blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2795847

EP2795847 - SYSTEM AND METHOD FOR PROVIDING METERING DATA [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.03.2023
Database last updated on 20.05.2024
FormerThe patent has been granted
Status updated on  02.04.2022
FormerGrant of patent is intended
Status updated on  30.11.2021
FormerExamination is in progress
Status updated on  18.09.2020
FormerGrant of patent is intended
Status updated on  10.05.2020
FormerExamination is in progress
Status updated on  23.11.2018
Most recent event   Tooltip19.04.2024Lapse of the patent in a contracting state
New state(s): CY
published on 22.05.2024 [2024/21]
Applicant(s)For all designated states
Itron Networked Solutions, Inc.
230 W Tasman Drive
San Jose, California 95134 / US
[2019/27]
Former [2017/24]For all designated states
Silver Spring Networks, Inc.
230 W Tasman Drive
San Jose, CA 95134 / US
Former [2014/44]For all designated states
Silver Spring Networks, Inc.
555 Broadway Street
Redwood City, CA 94063 / US
Inventor(s)01 / FLAMMER, George H., III
575 Broadway Street
Redwood City, California 94063 / US
02 / DOYLE, John
575 Broadway Street
Redwood City, California 94063 / US
03 / HUGHES, Sterling
575 Broadway Street
Redwood City, California 94063 / US
 [2014/44]
Representative(s)Morrall, Jonathan Ian McLachlan, et al
Kilburn & Strode LLP
Lacon London
84 Theobalds Road
London WC1X 8NL / GB
[2022/18]
Former [2014/44]Hoefer & Partner
Pilgersheimer Straße 20
81543 München / DE
Application number, filing date12859039.520.12.2012
[2022/18]
WO2012US71077
Priority number, dateUS20111333572222.12.2011         Original published format: US201113335722
US201261603112P24.02.2012         Original published format: US 201261603112 P
[2014/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013096690
Date:27.06.2013
Language:EN
[2013/26]
Type: A1 Application with search report 
No.:EP2795847
Date:29.10.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 27.06.2013 takes the place of the publication of the European patent application.
[2014/44]
Type: B1 Patent specification 
No.:EP2795847
Date:04.05.2022
Language:EN
[2022/18]
Search report(s)International search report - published on:KR27.06.2013
(Supplementary) European search report - dispatched on:EP19.06.2015
ClassificationIPC:H04L12/28, H04L29/06, H04L29/08, G01D4/02
[2015/30]
CPC:
H04L67/12 (EP); G01D4/02 (EP); Y02B90/20 (EP);
Y04S20/30 (EP)
Former IPC [2014/44]H04L12/28, H04L29/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/44]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM UND VERFAHREN ZUR BEREITSTELLUNG VON MESSDATEN[2014/44]
English:SYSTEM AND METHOD FOR PROVIDING METERING DATA[2014/44]
French:SYSTÈME ET PROCÉDÉ DE FOURNITURE DE DONNÉES DE MESURE[2014/44]
Entry into regional phase25.06.2014National basic fee paid 
25.06.2014Search fee paid 
25.06.2014Designation fee(s) paid 
25.06.2014Examination fee paid 
Examination procedure25.06.2014Examination requested  [2014/44]
18.01.2016Amendment by applicant (claims and/or description)
21.11.2018Despatch of a communication from the examining division (Time limit: M04)
30.03.2019Reply to a communication from the examining division
11.05.2020Communication of intention to grant the patent
16.09.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
16.10.2020Despatch of a communication from the examining division (Time limit: M04)
16.02.2021Reply to a communication from the examining division
01.12.2021Communication of intention to grant the patent
28.03.2022Fee for grant paid
28.03.2022Fee for publishing/printing paid
28.03.2022Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  21.11.2018
Opposition(s)07.02.2023No opposition filed within time limit [2023/15]
Fees paidRenewal fee
29.12.2014Renewal fee patent year 03
28.12.2015Renewal fee patent year 04
27.12.2016Renewal fee patent year 05
27.12.2017Renewal fee patent year 06
31.12.2018Renewal fee patent year 07
13.12.2019Renewal fee patent year 08
14.12.2020Renewal fee patent year 09
30.11.2021Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.12.2012
AL04.05.2022
AT04.05.2022
CY04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
IT04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
GB20.12.2022
IE20.12.2022
LU20.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
[2024/21]
Former [2024/18]HU20.12.2012
AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
IT04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
GB20.12.2022
IE20.12.2022
LU20.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2024/11]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
IT04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
GB20.12.2022
IE20.12.2022
LU20.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2023/52]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
GB20.12.2022
IE20.12.2022
LU20.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2023/49]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
GB20.12.2022
IE20.12.2022
LU20.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/48]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
GB20.12.2022
IE20.12.2022
LU20.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/47]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
GB20.12.2022
LU20.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/38]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
LU20.12.2022
Former [2023/25]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2023/17]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2023/09]AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2023/07]AT04.05.2022
DK04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RS04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2022/51]AT04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RS04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2022/50]AT04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RS04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
PT05.09.2022
Former [2022/49]AT04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
PT05.09.2022
Former [2022/48]AT04.05.2022
ES04.05.2022
FI04.05.2022
LT04.05.2022
NL04.05.2022
SE04.05.2022
NO04.08.2022
PT05.09.2022
Former [2022/47]AT04.05.2022
ES04.05.2022
FI04.05.2022
LT04.05.2022
SE04.05.2022
NO04.08.2022
PT05.09.2022
Documents cited:Search   [ ] - No further relevant documents disclosed
International search[A]US2007139163  (POWELL KEVIN J [US], et al);
 [X]US2008186145  (MANLEY JATHAN W [US], et al);
 [A]US2008297312  (MOSHFEGHI MEHRAN [US]);
 [A]KR20090045001  (BROADCOM CORP [US]);
 [Y]US2009184804  (SEPPA HEIKKI [FI])
by applicantUS2008186145
 US2009184804
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.