EP2756149 - CUTTING ELEMENTS FOR EARTH-BORING TOOLS, EARTH-BORING TOOLS INCLUDING SUCH CUTTING ELEMENTS AND RELATED METHODS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.08.2019 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 21.09.2018 | ||
Former | Grant of patent is intended Status updated on 03.04.2018 | ||
Former | Examination is in progress Status updated on 11.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Baker Hughes, a GE company, LLC P.O. Box 4740 Houston, TX 77210-4740 / US | [2018/38] |
Former [2014/30] | For all designated states Baker Hughes Incorporated P.O. Box 4740 Houston, TX 77210-4740 / US | Inventor(s) | 01 /
DIGIOVANNI, Anthony, A. 8910 Opper Ln. Houston, TX 77064 / US | [2014/30] | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater Königstraße 28 70173 Stuttgart / DE | [2018/43] |
Former [2014/30] | Jeffrey, Philip Michael Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 12831302.0 | 13.09.2012 | [2018/43] | WO2012US54999 | Priority number, date | US201161535772P | 16.09.2011 Original published format: US 201161535772 P | [2014/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013040123 | Date: | 21.03.2013 | Language: | EN | [2013/12] | Type: | A1 Application with search report | No.: | EP2756149 | Date: | 23.07.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.03.2013 takes the place of the publication of the European patent application. | [2014/30] | Type: | B1 Patent specification | No.: | EP2756149 | Date: | 24.10.2018 | Language: | EN | [2018/43] | Search report(s) | International search report - published on: | KR | 21.03.2013 | (Supplementary) European search report - dispatched on: | EP | 07.06.2016 | Classification | IPC: | E21B10/567, C09K3/14 | [2016/27] | CPC: |
E21B10/5676 (EP,US);
B24D99/005 (EP,US);
E21B10/55 (EP,US);
E21B10/5673 (EP,US);
E21B10/5735 (EP,US);
Y02E10/10 (EP)
|
Former IPC [2014/30] | E21B10/46, C09K3/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHNEIDEELEMENTE FÜR ERDBOHRWERKZEUGE, ERDBOHRWERKZEUGE MIT SOLCHEN SCHNEIDEELEMENTEN UND ZUGEHÖRIGE VERFAHREN | [2014/30] | English: | CUTTING ELEMENTS FOR EARTH-BORING TOOLS, EARTH-BORING TOOLS INCLUDING SUCH CUTTING ELEMENTS AND RELATED METHODS | [2014/30] | French: | ÉLÉMENTS DE COUPE POUR DES OUTILS DE FORAGE DU SOL, OUTILS DE FORAGE DU SOL COMPRENANT DE TELS ÉLÉMENTS DE COUPE ET PROCÉDÉS ASSOCIÉS | [2014/30] | Entry into regional phase | 17.03.2014 | National basic fee paid | 17.03.2014 | Search fee paid | 17.03.2014 | Designation fee(s) paid | 17.03.2014 | Examination fee paid | Examination procedure | 17.03.2014 | Examination requested [2014/30] | 21.09.2016 | Amendment by applicant (claims and/or description) | 11.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 14.03.2017 | Reply to a communication from the examining division | 13.04.2017 | Despatch of a communication from the examining division (Time limit: M06) | 17.10.2017 | Reply to a communication from the examining division | 04.04.2018 | Communication of intention to grant the patent | 13.08.2018 | Fee for grant paid | 13.08.2018 | Fee for publishing/printing paid | 13.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.11.2016 | Opposition(s) | 25.07.2019 | No opposition filed within time limit [2019/40] | Fees paid | Renewal fee | 12.09.2014 | Renewal fee patent year 03 | 11.09.2015 | Renewal fee patent year 04 | 13.09.2016 | Renewal fee patent year 05 | 12.09.2017 | Renewal fee patent year 06 | 11.09.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.09.2012 | AL | 24.10.2018 | AT | 24.10.2018 | CY | 24.10.2018 | CZ | 24.10.2018 | DK | 24.10.2018 | EE | 24.10.2018 | ES | 24.10.2018 | FI | 24.10.2018 | HR | 24.10.2018 | LT | 24.10.2018 | LV | 24.10.2018 | MC | 24.10.2018 | MK | 24.10.2018 | MT | 24.10.2018 | NL | 24.10.2018 | PL | 24.10.2018 | RO | 24.10.2018 | RS | 24.10.2018 | SE | 24.10.2018 | SI | 24.10.2018 | SK | 24.10.2018 | SM | 24.10.2018 | TR | 24.10.2018 | BG | 24.01.2019 | GR | 25.01.2019 | IS | 24.02.2019 | PT | 24.02.2019 | [2022/31] |
Former [2021/34] | HU | 13.09.2012 | |
AL | 24.10.2018 | ||
AT | 24.10.2018 | ||
CY | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
MT | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2021/32] | HU | 13.09.2012 | |
AL | 24.10.2018 | ||
AT | 24.10.2018 | ||
CY | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2021/26] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CY | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2020/25] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2020/17] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/50] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/40] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/37] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SM | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/35] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/34] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
DK | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/26] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/25] | AT | 24.10.2018 | |
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/24] | AT | 24.10.2018 | |
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/23] | AT | 24.10.2018 | |
ES | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
BG | 24.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/22] | FI | 24.10.2018 | |
LT | 24.10.2018 | ||
NL | 24.10.2018 | ||
PL | 24.10.2018 | ||
BG | 24.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/21] | FI | 24.10.2018 | |
LT | 24.10.2018 | ||
NL | 24.10.2018 | ||
IS | 24.02.2019 | ||
Former [2019/20] | LT | 24.10.2018 | |
NL | 24.10.2018 | ||
Former [2019/17] | NL | 24.10.2018 | Documents cited: | Search | [XAYI]US6065554 (TAYLOR MALCOLM ROY [GB], et al) [X] 1,2,5,6,8,10-12 * figures 2, 9, 10, 13, 14 * [A] 3,13,14 [Y] 15 [I] 4,7,9; | [XAI]US2005247492 (SHEN YUELIN [US], et al) [X] 1,2,4,5,10-12 * figures 8, 11 * [A] 3,13,14 [I] 7-9; | [Y]US2008006448 (ZHANG YOUHE [US], et al) [Y] 15 * figure 6A ** paragraph [0044] - paragraph [0046] *; | [XAI]US2011031036 (PATEL SURESH G [US]) [X] 1,2,4,7,10-12 * figures 9, 9A, 9B, 9C, 9F, 10, 10A, 10B, 10C, 14 * [A] 3,13,14 [I] 9 | International search | [X]US6065554 (TAYLOR MALCOLM ROY [GB], et al); | [A]US6550556 (MIDDLEMISS STEWART [US], et al); | [Y]US2008006448 (ZHANG YOUHE [US], et al); | [A]US2008264696 (DOURFAYE ALFAZAZI [FR], et al) | by applicant | US2011031036 |