EP2796266 - THERMOPLASTIC RESIN MOLDING AND MANUFACTURING METHOD THEREFOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.01.2018 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 03.02.2017 | ||
Former | Grant of patent is intended Status updated on 23.01.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Toyota Boshoku Kabushiki Kaisha 1-1, Toyoda-cho Kariya-shi, Aichi 448-8651 / JP | [2014/44] | Inventor(s) | 01 /
HASHIBA Masanori c/o TOYOTA BOSHOKU KABUSHIKI KAISHA 1-1 Toyoda-cho Kariya-shi Aichi 448-8651 / JP | 02 /
TAMAKI Kousuke c/o TOYOTA BOSHOKU KABUSHIKI KAISHA 1-1 Toyoda-cho Kariya-shi Aichi 448-8651 / JP | 03 /
MARUYAMA Kazushige c/o TOYOTA BOSHOKU KABUSHIKI KAISHA 1-1 Toyoda-cho Kariya-shi Aichi 448-8651 / JP | 04 /
FUJII Kaoru c/o TOYOTA BOSHOKU KABUSHIKI KAISHA 1-1 Toyoda-cho Kariya-shi Aichi 448-8651 / JP | 05 /
SHIRASAKI Tomohiro c/o TOYOTA BOSHOKU KABUSHIKI KAISHA 1-1 Toyoda-cho Kariya-shi Aichi 448-8651 / JP | [2014/44] | Representative(s) | TBK Bavariaring 4-6 80336 München / DE | [2014/44] | Application number, filing date | 12860610.0 | 12.11.2012 | [2017/10] | WO2012JP79305 | Priority number, date | JP20110280342 | 21.12.2011 Original published format: JP 2011280342 | [2014/44] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013094343 | Date: | 27.06.2013 | Language: | JA | [2013/26] | Type: | A1 Application with search report | No.: | EP2796266 | Date: | 29.10.2014 | Language: | EN | [2014/44] | Type: | B1 Patent specification | No.: | EP2796266 | Date: | 08.03.2017 | Language: | EN | [2017/10] | Search report(s) | International search report - published on: | JP | 27.06.2013 | (Supplementary) European search report - dispatched on: | EP | 07.10.2014 | Classification | IPC: | B29C45/00, C08L101/00, C08J5/04, C08L23/12, // B29C33/70, B29K101/12, B29K105/06 | [2016/16] | CPC: |
B29C45/0005 (EP,CN,US);
C08L23/12 (US);
B29C45/0013 (US);
C08J5/045 (EP,US);
B29C33/70 (EP,US);
B29K2911/10 (EP,US);
|
Former IPC [2014/44] | B29C45/00, C08L101/00, B29K101/12, B29K105/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | THERMOPLASTISCHE HARZFORM UND HERSTELLUNGSVERFAHREN DAFÜR | [2014/44] | English: | THERMOPLASTIC RESIN MOLDING AND MANUFACTURING METHOD THEREFOR | [2014/44] | French: | MOULAGE DE RÉSINE THERMOPLASTIQUE ET PROCÉDÉ DE FABRICATION S'Y RAPPORTANT | [2014/44] | Entry into regional phase | 09.05.2014 | Translation filed | 09.05.2014 | National basic fee paid | 09.05.2014 | Search fee paid | 09.05.2014 | Designation fee(s) paid | 09.05.2014 | Examination fee paid | Examination procedure | 23.05.2013 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 09.05.2014 | Examination requested [2014/44] | 31.03.2015 | Amendment by applicant (claims and/or description) | 05.05.2015 | Despatch of a communication from the examining division (Time limit: M04) | 15.07.2015 | Reply to a communication from the examining division | 28.10.2015 | Despatch of a communication from the examining division (Time limit: M04) | 18.02.2016 | Reply to a communication from the examining division | 08.09.2016 | Cancellation of oral proceeding that was planned for 13.09.2016 | 13.09.2016 | Date of oral proceedings (cancelled) | 04.10.2016 | Communication of intention to grant the patent | 23.01.2017 | Fee for grant paid | 23.01.2017 | Fee for publishing/printing paid | 23.01.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.05.2015 | Opposition(s) | 11.12.2017 | No opposition filed within time limit [2018/07] | Fees paid | Renewal fee | 28.11.2014 | Renewal fee patent year 03 | 30.11.2015 | Renewal fee patent year 04 | 29.11.2016 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.11.2012 | AL | 08.03.2017 | AT | 08.03.2017 | CY | 08.03.2017 | CZ | 08.03.2017 | DK | 08.03.2017 | EE | 08.03.2017 | ES | 08.03.2017 | FI | 08.03.2017 | HR | 08.03.2017 | IT | 08.03.2017 | LT | 08.03.2017 | LV | 08.03.2017 | MC | 08.03.2017 | MK | 08.03.2017 | NL | 08.03.2017 | PL | 08.03.2017 | RO | 08.03.2017 | RS | 08.03.2017 | SE | 08.03.2017 | SI | 08.03.2017 | SK | 08.03.2017 | SM | 08.03.2017 | TR | 08.03.2017 | BG | 08.06.2017 | NO | 08.06.2017 | GR | 09.06.2017 | IS | 08.07.2017 | PT | 10.07.2017 | GB | 12.11.2017 | IE | 12.11.2017 | LU | 12.11.2017 | MT | 12.11.2017 | BE | 30.11.2017 | CH | 30.11.2017 | FR | 30.11.2017 | LI | 30.11.2017 | [2020/34] |
Former [2020/15] | HU | 12.11.2012 | |
AT | 08.03.2017 | ||
CY | 08.03.2017 | ||
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
MK | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
TR | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
GB | 12.11.2017 | ||
IE | 12.11.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
FR | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2019/51] | HU | 12.11.2012 | |
AT | 08.03.2017 | ||
CY | 08.03.2017 | ||
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
MK | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
GB | 12.11.2017 | ||
IE | 12.11.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
FR | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2019/47] | HU | 12.11.2012 | |
AT | 08.03.2017 | ||
CY | 08.03.2017 | ||
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
GB | 12.11.2017 | ||
IE | 12.11.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
FR | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2019/31] | HU | 12.11.2012 | |
AT | 08.03.2017 | ||
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
GB | 12.11.2017 | ||
IE | 12.11.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
FR | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/50] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
GB | 12.11.2017 | ||
IE | 12.11.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
FR | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/49] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
IE | 12.11.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
FR | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/45] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
IE | 12.11.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/43] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
LU | 12.11.2017 | ||
MT | 12.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/41] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
LU | 12.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/33] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
MC | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/14] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SI | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
Former [2018/09] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
DK | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
Former [2017/51] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SK | 08.03.2017 | ||
SM | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
PT | 10.07.2017 | ||
Former [2017/50] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
NL | 08.03.2017 | ||
PL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SK | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
Former [2017/49] | AT | 08.03.2017 | |
CZ | 08.03.2017 | ||
EE | 08.03.2017 | ||
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
IT | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
NL | 08.03.2017 | ||
RO | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
SK | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
IS | 08.07.2017 | ||
Former [2017/48] | CZ | 08.03.2017 | |
ES | 08.03.2017 | ||
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
NL | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | ||
Former [2017/41] | ES | 08.03.2017 | |
FI | 08.03.2017 | ||
HR | 08.03.2017 | ||
LT | 08.03.2017 | ||
LV | 08.03.2017 | ||
NL | 08.03.2017 | ||
RS | 08.03.2017 | ||
SE | 08.03.2017 | ||
BG | 08.06.2017 | ||
NO | 08.06.2017 | ||
GR | 09.06.2017 | Documents cited: | Search | [X]WO2004071744 (AGRO FIBRES TECHNOLOGIES PLAST [FR], et al) [X] 1,3,5 * claims 1,6,13-18,48-52 *; | [X]US2009182071 (JOYCE ROBERT C [US]) [X] 1,3-5 * the whole document *; | [A]EP2292698 (TOYOTA BOSHOKU KK [JP]) [A] 1,3-5 * paragraph [0012] - paragraph [0043] * * paragraph [0067] - paragraph [0079]; claims 1-9 *; | [A] - Erwin Bürkle ET AL, "Process Energy-Efficient Processing of Natural Fiber-Reinforced Plastics", Kunststoffe international, (2009), pages 25 - 29, URL: http://www.kraussmaffei.de/media/files/kmdownloadlocal/en/Natural_Fiber-Reinforced_Plastics_022009.pdf, (20140924), XP055142331 [A] 2 * the whole document * | International search | [A]JP2002003723 (KONISHIROKU PHOTO IND); | [A]JP2005029601 (FUJI PHOTO FILM CO LTD); | [A]JP2005035134 (TORAY INDUSTRIES); | [X]JP2005105245 (NEC CORP); | [A]JP2008088358 (TOYOTA MOTOR CORP, et al) | by applicant | WO2004076044 | JP2006117006 | JP2006138203 | JP2011005742 |