - [0146] *; | [A]US2010201532 (CHOI HAN SHIL [KR]) [A] 2-14 * abstract ** paragraphs [0024] , [0025] , [0030] , [0042] - [0044] - [0058] *; | [T] - P. Hariharan, "Optical holography- Principes, techniques and applications", Optical holography- Principes, techniques and applications, Cambridge, Cambridge University Press, (19910101), pages 65 - 69, XP055085933 [T] 1,15 * figure 5.2 * | International search | [A]KR100800854B (SAMSUNG ELECTRONICS CO., LTD.); | [A]US2010097439 (KROLL BO [GB], et al); | [A]KR20110045686 (LG ELECTRONICS INC.) | Examination | - PATURZO M ET AL, "Super-resolution in digital holography by a two-dimensional dynamic phase grating", OPTICS EXPRESS, OSA PUBLISHING, (20081013), vol. 16, no. 21, doi:10.1364/OE.16.017107, ISSN 1094-4087, pages 17107 - 17118, XP007910622 DOI: http://dx.doi.org/10.1364/OE.16.017107 | by applicant | EP2040133 | US2010060809 |