EP2789392 - HORIZONTAL DRY MILL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 17.01.2021 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Ashizawa Finetech Ltd Akanehama 1-chome 4-2 Narashino-shi Chiba-ken Chiba 275-8572 / JP | [2014/42] | Inventor(s) | 01 /
ISHIKAWA Tsuyoshi c/o ASHIZAWA FINETECH LTD. 1-4-2 Akanehama Narashino-shi Chiba 275-8572 / JP | 02 /
HAGIWARA Naoki c/o ASHIZAWA FINETECH LTD. 1-4-2 Akanehama Narashino-shi Chiba 275-8572 / JP | 03 /
YAMADA Toshihiro c/o ASHIZAWA FINETECH LTD. 1-4-2 Akanehama Narashino-shi Chiba 275-8572 / JP | [2014/42] | Representative(s) | Jacobacci Coralis Harle 32, rue de l'Arcade 75008 Paris / FR | [2021/21] |
Former [2014/42] | Coralis Harle 14-16 Rue Ballu 75009 Paris / FR | Application number, filing date | 12855356.7 | 06.12.2012 | [2021/21] | WO2012JP81616 | Priority number, date | JP20110269632 | 09.12.2011 Original published format: JP 2011269632 | [2014/42] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013084981 | Date: | 13.06.2013 | Language: | JA | [2013/24] | Type: | A1 Application with search report | No.: | EP2789392 | Date: | 15.10.2014 | Language: | EN | [2014/42] | Type: | B1 Patent specification | No.: | EP2789392 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | International search report - published on: | JP | 13.06.2013 | (Supplementary) European search report - dispatched on: | EP | 29.06.2015 | Classification | IPC: | B02C17/16, B02C17/18 | [2014/42] | CPC: |
B02C17/163 (EP,US);
B02C17/16 (EP,US);
B02C17/18 (EP,US);
B02C17/183 (EP,US);
B02C17/1835 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | HORIZONTALE TROCKENMÜHLE | [2014/42] | English: | HORIZONTAL DRY MILL | [2014/42] | French: | BROYEUR HORIZONTAL POUR BROYAGE À SEC | [2021/03] |
Former [2014/42] | APPAREIL HORIZONTAL POUR BROYAGE À SEC | Entry into regional phase | 05.06.2014 | Translation filed | 05.06.2014 | National basic fee paid | 05.06.2014 | Search fee paid | 05.06.2014 | Designation fee(s) paid | 05.06.2014 | Examination fee paid | Examination procedure | 18.02.2013 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 05.06.2014 | Examination requested [2014/42] | 11.01.2016 | Amendment by applicant (claims and/or description) | 18.01.2021 | Communication of intention to grant the patent | 14.04.2021 | Fee for grant paid | 14.04.2021 | Fee for publishing/printing paid | 14.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.01.2021 | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Fees paid | Renewal fee | 03.10.2014 | Renewal fee patent year 03 | 03.11.2015 | Renewal fee patent year 04 | 14.10.2016 | Renewal fee patent year 05 | 06.10.2017 | Renewal fee patent year 06 | 26.10.2018 | Renewal fee patent year 07 | 17.02.2020 | Renewal fee patent year 08 | 06.10.2020 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 31.12.2019 | 08   M06   Fee paid on   17.02.2020 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.12.2012 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | NL | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | PT | 27.09.2021 | GB | 06.12.2021 | IE | 06.12.2021 | LU | 06.12.2021 | BE | 31.12.2021 | FR | 31.12.2021 | [2024/22] |
Former [2023/27] | HU | 06.12.2012 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 06.12.2021 | ||
IE | 06.12.2021 | ||
LU | 06.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
Former [2023/24] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 06.12.2021 | ||
IE | 06.12.2021 | ||
LU | 06.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
Former [2023/01] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 06.12.2021 | ||
IE | 06.12.2021 | ||
LU | 06.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
Former [2022/48] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 06.12.2021 | ||
IE | 06.12.2021 | ||
LU | 06.12.2021 | ||
Former [2022/47] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 06.12.2021 | ||
LU | 06.12.2021 | ||
Former [2022/46] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 06.12.2021 | ||
Former [2022/33] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/26] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/10] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/08] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/04] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | Documents cited: | Search | [XAY]EP0015647 (EIGER ENG [GB]) [X] 1 * page 3 - page 6; figure 1 * [A] 4-7 [Y] 2,3; | [Y]JPH05253509 (.) [Y] 2,3* abstract * | International search | [A]JPS4626537B (DAINIPPON INK AND CHEMICALS, INC.); | [X]JPS518670 (DRAISWERKE GMBH); | [Y]US4844355 (KEMP JR PRESTON B [US], et al); | [Y]JPH045237U (ASADA TEKKO KABUSHIKI KAISHA); | [Y]JPH04193360 (HOSOKAWA MICRON KK); | [Y]JPH05253509 (FIMATEC LTD., SABURO YASHIMA); | [Y]JP2000126635 (CHUO KAKOKI) | by applicant | JPH078034Y | JP2007319726 |